EPID - L-2018-LLA-0054, Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (Approved, Closed) 31 January 2018, 7 March 2018"31 January 2018, 7 March 2018" contains more than three components required for a date interpretation. - 1 August 2019 | |
|---|---|
Request for: - License Amendment Approved, Closed | |
Initiation
| |
| From: | |
MONTHYEARML18072A0102018-01-31031 January 2018, 7 March 2018
[table view]Title: Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML18072A0132018-01-31031 January 2018 Title: WCAP-18295-NP, Revision 0, Technical Justification for Eliminating Accumulator Line Rupture as the Structural Design Basis, Using Leak-Before-Break Methodology ML18072A0142018-01-31031 January 2018 Title: WCAP-18302-NP, Revision 0, Technical Justification for Eliminating Residual Heat Removal Line Rupture as the Structural Design Basis, Using Leak-Before-Before Break Methodology AEP-NRC-2018-02, WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology2018-01-31031 January 2018 Title: WCAP-18309-NP, Revision 0, Technical Justification for Eliminating Safety Injection Line Rupture as the Structural Design Basis Using Leak-Before-Break Methodology ML18075A1142018-03-26026 March 2018 Title: Request for Withholding Information from Public Disclosure ML18096A7642018-04-0606 April 2018 Title: NRR E-mail Capture - Donald C. Cook, Unit 1 - Acceptance Review for Application of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML18204A3722018-07-19019 July 2018 Title: NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML18263A1542018-09-14014 September 2018 Title: NRR E-mail Capture - D.C. Cook Unit No. 1 - RAI for Leak-Before-Break LAR ML19011A3512019-01-11011 January 2019 Title: NRR E-mail Capture - Request for Additional Information DC Cook Unit 1 Leak Before Break Amendment ML19072A1432019-03-12012 March 2019 Title: NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19084A0002019-03-20020 March 2019 Title: NRR E-mail Capture - Resubmitted: Draft Request for Additional Information DC Cook Unit 1 - Leak-Before-Break LAR ML19170A3622019-08-0101 August 2019 Title: Issuance of Amendment Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping 2018-09-14 | |