April 22, 2025 Phil Hansett, Site Vice President Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - ACKNOWLEDGEMENT OF READINESS FOR INFREQUENT INSPECTION
Dear Phil Hansett:
The U.S. Nuclear Regulatory Commission (NRC) Inspection Report 05000458/2022004 dated February 1, 2023, (Agencywide Documents Access and Management System [ADAMS]
Accession No. ML23031A228), identified that from January 1, 2022, to December 31, 2022, the NRC issued three severity level IV (SL IV) traditional enforcement violations associated with impeding the regulatory process and informed you that the NRC was evaluating whether performance of additional non-baseline inspection procedures was warranted. Subsequently, in the Annual Assessment Letter for River Bend Station - Report 05000458/2022006, dated March 21, 2023, (ADAMS Accession No. ML23055B075), and the Updated Inspection Plan for River Bend Station Report 05000458/2023005, dated August 21, 2023, (ADAMS Accession No. ML23229A568), you were informed that the Regional Administrator authorized an additional non-baseline inspection using Inspection Procedure 92723, Follow up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period. In the Annual Assessment Letter for River Bend Station - Report 05000458/2024006, dated March 11, 2025, (ADAMS Accession No. ML25065A050), the NRC noted that from January 1, 2024, to December 31, 2024, the NRC issued three traditional enforcement SL IV violations associated with impeding the regulatory process. In the same correspondence, you were again informed that the Regional Administrator authorized a non-baseline inspection using Inspection Procedure 92723. Additionally, we informed you that the scope of this inspection will include the twelve SL IV violations issued between September 30, 2022, and December 31, 2024.
This letter is to acknowledge your letter dated March 31, 2025, (ADAMS Accession No. ML25090A308), regarding River Bend Stations readiness for the performance of the infrequent inspection per Inspection Procedure 92723. Following coordination with River Bend Station, this inspection has been scheduled for July 14-18, 2025. Please contact Douglas Dodson at (817) 200-1148 with any questions concerning the details of this inspection.
P. Hansett 2
In accordance with 10 CFR 2.390, Agency Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or in the NRCs ADAMS, accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, Douglas E. Dodson II, Chief, Projects Branch C Division of Operating Reactor Safety Docket No. 05000458 License No. NPF47 Signed by Dodson, Douglas on 04/22/25
P. Hansett 3
RIVER BEND STATION - ACKNOWLEDGEMENT OF READINESS FOR INFREQUENT INSPECTION - DATED APRIL 22, 2025 DISTRIBUTION:
JMonninger, ORA JLara, ORA GMiller, DORS NTaylor, DORS DCylkowski, RC AAlen-Arias, RIV/OEDO VDricks, ORA TSmith, ORA LWilkins, OCA JDrake, NRR AMoreno, RIV/OCA RAlexander, RSLO DDodson, DORS ABetts, DORS DOuk, DORS CWynar, DORS EPowell, DORS LDay, DORS CHighley, DORS MRuffin, DORS R4-DORS-IPAT R4Enforcement DOCUMENT NAME: RIVER BEND STATION - ACKNOWLEDGEMENT OF READINESS FOR SUPPLEMENTAL INSPECTION ADAMS Accession Number: ML25108A144 X SUNSI Review By: DED1 ADAMS Yes No Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE PE:DORS/PBC BC:DORS/PBC NAME ABetts DDodson SIGNATURE
/RA/
/RA/
DATE 04/22/25 04/22/25 OFFICAL RECORD COPY