Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: . April 23,2004 Time: 1700 Preparer. Andrea LUnsglon U I R 28 NOTE:. Refer to base procedureNP 10.3.6for safety assessmentchecklist KSFdefinitions.
NOTE: Wheneverfuel has been removedfrom the reactorvessel and refueling cavity, all key safety functions are GREEN except spentfuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True =1 through 4 REACTIVITY Subtotal Condition
- 1. RCS Boron concentration = 2979 ppm a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCSboron>boronconcentrationrequiredbyOP3C (0-1) 1 0-1 RED
- 2. Number of boration paths (0-2) 2 2 ORANGE
- 3. No fuel motion (0-1) 1 3-4
- 4. SR instrumentation operable (0-1) 1 5 Subtotal = 5 CORE COOLING Subtotal Condition
- 2. Refueling cavity filled (0-1) 1 2 ORANGE
- 3. Number of trains RHR available (0-2) 2 3
- 4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 92FF; 20 days shutdown, Subtotal 4 RCS Level = Upper Vessel Internal Lift Height RCS Time to Boil 19 firs (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1. Independent off-site power sources I RED available to A-O5 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV, 3 and 345 kV levels) (0-2) 2 4-5
- 2. G-01 or G-021A-051B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3. G-05 available, Reactor Cavity filled to 223 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition
- 1. Pressurizer level Ž20 percent wlhead on 0-1 RED (0-1) 0 2 ORANGE
- 2. Refueling Cavity filled (see definition) (0-3) 2 3 _ y ell
- 3. RCS level above REDUCED INVENTORY (0-1) 1 4 C
- 4. Makeup from VCTIBLENDER and/or RWST available (0-2) 1 Iifnrwstlon In this record was deleted. Subtotal = 4 inaccordance with lte Freedom of Information PBF-1 562 Act, Pg1tions o Reremnces: NP 103.6 Revision 2 10/30Y02 O -t Page I of 9 NP 102.1 s-\0U
- I Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST I 9 CONTAINMENT Subtotal Condition
- 1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) (ITS TS 3.6.1) set ( or 4) 0 l ORANGE
- 2. Containment Closure CL-IE maintained 2-3 -.I.T.TOW-and closure < time to boil ( or 2) 2 4-5-6
- 3. No fuel motion (0.1) 1
- 4. DHR Capability:
- cavity flooded and internals out
' OR
- at least one SG available
- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE: Take creditforonly one P-12 independent offsitepower source duringperiodsof single X-03 orX-04availabiity(*).
Subtotal Condition
- 1. 'A' SFP cooling pump available 0-1 RED with power available from: 2 ORANGE
- G-02 or G-01 via 2B-32 (0-1) Wta 3 YELLOW an independent off-site power 4-5 GREEN source different than that for Train B below 10-1) n/a
- 2. 'B' SFP cooling pump available with power available from:
- G-3 or G-04 via IB-42 (0-1) n/a
.(*) an independent off-site power source different than that for Train A above
- 3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ( 0-1) Wa SFP Temperatures: Subtotal = n/a NW nWa OF SE n/a OF SFP Average Temp nla OF SFP Time to Boil n/a
.I GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
The upper internals lift is complete. Reactivity and Containment are GREEN. Sump B is being credited for INVENTORY with one makeup path available. INVENTORY flow path is through the RMW/BAST's through the P-2C and AUX. CHG. lines.
RWST level is <16% so the REACTIVITY paths are through the BAST's and the P-2C pump and AUX. CHG. Lines and the BAST's and the P-15A pump.
PBF-1562
References:
NP 103.6 Revision 2 10/30/02 Page 2 of 9 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: I DATE: April 23, 2004 TIME: 1700 KEY SAFETY FUNCTIONS:
REACTIVITY: GREEN CORE COOLING: GREEN POWER AVAILABLE: GREEN INVENTORY: GREEN CONTAINMENT: GREEN SFP COOLING: NA PROTECTED EOUIPMENT:
COMMENTS:
Unit 1 is in Mode 6 Fire Protection Condition IV: Credit Istaken for fire rounds as fire prevention contingency RCS Time to Boll Is 19 hours2.199074e-4 days <br />0.00528 hours <br />3.141534e-5 weeks <br />7.2295e-6 months <br /> RCS Cavity Level is at Upper Vessel Internal Lift Height Hot Leg Vent Path Is the Pressurizer manway PBrF1562
References:
NP 103.6 Revision 2 10/302 Page 5 of 9 NP 10+/-1