ML042430608

From kanterella
Revision as of 01:37, 16 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection/Activity Plan for Robinson 09/01/2004 - 03/31/2006/
ML042430608
Person / Time
Site: Robinson, 07200003  
Issue date: 08/30/2004
From:
NRC/RGN-II
To:
Shared Package
ML042430597 List:
References
-RFPFR
Download: ML042430608 (2)


Text

Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2004 14:10:38 Report 22 4

EB1-TFP

- FIRE PROTECTION-TRIENNIAL Baseline Inspections 08/30/2004 09/03/2004 Fire Protection IP 7111105T 2

3 OL EXAM

- INITIAL EXAM Not Applicable 08/30/2004 09/03/2004 ROBINSON/EXAMS AT POWER FACILITIES V23218 2

3 EB2ISFSI

- ISFSI CONSTRUCTION / OPERATION Other Routine 10/04/2004 10/08/2004 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 2

Other Routine 10/04/2004 10/08/2004 Operation Of An ISFSI IP 60855 2

3 PB4-PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 10/04/2004 10/08/2004 Identification and Resolution of Problems IP 71152B 2

3 PB4-PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 10/18/2004 10/22/2004 Identification and Resolution of Problems IP 71152B 2

4 EB2TI159

- REVIEW OF GENERIC LETTER 89-13 Safety Issues 10/24/2004 10/28/2004 Review of Generic Letter 89-13: Service Water System Problems Affecting Safety-Related E IP 2515/159 2

1 OL EP

- EP INSPECTION Baseline Inspections 12/13/2004 12/17/2004 Alert and Notification System Testing IP 7111402 2

Baseline Inspections 12/13/2004 12/17/2004 Emergency Response Organization Augmentation Testing IP 7111403 2

Baseline Inspections 12/13/2004 12/17/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 2

Baseline Inspections 12/13/2004 12/17/2004 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 2

Baseline Inspections 12/13/2004 12/17/2004 Performance Indicator Verification IP 71151 2

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 01/17/2005 01/21/2005 Safety System Design and Performance Capability IP 7111121 2

3 PS-RP

- RP PUBLIC AND ISFSI Other Routine 01/31/2005 02/04/2005 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP 60855.1 2

Baseline Inspections 01/31/2005 02/04/2005 Radiation Monitoring Instrumentation and Protective Equipment IP 7112103 2

Baseline Inspections 01/31/2005 02/04/2005 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 2

Baseline Inspections 01/31/2005 02/04/2005 Radiological Environmental Monitoring Program IP 7112203 2

Baseline Inspections 01/31/2005 02/04/2005 Performance Indicator Verification IP 71151 2

2 OL RQ

- REQUAL INSPECTION Baseline Inspections 02/14/2005 02/18/2005 Licensed Operator Requalification Program IP 7111111B 2

5 EB1SSDPC - SSDPC Baseline Inspections 02/14/2005 02/19/2005 Safety System Design and Performance Capability IP 7111121 2

Baseline Inspections 02/28/2005 03/04/2005 Safety System Design and Performance Capability IP 7111121 2

1 60854

- ISFSI DRY RUN INSPECTION Other Routine 06/20/2005 06/24/2005 Preoperational Testing Of An ISFSI IP 60854 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

ENCLOSURE

Robinson Inspection / Activity Plan 09/01/2004 - 03/31/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2004 14:10:38 Report 22 2

EB2 HEAD

- REACTOR HEAD REPLACEMENT Other Routine 08/15/2005 08/19/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

Other Routine 09/05/2005 09/07/2005 Reactor Vessel Head Replacement Inspection IP 71007 2

1 EB2-ISI

- ISI Baseline Inspections 09/06/2005 09/09/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 PS - RP

- RP OCCUPATIONAL Baseline Inspections 09/12/2005 09/16/2005 Access Control to Radiologically Significant Areas IP 7112101 2

Baseline Inspections 09/12/2005 09/16/2005 ALARA Planning and Controls IP 7112102 2

1 EB2SGISI

- STEAM GENERATOR ISI Baseline Inspections 09/19/2005 09/23/2005 Inservice Inspection Activities - PWR IP 7111108P 2

1 EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/30/2006 02/03/2006 Evaluation of Changes, Tests, or Experiments IP 7111102 2

Baseline Inspections 01/30/2006 02/03/2006 Permanent Plant Modifications IP 7111117B 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.