NRC Generic Letter 1981-025: Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans
ML031080613
Person / Time
Site: Beaver Valley, Millstone, Mcguire, Nine Mile Point, Palo Verde, Perry, Fermi, Catawba, Harris, Wolf Creek, Saint Lucie, Watts Bar, Hope Creek, Grand Gulf, Sequoyah, Byron, Braidwood, Susquehanna, Summer, Columbia, Seabrook, Limerick, River Bend, Diablo Canyon, Callaway, Vogtle, Waterford, Clinton, South Texas, San Onofre, Comanche Peak, Midland, Bellefonte, LaSalle, 05000363, 05000000, Zimmer, Washington Public Power Supply System, Shoreham, Satsop, Bailly, Atlantic Nuclear Power Plant, Cherokee, Marble Hill, Hartsville, Phipps Bend, Yellow Creek
Issue date: 06/13/1981
From: Eisenhut D G
Office of Nuclear Reactor Regulation
To:
References
GL-81-025, NUDOCS 8107100320
Download: ML031080613 (4)


CftLPA REG(,,F EUNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, D. C. 20555TO ALL HOLDERS OF CONSTRUCTION PERMITSGentlemen:SUBJECT: CHANGE IN IMPLEMENTING SCHEDULE FOR SUBMISSION AND EVALUATIONOF UPGRADED EMERGENCY PLANS (Generic Letter No. 81-25)On October 31, 1980, you were provided a clarification letter (NUREG-0737)regarding approved TMI Action.Plan items. The implementation schedulefor item III.A.2 Emergency Preparedness in Enclosure 2, NUREG-0737, impliesthat upgraded emergency plans to meet the criteria of NUREG-0654, Revision 1,"Criteria for Preparation and Evaluation of Radiological Emergency ResponsePlans and Preparedness in Support of Nuclear Power Plants" must be submittedprior to fuel load authorization. Full compliance with all elements ofNUREG 0654 is unnecessary for this stage of startup operations.Enclosed is a copy of page 2-11 of Enclosure 2, NUREG-0737, changing theimplementing schedule to require upgraded emergency plans from prior to"fuel load" to prior to "full-power" authorization. The requirementsnecessary for a "fuel load" authorization will be determined on a case-by-case basis.Sincerely,Darrell G. Eisenhut, DirectorDivision of LicensingOffice of Nuclear Reactor RegulationEnclosure:Page 2-11 of Enclosure 2,NUREG-0737PDR ADOC3 0500027 5F D

s -IV IlENCLOSURE 2 (COtITInUED)Clarifi- Implemen- Plant Require- Clarifi- TechCarion tatlon Applica- ments cation Spec.Iten Title Description Schedule b 1ity Issued Issued Req. Remarks1i.K.3 rFnal Recomfendations, c. New analyses In accordance All

  • Encl. 3 NoB6O task force with review(Continued) schedule31. Plant-specific analysis 1/1/03f All
  • Encl. 3 Aswith single failure required45. Manual depressurization 1/81A OWR
  • Encl. 3 No46. Michelson concerns fuel load DMR
  • Encl. 3 noIII.A.I.I Emergency Sho.t-term improvements Complete nopreparedness,short termIII.A.1.2 Upgrade emergency 1. Establish TSC OSC TOD All 9/27I79 11/9/79 Nosupport facilities EOF (interim bas'sl TOD All 92/ 1/7 To2. Design TOO T BO T OO T BO T hD3. Modifications 100 TOo TOO TOD TOD11I.A.2 Lsimrtqency 1. Upgrade aaergency plans full power All 8/19/11 NIREG- Yespreparedness to App E. 10 CFR 50 (K542. Meteorological data Full power All 6/26/80 NUREG- Yes0654111.U.1.1 Primary coolant Measure leak rates I Full power All 9/27/79 11/9/79 Yesoutside establish program to Encl. 3containment keep leakage ALARA111.0.3.3 Inplant 12 radiation 1. Provide means to Fuel load All 9/27/79 11/9/79 Yesmonitoring determine presence Encl. 3of radio1odine2. Modifications to 1/1/81 or All 9/27/79 11/9/79 Yesaccurately measure prior toradlolodine icensing Encl. 3111.0.3.4 Control-room 1. Identify and evaluate Full power All 6/26/80 End. 3 Nohabitability potential hazards2. Schedule for Full power All 6/26/00 End. 3 omodifications3. Modifications full power All 6/26/80 Encl. 3 YesAFoisr vitonts before operating license Is issued or 4 months before date indicated.*hequirement formally issued by this letter.II-nt0

PLANTS UNDER CONSTRUCTION1.2.3.4.5.Cherokee 1/2/3Beaver Valley 2St. Lucie 2Vogtle 1/2River Bend 1/250-491,50-41250-38950-424,50-458,492, 4934254596.7.8.9.10.11.12.13.Forked RiverNine Mile Point 2Millstone 3Bailly 2Limerick 1/2Hope Creek 1/2Seabrook 1/250-36350-41050-42350-36750-352,50-354,50-443,35335544414.15.16.17.18.19.20.Hartsville 1/2/3/4Phipps Bend 1/2Yellow Creek 1/2WPPSS 1/3/4/5Harris 1/2/3/4FNP50-518,50-553,50-566,50-460,50-400,50-437519,554567508,401,520, 521513, 509402, 403 PLANTS UNDER OL REVIEW1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.Clinton 1/2Byron 1/2Braidwood 1/2LaSalle 1/2Midland 1/2McGuire 2So. Texas 1/2ShorehamWaterfordGrand Gulf 1/2Diablo Canyon 1/2Susquehana 1/2St. Lucie 2Summer 1San Onofre 2/3Bellefonte 1/2Watts'Bar 1/2Sequoyah 2Comanche Peak 1/250-461/46250-454, 45550-456/45750-373, 37450-329,33050- 37050-498, 49950-32250-38250-416/41750-275, 32350-387, 38850-38950-39550-361, 36250-438, 43950-390, 39150- 32850-445, 446WPPSS-2Fermi 2Ziimmer 1Perry 1/2Palo VerdeCatawbaMarble HillWolf CreekCallaway50-39750-34150-35850-440,50-528,50-413,50-546,50-4 8250-483,441529, 530414547486