Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920308
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/23/2004
From: Longston A
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920308 (3)


Text

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

. April 23,2004 Time:

1700 Preparer.

Andrea LUnsglon U

I R

28 NOTE:.

Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinitions.

NOTE:

Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY Subtotal Condition

1.

RCS Boron concentration = 2979 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C (0-1) 1 0-1 RED

2.

Number of boration paths (0-2) 2 2

ORANGE

3.

No fuel motion (0-1) 1 3-4

4.

SR instrumentation operable (0-1) 1 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 1 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 92FF; 20 days shutdown, Subtotal 4

RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19 firs (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-O5 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level Ž20 percent wlhead on 0-1 RED (0-1) 0 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 2 3

_ y ell

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

C

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 1 Iifnrwstlon In this record was deleted.

Subtotal =

4 PBF-1 562 Revision 2 10/30Y02 in accordance with lte Freedom of Information

Act, Pg1tions o

O -t Page I of 9 Reremnces: NP 103.6 NP 102.1 s-\\0 U

  • I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out

' OR at least one SG available one fan cooler with Equip hatch installed and personnel hatches capable of being shut I 9

( or 4) 0

( or 2) 2 (0.1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE

-.I.T.TOW-(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent

1.

'A' SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below

2.

'B' SFP cooling pump available with power available from:

G-3 or G-04 via IB-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

offsitepower source duringperiods of single X-03 orX-04availabiity (*).

Subtotal Condition 0-1 RED 2

ORANGE (0-1)

Wta 3

YELLOW 4-5 GREEN 10-1) n/a (0-1) n/a

( 0-1)

Wa SFP Temperatures:

NW nWa OF SE n/a OF SFP Average Temp nla SFP Time to Boil n/a Subtotal =

n/a OF

.I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.

RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.

PBF-1562 Revision 2 10/30/02

References:

NP 103.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 23, 2004 TIME:

1700 KEY SAFETY FUNCTIONS:

REACTIVITY:

GREEN CORE COOLING:

GREEN POWER AVAILABLE:

GREEN INVENTORY:

GREEN CONTAINMENT:

GREEN SFP COOLING:

NA PROTECTED EOUIPMENT:

COMMENTS:

Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Is taken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562

References:

NP 103.6 Revision 2 10/302 Page 5 of 9 NP 10+/-1