March 3, 2003
SUBJECT:
ANNUAL ASSESSMENT LETTER - MILLSTONE UNIT 2 AND UNIT 3 (REPORT NOS. 50-336/03-001 AND 50-423/03-001)
Dear Mr. Price:
On February 6, 2003, the NRC staff completed its end-of-cycle plant performance assessment of Millstone Unit 2 and Unit 3. The end-of-cycle reviews for Millstone Unit 2 and Unit 3 involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, Millstone Unit 2 and Unit 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance at both units was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2004.
The enclosed inspection plan details the inspections scheduled through March 31, 2004. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The last six months of the inspection plan is tentative and may be revised at the Mid-Cycle Review meeting.
Mr. J. Alan Price
As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several orders and threat advisories to enhance security capabilities and improve guard force readiness.
We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections, conduct portions of the security baseline inspection program, as well as perform additional inspections to evaluate your compliance with new requirements that may be ordered. Based on our final determinations in this regard, we will notify you of any inspection plan changes.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Brian J. McDermott, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.:
50-336, 50-423 Licensee Nos.: DPR-65, NPF-49 Enclosure:
Millstone Unit 2 Inspection/Activity Plan Millstone Unit 3 Inspection/Activity Plan
Mr. J. Alan Price
cc w/encl:
D. A. Christian, Senior Vice President - Nuclear Operations and Chief Nuclear Officer W. R. Matthews, Senior Vice President - Nuclear Operations S. E. Scace, Assistant to the Site Vice President G. D. Hicks, Director, Nuclear Station Safety and Licensing A. J. Jordan, Jr., Director - Nuclear Engineering S. P. Sarver, Director, Nuclear Station Operations and Maintenance D. A. Smith, Manager, Licensing P. J. Parulis, Manager, Nuclear Oversight L. M. Cuoco, Senior Counsel V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)
J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company C. Brinkman, Manager, Washington Nuclear Operations
Mr. J. Alan Price
Distribution w/encl: Via E-Mail H. Miller, ORA J. Wiggins, ORA T. Madden, OCA T. McGinty, OEDO J. Clifford, NRR R. Ennis, PM, NRR G. Wunder, Backup PM, NRR V. Nerses, PM, NRR S. M. Schneider, SRI - Millstone Unit 2 A. Cerne, SRI - Millstone Unit 3 Director, DRS Region I Deputy Director, DRS, Region I DRS Branch Chiefs (5)
R. Fuhrmeister, DRS T. Moslak, DRS G. Smith, DRS N. McNamara, DRS B. McDermott, RI K. Jenison, RI D. Screnci, PAO B. Platchek, DRP Region I Docket Room (with concurrences)
RidsNrrDipmIipb DOCUMENT NAME: G:\\BRANCH6\\Millstone\\Millstone 2003 EOC Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP
NAME KJenison/KMJ BMcDermott/BJM DATE 02/28/03 03/03/03 OFFICIAL RECORD COPY
Millstone 2 Inspection / Activity Plan 12/29/2002 - 03/27/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 02/25/2003 10:48:36 Report 22
- OCC RAD SAFETY - ACCESS Baseline Inspections 02/10/2003 02/14/2003 Access Control to Radiologically Significant Areas IP 7112101
1 71151
- EP PI VERIFICATION Baseline Inspections 02/24/2003 02/28/2003 Performance Indicator Verification IP 71151
6 TI148BC
- SEC ICM Safety Issues 02/24/2003 02/28/2003 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148
8 7111117B
- PERMANENT PLANT MODS Baseline Inspections 07/14/2003 07/19/2003 Evaluation of Changes, Tests, or Experiments IP 7111102
Baseline Inspections 07/14/2003 07/19/2003 Permanent Plant Modifications IP 7111117B
1 7112201
- PUB RAD SAFETY - RETS (UNIT 2 ONLY)
Baseline Inspections 07/21/2003 07/25/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201
1 71121.02
- OCC RAD SAFETY - ALARA Baseline Inspections 08/04/2003 08/08/2003 ALARA Planning and Controls IP 7112102
2 9/22 EXM
- U2 OPERATOR LICENSING INITIAL EXAMS Not Applicable 08/25/2003 08/29/2003 MILSTONE UNIT 2 INITIAL EXAM (9/22/03)
U01505
Not Applicable 09/22/2003 09/26/2003 MILSTONE UNIT 2 INITIAL EXAM (9/22/03)
U01505
1 71114
- EP PROGRAM INSP Baseline Inspections 09/21/2003 09/25/2003 Alert and Notification System Testing IP 7111402
Baseline Inspections 09/21/2003 09/25/2003 Emergency Response Organization Augmentation Testing IP 7111403
Baseline Inspections 09/21/2003 09/25/2003 Emergency Action Level and Emergency Plan Changes IP 7111404
Baseline Inspections 09/21/2003 09/25/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405
2 7111108
- INSERVICE INSPECTION - UNIT 2 Safety Issues 10/06/2003 10/10/2003 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02)
Baseline Inspections 10/06/2003 10/10/2003 Inservice Inspection Activities - PWR IP 7111108P
1 71121.02
- OCC RAD SAFETY - ALARA Baseline Inspections 10/06/2003 10/10/2003 ALARA Planning and Controls IP 7112102
1 7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 01/26/2004 01/30/2004 Access Control to Radiologically Significant Areas IP 7112101
7 71152B
- PROBLEM IDENTIFICAITON AND RESOLUTION Baseline Inspections 02/09/2004 02/13/2004 Identification and Resolution of Problems IP 71152B
Baseline Inspections 02/23/2004 02/27/2004 Identification and Resolution of Problems IP 71152B
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Millstone 3 Inspection / Activity Plan 12/29/2002 - 03/27/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 02/25/2003 10:48:54 Report 22
- OCC RAD SAFETY - ACCESS Baseline Inspections 02/10/2003 02/14/2003 Access Control to Radiologically Significant Areas IP 7112101
1 71151
- EP PI VERIFICATION Baseline Inspections 02/24/2003 02/28/2003 Performance Indicator Verification IP 71151
6 TI148BC
- SEC ICM Safety Issues 02/24/2003 02/28/2003 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148
1 7111107B
- HEAT SINK - U3 Baseline Inspections 04/07/2003 04/11/2003 Heat Sink Performance IP 7111107B
8 7111117B
- PERMANENT PLANT MODS Baseline Inspections 07/14/2003 07/19/2003 Evaluation of Changes, Tests, or Experiments IP 7111102
Baseline Inspections 07/14/2003 07/19/2003 Permanent Plant Modifications IP 7111117B
6 7111121
- SSDI - U3 Baseline Inspections 07/28/2003 08/01/2003 Safety System Design and Performance Capability IP 7111121
Baseline Inspections 08/11/2003 08/15/2003 Safety System Design and Performance Capability IP 7111121
1 71121.02
- OCC RAD SAFETY - ALARA Baseline Inspections 08/04/2003 08/08/2003 ALARA Planning and Controls IP 7112102
1 71122.01
- RETS - UNIT 3 Baseline Inspections 09/15/2003 09/19/2003 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201
1 71114
- EP PROGRAM INSP Baseline Inspections 09/21/2003 09/25/2003 Alert and Notification System Testing IP 7111402
Baseline Inspections 09/21/2003 09/25/2003 Emergency Response Organization Augmentation Testing IP 7111403
Baseline Inspections 09/21/2003 09/25/2003 Emergency Action Level and Emergency Plan Changes IP 7111404
Baseline Inspections 09/21/2003 09/25/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405
1 7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 01/26/2004 01/30/2004 Access Control to Radiologically Significant Areas IP 7112101
7 71152B
- PROBLEM IDENTIFICAITON AND RESOLUTION Baseline Inspections 02/09/2004 02/13/2004 Identification and Resolution of Problems IP 71152B
Baseline Inspections 02/23/2004 02/27/2004 Identification and Resolution of Problems IP 71152B
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.