Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
. April 23,2004 Time:
1700 Preparer.
Andrea LUnsglon U
I R
28 NOTE:.
Refer to base procedure NP 10.3.6for safety assessment checklist KSFdefinitions.
NOTE:
Wheneverfuel has been removedfrom the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY Subtotal Condition
- 1.
RCS Boron concentration = 2979 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C (0-1) 1 0-1 RED
- 2.
Number of boration paths (0-2) 2 2
ORANGE
- 3.
No fuel motion (0-1) 1 3-4
- 4.
SR instrumentation operable (0-1) 1 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 1 2
ORANGE
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 92FF; 20 days shutdown, Subtotal 4
RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19 firs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-O5 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level Ž20 percent wlhead on 0-1 RED (0-1) 0 2
ORANGE
- 2.
Refueling Cavity filled (see definition)
(0-3) 2 3
_ y ell
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
C
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 1 Iifnrwstlon In this record was deleted.
Subtotal =
4 PBF-1 562 Revision 2 10/30Y02 in accordance with lte Freedom of Information
- Act, Pg1tions o
O -t Page I of 9 Reremnces: NP 103.6 NP 102.1 s-\\0 U
- I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out
' OR at least one SG available one fan cooler with Equip hatch installed and personnel hatches capable of being shut I 9
( or 4) 0
( or 2) 2 (0.1) 1 Subtotal 0
l 2-3 4-5-6 Condition RED ORANGE
-.I.T.TOW-(0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent
- 1.
'A' SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below
- 2.
'B' SFP cooling pump available with power available from:
G-3 or G-04 via IB-42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
offsitepower source duringperiods of single X-03 orX-04availabiity (*).
Subtotal Condition 0-1 RED 2
ORANGE (0-1)
Wta 3
YELLOW 4-5 GREEN 10-1) n/a (0-1) n/a
( 0-1)
Wa SFP Temperatures:
NW nWa OF SE n/a OF SFP Average Temp nla SFP Time to Boil n/a Subtotal =
n/a OF
.I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.
RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.
PBF-1562 Revision 2 10/30/02
References:
NP 103.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
I DATE:
April 23, 2004 TIME:
1700 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
GREEN POWER AVAILABLE:
GREEN INVENTORY:
GREEN CONTAINMENT:
GREEN SFP COOLING:
NA PROTECTED EOUIPMENT:
COMMENTS:
Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Is taken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562
References:
NP 103.6 Revision 2 10/302 Page 5 of 9 NP 10+/-1