NRC Generic Letter 1981-025: Change in Implementing Schedule for Submission and Evaluation of Upgraded Emergency Plans
ML031080613
Person / Time
Site: Beaver Valley, Millstone, Mcguire, Nine Mile Point, Palo Verde, Perry, Fermi, Catawba, Harris, Wolf Creek, Saint Lucie, Watts Bar, Hope Creek, Grand Gulf, Sequoyah, Byron, Braidwood, Susquehanna, Summer, Columbia, Seabrook, Limerick, River Bend, Diablo Canyon, Callaway, Vogtle, Waterford, Clinton, South Texas, San Onofre, Comanche Peak, Midland, Bellefonte, LaSalle, 05000363, 05000000, Zimmer, Washington Public Power Supply System, Shoreham, Satsop, Bailly, Atlantic Nuclear Power Plant, Cherokee, Marble Hill, Hartsville, Phipps Bend, Yellow Creek
Issue date: 06/13/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-81-025, NUDOCS 8107100320
Download: ML031080613 (4)


Cf tLPA REG(,,

F EUNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 TO ALL HOLDERS OF CONSTRUCTION PERMITS

Gentlemen:

SUBJECT: CHANGE IN IMPLEMENTING SCHEDULE FOR SUBMISSION AND EVALUATION

OF UPGRADED EMERGENCY PLANS (Generic Letter No. 81-25)

On October 31, 1980, you were provided a clarification letter (NUREG-0737)

regarding approved TMI Action.Plan items. The implementation schedule implies for item III.A.2 Emergency Preparedness in Enclosure 2, NUREG-0737,Revision 1, that upgraded emergency plans to meet the criteria of NUREG-0654,

"Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" must be submitted prior to fuel load authorization. Full compliance with all elements of NUREG 0654 is unnecessary for this stage of startup operations.

Enclosed is a copy of page 2-11 of Enclosure 2, NUREG-0737, changing the implementing schedule to require upgraded emergency plans from prior to

"fuel load" to prior to "full-power" authorization. The requirements necessary for a "fuel load" authorization will be determined on a case- by-case basis.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Enclosure:

Page 2-11 of Enclosure 2, NUREG-0737 PDR ADOC305000275 F D

s - I

V Il ENCLOSURE 2 (COtITInUED)

Clarifi- Implemen- Plant Require- Clarifi- Tech Carion tatlon Applica- ments cation Spec.

Iten Title Description Schedule b 1ity Issued Issued Req. Remarks

1i.K.3 rFnal Recomfendations, c. New analyses Inaccordance All * Encl. 3 No B6O task force with review (Continued) schedule

31. Plant-specific analysis 1/1/03f All * Enc. 3 ho

44. Evaluate transients 1/1/lIA OUR * Encl. 3 As with single failure required

45. Manual depressurization 1/81A OWR * Encl. 3 No

46. Michelson concerns fuel load DMR * Encl. 3 no III.A.I.I

III.A.1.2 Emergency preparedness, short term Upgrade emergency Sho.t-term improvements

1. Establish TSC OSC

Complete TOD All All

9/27I79

92/

11/9/79

1/7 no No To I

support facilities EOF (interim bas'sl TOD

T BO T OO T BO T hD

I

2. Design TOO

3. Modifications 100 TOo TOO TOD TOD

11I.A.2 Lsimrtqency 1.Upgrade aaergency plans full power All 8/19/11 NIREG- Yes preparedness to App E. 10 CFR 50 (K54

2. Meteorological data Full power All 6/26/80 NUREG- Yes

0654

111.U.1.1 Primary coolant Measure leak rates I Full power All 9/27/79 11/9/79 Yes outside establish program to Encl.3 containment keep leakage ALARA

111.0.3.3 Inplant12 radiation 1.Provide means to Fuel load All 9/27/79 11/9/79 Yes monitoring determine presence Encl.3 of radio1odine

2.Modifications to 1/1/81 or All 9/27/79 11/9/79 Yes accurately measure prior to radlolodine icensing Encl. 3 -

111.0.3.4 Control-room 1. Identify and evaluate Full power All 6/26/80 End.3 No n habitability potential hazards

2. Schedule for Full power All 6/26/00 End.3 o t0

modifications

3.

Modifications full power All 6/26/80 Encl. 3 Yes AFoisr vitonts before operating license Is issued or 4 months before date indicated.

  • hequirement formally issued by this letter.

PLANTS UNDER CONSTRUCTION

Cherokee 1/2/3 50-491, 492, 493

1.

Beaver Valley 2 50-412

2.

3. St. Lucie 2 50-389 Vogtle 1/2 50-424, 425

4.

50-458, 459

5. River Bend 1/2

6.

Forked River 50-363

7.

Nine Mile Point 2 50-410

8.

Millstone 3 50-423

9.

Bailly 2 50-367

10.

50-352, 353

11. Limerick 1/2 Hope Creek 1/2 50-354, 355

12.

Seabrook 1/2 50-443, 444

13.

14.

50-518, 519, 520, 521

15. Hartsville 1/2/3/4 Phipps Bend 1/2 50-553, 554

16.

Yellow Creek 1/2 50-566, 567

17.

WPPSS 1/3/4/5 50-460, 508, 513, 509

18.

Harris 1/2/3/4 50-400, 401, 402, 403

19.

20. FNP 50-437

PLANTS UNDER OL REVIEW

1. Clinton 1/2 50-461/462

2. Byron 1/2 50-454, 455

3. Braidwood 1/2 50-456/457

4. LaSalle 1/2 50-373, 374

5. Midland 1/2 50-329,330

6. McGuire 2 50- 370

7. So. Texas 1/2 50-498, 499

8. Shoreham 50-322

9. Waterford 50-382

10. Grand Gulf 1/2 50-416/417

11. Diablo Canyon 1/2 50-275, 323

12. Susquehana 1/2 50-387, 388

13. St. Lucie 2 50-389

14. Summer 1 50-395

15. San Onofre 2/3 50-361, 362

16. Bellefonte 1/2 50-438, 439

17. Watts'Bar 1/2 50-390, 391

18. Sequoyah 2 50- 328

19. Comanche Peak 1/2 50-445, 446

20.

21. WPPSS-2 50-397

22. Fermi 2 50-341

23. Ziimmer 1 50-358

24. Perry 1/2 50-440, 441

25. Palo Verde 50-528, 529, 530

26. Catawba 50-413, 414

27. Marble Hill 50-546, 547

28. Wolf Creek 50-4 82

29. Callaway 50-483, 486

Template:GL-Nav