Supplement to Amendment Request NPF-38-267 Reactor Coolant System Leakage Detection Instrumentation
ML062120588
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/28/2006
From: Ridgel J
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NPF-38-267, W3F1-2006-0041
Download: ML062120588 (5)


Text

--Entergy Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6485 jridgel@entergy.com Jerry A. Ridgel Acting Nuclear Safety Assurance Director Waterford 3 W3F1-2006-0041 July 28, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Wa*hihdtbn", DC 20555

SUBJECT:

Supplement to Amendment Request NPF-38-267 Reactor Coolant System Leakage Detection Instrumentation Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

REFERENCES:

1.

Entergy Letter to the NRC dated February 15, 2006, "License Amendment Request NPF-38-267 Reactor Coolant System Leakage Detection Instrumentation" (W3F1-2006-0005)

Dear Sir or Madam:

By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Waterford Steam Electric Station, Unit 3 (Waterford 3) Technical Specifications (TSs) to credit the measurement tank weir flow instrumentation for the containment fan cooler condensate flow monitoring system in place of the one containment fan cooler condensate flow switch currently required by TS 3.4.5.1, "Reactor Coolant System Leakage - Leakage Detection Instrumentation."

On May 30, 2006, the NRC requested additional information. As a result, two questions were determined to need formal response. Entergy prepared a draft response and based on discussions with the NRC has determined that the existing submittal will be superseded with a new submittal. The new submittal will be provided within 60 days.

D O0

WSF1-2006-0041 Page 2 This letter contains one new commitment. If you have any questions or require additional information, please contact Dana Millar at 601-368-5445.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on July 28, 2006.

Sincerely, Attachment - List of Regulatory Commitments

W3F1-2006-0041 Page 3 cc:

Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector Waterford 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Mel B. Fields MS O-7D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway Attn: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn Attn: N.S. Reynolds 1700 K Street, NW Washington, DC 20006-3817 Louisiana Department of Environmental Quality Office of Environmental Compliance Surveillance Division P. O. Box 4312 Baton Rouge, LA 70821-4312 American Nuclear Insurers Attn: Library 95 Glastonbury Blvd.

Suite 300 Glastonbury, CT 06033-4443

Attachment To W3F17-2006-0041 List of Regulatory Commitments

Attachment to W3F1 -2006-0041 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check one)

SCHEDULED ONE-CONT COMPLETION DATE (If COMMITMENT TIME COMPL Required)

ACTION Provide new submittal to the NRC for the X

September 26, 2006 RCS Leakage Detection Instrumentation License Amendment Request.