Integrated Inspection Report 05000336/2025004 and 05000423/2025004
ML26028A066
Person / Time
Site: Millstone  
Issue date: 01/28/2026
From: Glenn Dentel
Division of Operating Reactors
To: Carr E
Dominion Energy
References
IR 2025004
Download: ML26028A066 (0)


Text

January 28, 2026

SUBJECT:

MILLSTONE POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000336/2025004 AND 05000423/2025004

Dear Eric Carr:

On December 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Millstone Power Station, Units 2 and 3. On January 21, 2026, the NRC inspectors discussed the results of this inspection with James Petty, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Glenn T. Dentel, Acting Chief Projects Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000336 and 05000423 License Nos. DPR-65 and NPF-49

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000336 and 05000423

License Numbers:

DPR-65 and NPF-49

Report Numbers:

05000336/2025004 and 05000423/2025004

Enterprise Identifier: I-2025-004-0046

Licensee:

Dominion Energy Nuclear Connecticut, Inc.

Facility:

Millstone Power Station, Units 2 and 3

Location:

Waterford, CT

Inspection Dates:

October 1, 2025 to December 31, 2025

Inspectors:

B. Pinson, Senior Resident Inspector

D. Antonangeli, Resident Inspector

E. Bousquet, Resident Inspector

T. Fish, Senior Operations Engineer

M. Patel, Senior Operations Engineer

B. Dyke, Senior Operations Engineer

N. Eckhoff, Health Physicist

E. Chen, Reactor Inspector

Approved By:

Glenn T. Dentel, Acting Chief

Projects Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting an integrated inspection at Millstone Power Station, Units 2 and 3,

in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs

program for overseeing the safe operation of commercial nuclear power reactors. Refer to

https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 2 operated at or near rated thermal power for the entire inspection period.

Unit 3 began the inspection period at rated thermal power. On October 16, 2025, the unit shut

down for a planned maintenance outage to address reactor coolant pump seal leakage and

returned to rated thermal power on October 28, 2025. On November 4, 2025, the unit lowered

power to approximately 75 percent to repair a leak on the cover of service water check valve

3SWP*V705 and returned to rated thermal power on November 5, 2025. The unit remained at

or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with

their attached revision histories are located on the public website at http://www.nrc.gov/reading-

rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection

Program - Operations Phase. The inspectors performed activities described in IMC 2515,

Appendix DProperty "Inspection Manual Chapter" (as page type) with input value "NRC Inspection Manual 2515,</br></br>Appendix D" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process., Plant Status, observed risk significant activities, and completed on-site portions of

IPs. The inspectors reviewed selected procedures and records, observed activities, and

interviewed personnel to assess licensee performance and compliance with Commission rules

and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the adequacy of the overall preparations to protect risk-

significant systems from impending severe weather prior to the onset of heavy rain

and wind on October 10, 2025.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following

systems/trains:

(1)

Unit 3, 'A' residual heat removal train during shutdown cooling operations,

October 21, 2025

(2)

Unit 3, 'B' train of service water located in the engineered safeguards building,

November 5, 2025

(3)

Unit 3, reactor plant component cooling water system components located in the

auxiliary building, December 17, 2025

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a

walkdown and performing a review to verify program compliance, equipment functionality,

material condition, and operational readiness of the following fire areas:

(1)

Unit 3, main steam valve building (fire area MSV-1 elevation 24'6", 41', 49'6", and

71'6"), October 1, 2025

(2)

Unit 3, east switchgear room (fire area CB-2 elevation 4'6"), October 2, 2025

(3)

Unit 3, normal switchgear room (fire area SB-1), November 17, 2025

(4)

Unit 2, auxiliary building railroad bay area (fire area A-14B elevation 14'6"),

November 20, 2025

(5)

Unit 3, auxiliary building (fire area AB-1C), elevation 24 foot, November 24, 2025

(6)

Unit 3, cable spreading room (fire area CB-8), November 25, 2025

(7)

Unit 2, intake structure (fire area I-1, zone A), December 11, 2025

71111.06 - Flood Protection Measures

Flooding Sample (IP Section 03.01) (1 Sample)

(1)

The inspectors evaluated internal flooding mitigation protections in the:

Unit 2, upper 4160 volt switchgear room, west cable vault, and 480 volt west

switchgear room, December 3, 2025.

71111.07A - Heat Exchanger/Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1)

Unit 2 'A' reactor building component cooling water heat exchanger, including review

of eddy current testing from December 2 through December 4, 2025 (Work Order

(WO)53203406272)

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (2 Samples)

(1)

The inspectors reviewed and evaluated the Unit 3 licensed operator examination

failure rates for the Unit 3 requalification annual operating exams administered

October - November 2025 and the Unit 3 biennial written examinations administered

November - December 2024.

(2)

The inspectors reviewed and evaluated the licensed operator examination failure

rates for the Unit 2 requalification annual operating exam completed on

December 12, 2025.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

(1)

Biennial Requalification Written Examinations

The inspectors evaluated the quality of the Unit 3 licensed operator biennial

requalification written examinations administered November - December 2024.

Annual Requalification Operating Tests

The inspectors evaluated the adequacy of the Unit 3 annual requalification operating

test administered week of October 28, 2025.

Administration of an Annual Requalification Operating Test

The inspectors evaluated the effectiveness of the facility licensee in administering

requalification operating tests required by Title 10 of the Code of Federal Regulations

(10 CFR) 55.59(a)(2) and that the facility licensee is effectively evaluating their

licensed operators for mastery of training objectives.

Requalification Examination Security

The inspectors evaluated the ability of the facility licensee to safeguard examination

material, such that the examination is not compromised.

Remedial Training and Re-examinations

The inspectors evaluated the effectiveness of remedial training conducted by the

licensee, and reviewed the adequacy of re-examinations for licensed operators who

did not pass a required requalification examination.

Operator License Conditions

The inspectors evaluated the licensees program for ensuring that licensed operators

meet the conditions of their licenses.

Control Room Simulator

The inspectors evaluated the adequacy of the facility licensees control room

simulator in modeling the actual plant, and for meeting the requirements contained in

10 CFR 55.46.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (4 Samples)

(1)

The inspectors observed and evaluated licensed operator performance in the Unit 3

control room during solid plant operations, October 16, 2025.

(2)

The inspectors observed and evaluated licensed operator performance in the Unit 3

control room during reactor startup operations, October 26, 2025.

(3)

The inspectors observed and evaluated licensed operator performance in the Unit 3

control room during multiple diesel generators starts, as part of a maintenance

outage, during the week of November 17, 2025.

(4)

The inspectors observed and evaluated licensed operator performance in the Unit 2

control room during a period of elevated risk due to 'D' service water bay outage,

switchyard work, reactor building component cooling water heat exchanger outage,

and reactivity manipulations from December 9-10, 2025.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (4 Samples)

(1)

The inspectors observed and evaluated Unit 3 operator performance in the simulator

during just in time training for a unit shutdown, October 15, 2025.

(2)

The inspectors observed and evaluated Unit 3 operator performance in the simulator

during just in time training activities related to service water train 'A' isolation,

November 4, 2025.

(3)

The inspectors observed and evaluated operator requalification training in the Unit 2

simulator, November 4, 2025.

(4)

The inspectors observed and evaluated licensed operator requalification training in

the Unit 3 simulator, December 9, 2025.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following

structures, systems, and components (SSCs) remain capable of performing their intended

function:

(1)

Unit 3 safety-related dampers 3HVP*MOD26B, 3HVP*MOD23B, 3HVP*MOD26A,

and 3HVP*MOD23A, December 31, 2025

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to

ensure the following SSC remains capable of performing its intended function:

(1)

ASME Qualifications for replacement service water valve bonnet, SWP*V705,

following emergent replacement, November 7, 2025

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the

following planned and emergent work activities to ensure configuration changes and

appropriate work controls were addressed:

(1)

Unit 2, scheduled yellow risk due to switchyard maintenance requiring north bus

outage, October 14, 2025

(2)

Unit 3, containment closure due to a short time to boil with the reactor shutdown,

October 18, 2025

(3)

Unit 3, high risk plans in effect due to isolation of the 'A' train of service water for

replacement of a check valve bonnet at power, November 4-5, 2025

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (7 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the

following operability determinations and functionality assessments:

(1)

Unit 2, 'B' emergency diesel generator alarm response procedure entry for jacket

water low temperature along with failure of standby jacket water pump to run,

October 16, 2025

(2)

Unit 3, 'B' residual heat removal excessive seal leak, October 23, 2025 (Condition

Report (CR) 130457)

(3)

Unit 3, functionality assessment associated with leading edge flow meter degraded

transducers, November 24, 2025

(4)

Unit 2, non-vital 120 volt power supply, VR-21, to control element assembly control

board core mimic panel indication for CEA-47, December 4, 2025 (CRs 1298943,

1306753, and 1306807)

(5)

Unit 2, operability determination and engineering technical evaluation associated with

a through-wall flaw on 'A' service water header piping upstream of valve 2-SW-3.2B,

December 17, 2025 (CR 1308124)

(6)

Unit 3, steam dump isolation valves found out of position, December 19, 2025

(CR 1309651)

(7)

Unit 2, 'B' emergency diesel generator jacket water cooling system with thermal

overload discrepancy in jacket water pump motor, December 23, 2025

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1)

The inspectors evaluated reactor coolant pump seal replacement forced outage

activities from October 16, 2025, to October 28, 2025.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system

operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (8 Samples)

(1)

Unit 2, replacement of automatic control element drive mechanism (CEDM) timing

module for CEDM 68, October 3, 2025

(2)

Unit 3, repair of station blackout air valve, 3BGA-AOV84, October 6, 2025 (WO 53203468036 and CR 1302692)

(3)

Unit 2, post-maintenance testing of 'B' emergency diesel generator standby jacket

water cooling pump following thermal overload replacement, October 16, 2025 (WO 53203469358)

(4)

Unit 3, 'B' service water strainer inspection and repair, October 17, 2025 (WOs

53203469327 and 53203469499)

(5)

Unit 3, replacement of 'C' reactor coolant pump seal assembly, October 21-22, 2025

(WO 53203461347)

(6)

Unit 3, post-maintenance testing of the 'B' containment air recirculation fan following

replacement, October 24, 2025

(7)

Unit 3, post-maintenance operability testing of 'B' emergency diesel generator,

November 22, 2025 (WO 53203450180)

(8)

Unit 3, calibration and testing of 'B' chiller temperature switch M33HVK*TS1006B,

December 4, 2025 (WO 53203465243)

Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)

(1)

Beyond design basis high capacity pumps 'A' and 'B', annual and semiannual

surveillances reviewed, December 2, 2025

71114.06 - Drill Evaluation

Additional Drill and/or Training Evolution (1 Sample)

The inspectors evaluated:

(1)

Unit 1 emergency planning drill on December 4, 2025

RADIATION SAFETY

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation

Radioactive Material Storage (IP Section 03.01) (1 Sample)

The inspectors evaluated the licensees performance in controlling, labeling, and securing

the following radioactive materials:

(1)

Radioactive materials containers in warehouse 9 and stack yard.

Radioactive Waste System Walkdown (IP Section 03.02) (1 Sample)

The inspectors walked down the following accessible portions of the solid radioactive waste

systems and evaluated system configuration and functionality:

(1)

Radioactive liquid processing system

Waste Characterization and Classification (IP Section 03.03) (2 Samples)

The inspectors evaluated the following characterization and classification of radioactive

waste:

(1)

Unit 2 2R29 dry active waste 2024, L107814-1

(2)

Unit 3 ALPS resin sample, L109562-2

Shipping Records (IP Section 03.05) (3 Samples)

The inspectors evaluated the following non-excepted radioactive material shipments through

a record review:

(1)

Shipment number 25-055, UN3321, LSA II, dry active waste

(2)

Shipment number 25-067, UN3321, LSA II, U3 Carbon/Bead ALPS Resin Liner

(3)

Shipment number 25-067, UN3321, LSA II, U3 ALPS Bead/SRT Resin Liner

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

MS06: Emergency AC Power Systems (IP Section 02.05) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1)

Unit 2, July 1, 2024 through June 30, 2025

(2)

Unit 3, July 1, 2024 through June 30, 2025

OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)

(1)

November 1, 2024 through November 30, 2025

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual

Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample

(IP Section 02.16) (1 Sample)

(1)

November 1, 2024 through November 30, 2025

71152A - Annual Follow-up Problem Identification and Resolution

Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program

related to the following issues:

(1)

Review of recent trips of Units 2 and 3 emergency diesel generators and station

blackout diesel, December 3, 2025 (CR 12111444)

71152S - Semiannual Trend Problem Identification and Resolution

Semiannual Trend Review (Section 03.02) (2 Samples)

(1)

The inspectors reviewed the licensees corrective action program to identify potential

trends in Unit 3 alarm response procedure use and adherence that might be

indicative of a more significant safety issue.

(2)

The inspectors reviewed the licensees corrective action program to identify potential

trends in Unit 2 unplanned instrument air compressor outages that might be indicative

of a more significant safety issue.

INSPECTION RESULTS

Observation: Semiannual Trend Review

71152S

The inspectors evaluated a sample of Unit 3 control room operator log entries for unexpected

annunciator alarms that occurred from July 2025 through November 2025, to determine

whether issues were appropriately considered as emerging or adverse trends. The inspectors

verified that issues were appropriately evaluated by licensee staff for potential trends and

addressed within the scope of the corrective action program or through department review.

The inspectors did not identify any new trends that could indicate a more significant safety

issue. The inspectors determined that Millstone personnel identified trend issues at a low

threshold and entered them into the corrective action program for resolution.

The inspectors noted some instances where issues were entered into the operator logs, but

CRs were not written consistently or were not written due to prior CRs existing related to the

issue. This could have an impact on the ability to trend adverse conditions in the future if new

CRs are not being consistently written. The inspectors did not identify any instances where a

CR was not written when procedurally required. None of the reviewed issues impacted

system operability or functionality and Millstone personnel were monitoring the conditions.

The inspectors independently evaluated the deficiencies noted above for significance in

accordance with the guidance in IMC 0612, Appendix B, "Issue Screening," and Appendix E,

"Examples of Minor Issues." The inspectors determined that none of the conditions were

deficiencies of more than minor significance and, therefore, are not subject to enforcement

action in accordance with the NRC's Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified that no proprietary information was retained or documented in this

report.

  • On January 21, 2026, the inspectors presented the integrated inspection results to

James Petty, Site Vice President, and other members of the licensee staff.

On December 4, 2025, the inspectors presented the 71124.08 Inspection Debrief

inspection results to Mark Goolsbey, Nuclear Operations Director, and other members of

the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71152A

Corrective Action

Documents

CR 1211444

Procedures

DQR-SYS-ENG-

AA

System/Component Engineer (Initial)

Revision 0

Work Orders

53203345034