ML25247A238

From kanterella
Revision as of 00:10, 30 October 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
TSTF-600, Rev. 2, Final SE, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency
Date released: 09/15/2025 Download: ML25247A238


Final Traveler SE of TSTF-600, Rev 2 (ML25247A240)
ML25247A240
Person / Time
Site: Technical Specifications Task Force
Issue date: 09/08/2025
From: Shawn Smith
NRC/NRR/DSS
To:
Technical Specifications Task Force
References
TSTF-600, Rev. 2, EPID L-2024-PMP-0005
Download: ML25247A240 (7)
TSTF-600 Cover Letter for Final Traveler SE (ML24247A239)
ML25247A239
Person / Time
Site: Technical Specifications Task Force
Issue date: 09/08/2025
From: Shivani Mehta
NRC/NRR/DSS
To:
Technical Specifications Task Force
References
EPID L 2024-PMP-0005, TSTF-600, Rev. 2
Download: ML25247A239 (3)