MEMORANDUM TO:

Russell Felts, Director Division of Reactor Oversight Office of Nuclear Reactor Regulation FROM:

Tara Inverso, Director Division of Security Operations Office of Nuclear Security and Incident Response

SUBJECT:

CALENDAR YEAR 2024 BASELINE INSPECTION COMPLETION This memorandum communicates that, consistent with a triennial frequency, the requisite baseline inspections were completed in calendar year (CY) 2024 under inspection procedure (IP) 71130.03, Contingency Response - Force-on-Force (FOF) Testing (Agencywide Documents Access and Management System Accession Number ML21012A329).

Eighteen sites were inspected under IP 71130.03 in 2024: Brunswick Steam Electric Plant, Callaway Plant, Columbia Generating Station, Donald C. Cook Nuclear Plant, Grand Gulf Nuclear Station, LaSalle County Station, Limerick Generating Station, Monticello Nuclear Generating Plant, North Anna Power Station, Point Beach Nuclear Plant, Quad Cities Nuclear Power Station, Shearon Harris Nuclear Power Plant, South Texas Project, Surry Power Station, Susquehanna Steam Electric Station, Turkey Point Nuclear Generating Station, Waterford Steam Electric Station, and Wolf Creek Generating Station,.

Re-visit actions for ineffective exercise outcomes in accordance with Inspection Manual Chapter 0609, Appendix E, Part II, Force-on-Force Significance Determination Process, were completed at Vogtle Electric Generating Plant and Watts Bar Nuclear Plant due ineffective FOF exercise outcomes in CY 2022. reflects the completion status for each site as reported in the Reactor Programs System, Inspection Report 8. IP 71130.03 is considered complete with one sample.

Additionally, BWXT Nuclear Operations Group - Lynchburg, was inspected under IP 96001, NRC FOF Inspections at Category 1 Fuel Cycle Facilities (ADAMS Accession Number ML19043A930). reflects the completion status of this inspection as reported in the Reactor Programs System. IP 96001 is considered complete with two samples.

CONTACT: Joshua Berry, NSIR/DSO/SPEB 301287-3647

Enclosures:

1.

2024 IP 71130.03 IR Report 8 2.

2024 IP 96001 IR Report 8 February 4, 2025 Yip, Brian signing on behalf of Inverso, Tara on 02/04/25

ML25035A098; Memo ML25035A094 OFFICE NSIR/DSO/SPEB

/ETB NSIR/DSO/SPEB

/ETA NSIR/DSO NAME JBerry JClark TInverso BYip for DATE Feb 4, 2025 Feb 4, 2025 Feb 4, 2025