2024 IP 96001 IR Report 8
ML25035A096
Person / Time
Issue date: 02/04/2025
From:
Security Performance Evaluation Branch
To:
NRC/NRR/DRO
Berry J
Shared Package
ML25035A098 List:
References
Download: ML25035A096 (1)


Text

Baseline Inspection Completion with Certification Information By Site IR Report 8 Region No: 2 Site: 07000027 - BWX Technologies, Inc.

(BWXT)

IPC Cycle: 2024 Procedure IPE Code Title Frequency Sample Completed IMC Min Completion Sample Status Note Certify Date / By 96001 SG NRC FOF Insp CAT I Fuel Cycle Triennial 2

0 0%

Complete C

05/21/2024 - Berry, Joshua K Site Totals:

0 Region Totals:

0 Report Totals:

0 Page 1 of 2 2/3/2025 9:04:31 AM C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle NOTE: Biennial samples completed are the total of 2024 and 2025. Triennial samples completed are the total between 2023 and 2025. Quadrennial samples completed are the total between 2023 and 2026.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.

Baseline Inspection Completion with Certification Information By Site IR Report 8 Page 2 of 2 2/3/2025 9:04:31 AM C: Complete C1: Complete - by reference iaw IMC 0306 C2: Complete - minimum sample not available iaw IMC 0306 C3: Complete - opportunity to apply full procedure not available iaw IMC 0306 C4: Complete - in previous year(s)

C6: Complete - completed IPs 71111.21M and/or 71111.21N C7: Complete - completed IP 71111.21 IC: Incomplete NA: Not Applicable - completion not required during this inspection cycle NOTE: Biennial samples completed are the total of 2024 and 2025. Triennial samples completed are the total between 2023 and 2025. Quadrennial samples completed are the total between 2023 and 2026.

  • Procedure was marked complete, however not all sub procedures may have been completed. See IMC 0306 for appropriate comments.