ML24191A300
| ML24191A300 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/06/2024 |
| From: | Ameren Missouri, Union Electric Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML24191A265 | List:
|
| References | |
| ULNRC-06877 | |
| Download: ML24191A300 (1) | |
Text
CALLAWAY - SA i
GENERAL TABLE OF CONTENTS CHAPTER
1.0 INTRODUCTION
AND GENERAL DESCRIPTION OF PLANT CHAPTER 2.0 SITE CHARACTERISTICS 2.1 GEOGRAPHY AND DEMOGRAPHY 2.2 NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES 2.3 METEOROLOGY 2.4 HYDROLOGIC ENGINEERING 2.5 GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING CHAPTER 3.0 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS 3.3 WIND AND TORNADO LOADINGS 3.4 WATER LEVEL (FLOOD) DESIGN 3.5 MISSILE PROTECTION 3.7 SEISMIC DESIGN 3.8 DESIGN OF CATEGORY I STRUCTURES 3.8A COMPUTER PROGRAMS USED FOR ANALYSIS OF CATEGORY I STRUCTURES 3.A CONFORMANCE TO NRC REGULATORY GUIDES
CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) ii CHAPTER 4.0 REACTOR 4.1
SUMMARY
DESCRIPTION CHAPTER 8.0 ELECTRIC POWER
8.1 INTRODUCTION
8.2 OFFSITE POWER SYSTEM 8.3 ONSITE POWER SYSTEMS 8.4 ALTERNATE EMERGENCY POWER SYSTEM (AEPS)
CHAPTER 9.0 AUXILIARY SYSTEMS 9.2 WATER SYSTEMS 9.5 OTHER AUXILIARY SYSTEMS 9.5A DELETED 9.5B DELETED 9.5C DELETED 9.5D DELETED 9.5E DELETED
CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) iii CHAPTER 10.0 STEAM AND POWER CONVERSION SYSTEM CHAPTER 11.0 RADIOACTIVE WASTE MANAGEMENT CHAPTER 12.0 RADIATION PROTECTION 12.1 ENSURING THAT OCCUPATIONAL RADIATION EXPOSURES ARE AS LOW AS REASONABLY ACHIEVABLE (ALARA) 12.4 DOSE ASSESSMENT 12.5 RADIATION PROTECTION PROGRAM CHAPTER 13.0 CONDUCT OF OPERATIONS 13.1 ORGANIZATION STRUCTURE OF APPLICANT 13.2 TRAINING 13.3 EMERGENCY PLANNING 13.3A RADIOLOGICAL EMERGENCY RESPONSE PLAN 13.4 REVIEW AND AUDIT (Deleted) 13.5 PLANT PROCEDURES 13.6 INDUSTRIAL SECURITY 13.7 RISK INFORMED CATEGORIZATION AND TREATMENT
CALLAWAY - SA GENERAL TABLE OF CONTENTS (Continued) iv CHAPTER 17.0 QUALITY ASSURANCE 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE CHAPTER 18.0 RESPONSE TO NUREG-0737,
'CLARIFICATION OF TMI ACTION PLAN REQUIREMENTS