ML14296A555

From kanterella
Revision as of 07:36, 30 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

Task Order No. NRC-HQ-20-14-T-0001 Under Delivery Order No. NRC-HQ-25-14-E-0005
ML14296A555
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/21/2014
From: Mary Thompson
Acquisition Management Division
To:
Energy Research
References
NRC-HQ-25-14-E-0005, TAC MF4485
Download: ML14296A555 (12)


Text

ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGESIMPORTANT: Mark all packages and papers with contract and/or order numbers. 1 121. DATE OF ORDER 2 CONTRACT NO. (If any) 6. SHIP TO:NRC-HQ-25- 14-E-000509/19/2014 NRC-HQ-1-51a. NAME OF CONSIGNEE3. ORDER NO. 4. REQUISITION/REFERENCE NO.NRC-HQ-20-14-T-0001 See Schedule US NUCLEAR REGULATORY COMMISSION-5. ISSUING OFFICE (Address correspondence to) b. STREETADDRESSUS NRC -HQ MAIL PROCESSING CENTERACQUISITION MANAGEMENT DIVISION 4930 BOILING BROOK PARKWAYMAIL STOP 3WFN-05-C64MP.WASHINGTON DC 20555-0001c CITY d. STATE e. ZIP CODEROCKVILLE MD 208527. TO: f. SHIP VIAa. NAME OF CONTRACTORENERGY RESEARCH INC 8. TYPE OF ORDERb. COMPANY NAME is. PURCHASE b. DELIVERYc. STREET ADDRESS REFERENCE YOUR:6189 EXECUTIVE BLVD Except for billing instructions on thereverse, this delivery order is subjectto instructions contained on this sideonly of this form and is issuedPlease furnish the following on the terms subject to the terms and conditionsand conditions specified on both sides of of the above-numbered contract.d. CITY e. STATE f. ZIP CODE this order and on the attached sheet, it any,ROCKVI LLE MD 208523901 including delivery as indicated.g. ACCOUNTING AND APPROPRIATION DATA 10. REQUISITIONING OFFICESee Schedule OFF OF NUCLEAR REACTOR REGULATION11. BUSINESS CLASSIFICATION (Check appropriate box(es)) 12. F.O.B. POINT1.... a. SMALL b. OTHER THAN SMALL .c. DISADVANTAGED d WOMEN-OWNED I. e. HUBZone[i f. SERVICE-DISABLED g. WOMEN-OWNED SMALL BUSINESS (WOSB) i h EDWOSBVETERAN-OWNED ELIGIBLE UNDER THE WOSB PROGRAM ..13. PLACE OF 14. GOVERNMENT B/L NO. .. 1. DELIVER TO F.O.B. POINT 16. DISCOUNTTERMSON OR BEFORE (Date)a. INSPECTION b. ACCEPTANCE 03/20/2015Destination Destination17. SCHEDULE (See reverse for Rejections)QUANTITY UNIT QUANTITYITEM NO. SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED(a) (b) (c) (d) (e) (f) (g)Task Order No. 2 titled TechnicalAssistance in Support of Cooper NuclearStations (CNS) License Amendment Request toMove Linear Heat Generation Rate (LHGR)Limit from Technical Requirements Manual(TRM) to Technical Specifications (TS), inContinued ...18. SHIPPING POINT 19. GROSS SHIPPING WEIGHT 20. INVOICE NO. 17(h)TOTAL(Cont.pages)21. MAIL INVOICE TO.a. NAME $0.00 0US NUCLEAR REGULATORY COMMISSIONSEE BILLINGINSTRUCTIONS b. STREET ADDRESS ONE WHITE FLINT NORTHONREVERSE (orPOBox) 11555 ROCKVILLE PIKE 17(i)GRANDMAILSTOP 03-E17A TOTALc. CITY d. STATE e. ZIPCODE9214.48 4ROCKVILLE MD 20852-273822. UNITED STATES OF 09 / 19/2014 23. NAME (Typed)AMERICA BY (Signature) h MARK THOMPSON--- .TITLE: CONTRACTING/ORDERING OFFICERAUTHORIZED FOR LOCAL REPRODUCTIONPREVIOUS EDITION NOT USABLE'rEtAPIAT- ADMO0OOPTIONAL FORM 347 (Rev. Presribed by GSMFAR 48 CFR 53.213(9SUNS1 REVIEW COMPLErMOCT 2 12014 0 0 ORDER FOR SUPPLIES OR SERVICES PAGE NOSCHEDULE -CONTINUATIONIMPORTANT: Mark all packages end papers with contract andlor order numbers.DATE OF ORDER CONTRACT NO. ORDER NO.09/19/2014 NRC-HQ-25-14-E-0005 NRC-HQ-20-14-T-0001ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT AMOUNT QUANTITYORDERED PRICE ACCEPTED(a) (b) (c) (d) (a) If1 (g)Support of NRC Environmental and ReactorPrograms under Enterprise Wide Contract No.NRC-HQ-25-14-E-0005.This Task Order is fully-funded at$39,214.48.Contracting Officers Representative: ShaunAnderson, email: Shaun.Anderson@nrc.gov,phone: 301-415-2039Contractor POCs:Business: Tracey Mullinix, ContractAdministrator. Email: tlm@eri-world.com.Phone: (301) 881-0866.Technical: Dr. Mohsen Khatib-Rahbar,President. Email: mkrl@eri-world.com.Phone: (301) 881-0866.4-.______________ 9/19/14ERI Authorized Official DateAccounting Info:2014-X0200-FEEBASED-20-20D008-11-4-149-1128-251APeriod of Performance: 09/22/2014 toCY3/20/2015/17TOTAL CARRIED FORWARD TO 1ST PAGE (ITEM 17(H)) [- $0.00AUTHORIZED FOR LOCAL REPODUCTION OPTIONAL FORM 348 (Rev. 4/2006PREVIOUS EDITION NOT USABLEPre-ý by GSA FAR 148 CFR) 53 213(f)

TASK ORDER 02SECTION B -SUPPLIES OR SERVICES AND PRICE/COSTSB.1 PRICEICOST SCHEDULECLIN DESCRIPTION OF ESTIMATED FIXED FEE TOTALSUPPLIES/SERVICES COST COST PLUSFIXED FEE0001 Contractor to provide TechnicalAssistance in accordance with sectionC: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORKTotal S39.214.49NRCB044 CONSIDERATION AND OBLIGATION-INDEFINITE-QUANTITY CONTRACT(a) The estimated total quantity oract for the productsiservices under this contract is$39,214.49 of which the sum of represents the estimated reimbursable costs, and ofwhich fixe Tee.(b) The Contracting Officer will obligate funds on each task order issued.(c) The amount currently obligat he Government with respect to this contract is$39.214.49, of which the sum of represents the estimated reimbursable costs, andof which represents the ee.(d) This is an incrementally-funded contract and FAR 52.232-22 -"Limitation of Funds" applies.(e) The Contractor shall comply with the provisions of FAR 52.232-20 -Limitation of Cost forfully-funded task orders and FAR 52.232-22 -Limitation of Funds for incrementally-funded taskorders, issued hereunder.(End of Clause)-1 SECTION C -DESCRIPTIONISPECIFICATIONSISTATEMENT OF WORKFOR TASK ORDER 02 -"Technical Assistance in Support of Cooper's LicenseAmendment Request to Move Linear Heat Generation Rate (LHGR) Limit from TechnicalRequirements Manual (TRM) to Technical Specifications (TS) (ML14203A045)"CC Contractor Task Order No.1128 Energy Research, Inc. NRC-HQ-25-14-E-0005 TO #02Applicant Site Docket No.Nebraska Public Power District Cooper Nuclear Station 05000298Title/DescriptionTechnical.Assistance.in Support of Cooper Nuclear Station's .(CNS) License.Amendment Request toMove Linear Heat Generation Rate (LHGR) Limit from Technical Requirements Manual (TRM) toTechnical Specifications (TS) (ML14203A045) -Task Order 2TAC No. B&R Number SRP or ESRP Section(s)MF4485 11-4-149 N/ANRC Contracting Officer Representative (Administrative)See Section H, Clause2052.21571 PROJECTOFFICER AUTHORITYNRC Contracting Officer Representative (Technical)See Section H, Clause2052.21571 PROJECTOFFICER AUTHORITY1.0 PROJECT DESCRIPTIONThis project is titled, "Technical Assistance in Support of Cooper's License Amendment Requestto Move Linear Heat Generation Rate (LHGR) Limit from Technical Requirements Manual(TRM) to Technical Specifications (TS) (ML14203A045)." The objective of this task order is toobtain technical expertise to assist the U.S. Nuclear Regulatory Commission (NRC) staff indetermining the technical adequacy of the license amendment request (LAR) submitted byNebraska Public Power District) to revise Cooper's Move Linear Heat Generation Rate (LHGR)Limit from TRM to TS. This project falls under Section C.3.2, "Licensing Support," of the basecontract.2.0 BACKGROUND10 CFR 50.36(c)(2)(ii)(B) Criterion 2 requires the inclusion in TS any process variable, designfeature, or operating restriction that is an initial condition of a design basis accident or transientanalysis that either assumes the failure of or presents a challenge to the integrity of a fissionproduct barrier. Prior to CNS cycle 23 the Average Planar Linear Heat Generation Rate(APLHGR) thermal limit in TS 3.2.1 was a composite limit of the Emergency Core CoolingSystem (ECCS) Loss of Coolant Accident (LOCA) limits and the thermal mechanical LHGRlimits used to protect the primary fission product barrier (cladding). This allowed the APLHGRTS to meet the requirements for monitoring the ECCS LOCA limits as well as the thermalmechanical limits of the cladding.2 Since the implementation of PANAC1 1 in cycle 23, the application of the APLHGR limits arebased solely on the ECCS criteria. Thermal mechanical limits are monitored independently withLHGR. Since the limits are now separate, both limits must reside in the TS and have a uniqueCondition for Operation (LCO) for each. LHGR is presently monitored and controlled per theTRM. This change is needed to allow the TS to comply with the Code of Federal Regulationswhich will be satisfied by the addition of TS 3.2.3, LHGR.This amendment is required to revise the CNS Operating License to add the definition forLHGR, add the LCO, Actions and Surveillance Requirements for LHGR, revise the RecirculationLoops Operating LCO, revise the Main Turbine Bypass System LCO and revise therequirements for the Core Operating Limits Report (COLR).3.0 OBJECTIVEThe contractor must provide all resources necessary to accomplish the tasks and deliverablesdescribed in this statement of work (SOW).The contractor must perform a review and evaluation of the technical and regulatory basis forthe LAR. The contractor must provide technical evaluation report (TER) that will be used asinput for the NRC staff's safety evaluation report (SER) that documents the NRC's technical,legal, and safety basis for approving the license amendment.4.0 SPECIFIC TASKSThe contractor must perform the following tasks:Task I Kickoff MeetingI. a *Preparation for-Kickoff MeetingBecome familiar with the LAR submittal by CNS.1. b Attend Kickoff MeetingAttend a one-time kick-off meeting (either in person or via conference call) to discuss the scopeof work, expectations, task order management, and performance requirements of the task order.The kick-off meeting shall be held within ten (10) working days after contractor receipt of LARmaterials.Task 2 Review LAR Submission2. a Evaluate the LAR SubmittalUsing the criteria and guidelines found in Standard Review Plan (SRP), review the LARsubmitted by CNS to determine the technical accuracy and regulatory compliance of therequest.2. b Prepare Draft Technical Evaluation Report3 Prepare a draft Technical Evaluation Report (TER) that incorporates the results of the reviewand evaluation. The TER must be organized to parallel the applicable sections in NRC's SRP,Chapters 9. The TER may include other relevant information that is not included in the SRP.Only input to SER sections requiring revision must be included in the TER. The TER mustcontain draft text, tables, and illustrations, as appropriate, suitable for inclusion in NRC's SER.The TER must provide sufficient information to adequately support the NRC staffs rationale forwhy there is reasonable assurance that public health and safety is protected. It must be writtenso that a person with either non-nuclear technical background or non-technical background canunderstand the basis for conclusions cited.Prepare final draft TER that incorporates comments provided by the Contracting Officer'sRepresentative (COR).As directed by the COR, participate in conference calls with CNS to discuss the LAR materials.2. c Prepare Requests for Additional InformationIdentify unresolved issues and any additional or clarifying information needed in the LARsubmission. Prepare draft Request for Additional Information (RAIs) for use by NRC inrequesting more information from CNS to clarify issues raised during review of the LAR.Prepare final RAIs that incorporate comments provided by the COR.As directed by the COR, participate in conference calls with CNS to discuss additionalinformation to be provided or clarified with the LAR.2. d Review RAI Responses and Update TERReview CNS's responses to the RAIs to determine whether they adequately resolve theoutstanding issues.Update the draft TER prepared under Task 2.b to incorporate CNS's RAI responses and reviserelated portions of the draft text, tables, and illustrations in the TER. Prepare a final updatedTER that incorporates comments provided by the COR.As directed by the COR, participate in conference calls with CNS to discuss the responses ofthe RAIs.5.0 APPLICABLE DOCUMENTS AND STANDARDSNUREG-0800 SRP4 6.0 DELIVERABLES AND DELIVERY SCHEDULEIREPORTING REQUIREMENTSThe schedule for project deliverables is shown in the following table:Deliverable Deliverable and Acceptance Criteria DeliverableNumber Due Date1 For Task 2.b, Draft TER NLT 4 weeksafter award ofAcceptance Criteria: Report must have the required content task orderand follow the required format2 For Task 2.b, Final Draft TER NLT 1 weekafter receipt ofAcceptance Criteria: All COR comments are addressed in CORthe TER. comments3 For Task 2.c, Draft RAIs NLT 4 weeksafter award ofAcceptance Criteria: RAIs are technically sound, adequately task orderaddress identified issues, and include a regulatory basis foreach request.4 For Task 2.c, Final RAIs NLT 1 weekafter receipt ofAcceptance Criteria: All COR comments are reflected in the CORRAIs. comments5 For Task 2.d, Draft Updated TER NLT 2 weeksafter receipt ofAcceptance Criteria: Deliverable contains required content RAIand incorporates all responses to RAIs from the licensee responses6 For Task 2.d, Final Updated TER NLT 1 weekafter receipt ofAcceptance Criteria: All COR comments are addressed in CORthe updated TER commentsAll of the above deliverables shall be submitted electronically to task order COR.5 7.0 REQUIRED LABOR CATEGORIES/ ESTIMATED LEVEL OF EFFORTLabor Category Minimum Qualification Estimated LaborRequirement HoursExtensive knowledge innuclear power plant systemsProject Manager & and GE Standard TechnicalTechnical Reviewer Specifications (10 years),thermal hydraulics.Neutronics; Master's Degreein Mechanical or NuclearEngineering8.0 GOVERNMENT-FURNISHED PROPERTYN/A9.0 PERIOD OF PERFORMANCEThe period of performance for this task order is as stated below, in SECTION F -Deliveries orPerformance NRCF030A PERIOD OF PERFORMANCE ALTERNATE 1.10.0 PLACE OF PERFORMANCEWork will be performed at the contractor's site.11.0 SPECIAL CONSIDERATIONS11.1 TRAVELIMEETINGSThe contractor will be authorized travel expenses consistent with the substantive provisions ofthe Federal Travel Regulation (FTR) and the limitation of funds specified in this task order. Alltravel requires prior written approval from the COR.The following travel may be required under this task order:One, 1-Person, 2-Day Trip to NRC Headquarters or Licensee FacilityAt the discretion of the C0R, meetings may be conducted via telephone or video conference.Travel will be reimbursed in accordance with FAR 31 .205-46, "Travel costs" and the GeneralServices Administration's Federal Travel Regulations at:http://www.gsa.gov/portal/content/10479011.2 SECURITY6 These documents contain proprietary information and they must be safeguarded againstunauthorized disclosure. After completion of work, the documents should either be destroyed orreturned to the NRC COR. If they are destroyed, please confirm this in an e-mail to the CORwith a copy to the CO and include the date and manner in which the documents weredestroyed.12.0 NRC FURNISHED MATERIALThe following NRC furnished materials will be provided to the contractor under Section J, below:Electronic copy of the MLSR13.0 OTHER APPLICABLE INFORMATIONa. License Fee RecoveryAll work under this task order is license fee recoverable.SECTION F -Deliveries or PerformanceNRCF030A PERIOD OF PERFORMANCE ALTERNATE IThis order shall commence on September 22, 2014 and will expire on March 20, 2015. (SeeFAR 52.216-18 -Ordering).(End of Clause)SECTION H -Special Contract Requirements2052.215-70 KEY PERSONNEL. (JAN 1993)(a) The following individuals are considered to be essential to the successful performance of thework hereunder:Project Manager M. Khatib-RahbarTech Reviewer C. KimuraTech Reviewer M. LibbyW. SchofieldTech Reviewer W. Schofield*The contractor agrees that personnel may not be removed from the contract work or replacedwithout compliance with paragraphs (b) and (c) of this section.(b) If one or more of the key personnel, for whatever reason, becomes, or is expected tobecome, unavailable for work under this contract for a continuous period exceeding 30 workdays, or is expected to devote substantially less effort to the work than indicated in the proposalor initially anticipated, the contractor shall immediately notify the contracting officer and shall,subject to the concurrence of the contracting officer, promptly replace the personnel withpersonnel of at least substantially equal ability and qualifications.7 (c) Each request for approval of substitutions must be in writing and contain a detailedexplanation of the circumstances necessitating the proposed substitutions. The request mustalso contain a complete resume for the proposed substitute and other information requested orneeded by the contracting officer to evaluate the proposed substitution. The contracting officerand the project officer shall evaluate the contractor's request and the contracting officer shall* promptly notify the contractor of his or her decision in writing.(d) If the contracting officer determines that suitable and timely replacement of key personnelwho have been reassigned, terminated, or have otherwise become unavailable for the contractwork is not reasonably forthcoming, or that the resultant reduction of productive effort would beso substantial as to impair the successful completion of the contract or the service order, thecontract may be terminated by the contracting officer for default or for the convenience of theGovernment, as appropriate. If the contracting officer finds the contractor at fault for thecondition, the contract price or fixed fee may be equitably adjusted downward to compensatethe Government for any resultant delay, loss, or damage.(End of Clause)2052.215-71 PROJECT OFFICER AUTHORITY. (OCT 1999)(a) The contracting officer's authorized representative hereinafter referred to as the projectofficer for this contract is:Name: Shaun AndersonAddress: US NRCOffice of Reactor RegulationMS-O-10E01Washington DC 20555Telephone Number: 301-415-2039Email: Shaun.Anderson(cnrc..ovThe alternate contracting officer's representative is:Name: Andrew ProffittAddress: US NRCOffice of Reactor RegulationWashington DC 20555Telephone Number: 301-415-1418Email: Andrew. Proffitt@(nrc.-gov(b) Performance of the work under this contract is subject to the technical direction of the NRCproject officer. The term technical direction is defined to include the following:(1) Technical direction to the contractor which shifts work emphasis between areas of work ortasks, authorizes travel which was unanticipated in the Schedule (i.e., travel not contemplated inthe Statement of Work or changes to specific travel identified in the Statement of Work), fills indetails, or otherwise serves to accomplish the contractual statement of work.(2) Provide advice and guidance to the contractor in the preparation of drawings, specifications,or technical portions of the work description.8 (3) Review and, where required by the contract, approve technical reports, drawings,specifications, and technical information to be delivered by the contractor to the Governmentunder the contract.(c) Technical direction must be within the general statement of work stated in the contract. Theproject officer does not have the authority to and may not issue any technical direction which:(1) Constitutes an assignment of work outside the general scope of the contract.(2) Constitutes a change as defined in the "Changes" clause of this contract.(3) In any way causes an increase or decrease in the total estimated contract cost, the fixed fee,if any, or the time required for contract performance.(4) Changes any of the expressed terms, conditions, or specifications of the contract.(5) Terminates the contract, settles any claim or dispute arising under the contract, or issuesany unilateral directive whatever.(d) All technical directions must be issued in writing by the project officer or must be confirmedby the project officer in writing within ten (10) working days after verbal issuance. A copy of thewritten direction must be furnished to the contracting officer. A copy of NRC Form 445, Requestfor Approval of Official Foreign Travel, which has received final approval from the NRC must befurnished to the contracting officer.(e) The contractor shall proceed promptly with the performance of technical directions dulyissued by the project officer in the manner prescribed by this clause and within the projectofficer's authority under the provisions of this clause.(f) If, in the opinion of the contractor, any instruction or direction issued by the project officer iswithin one of the categories defined in paragraph (c) of this section, the contractor may notproceed but shall notify the contracting officer in writing within five (5) working days after thereceipt of any instruction or direction and shall request that contracting officer to modify thecontract accordingly. Upon receiving the notification from the contractor, the contracting officershall issue an appropriate contract modification or advise the contractor in writing that, in thecontracting officer's opinion, the technical direction is within the scope of this article and doesnot constitute a change under the "Changes" clause.(g) Any unauthorized commitment or direction issued by the project officer may result in anunnecessary delay in the contractor's performance and may even result in the contractorexpending funds for unallowable costs under the contract.(h) A failure of the parties to agree upon the nature of the instruction or direction or upon thecontract action to be taken with respect to the instruction or direction is subject to 52.233-1 -Disputes.(i) In addition to providing technical direction as defined in paragraph (b) of the section, theproject officer shall:(1) Monitor the contractor's technical progress, including surveillance and assessment of9 performance, and recommend to the contracting officer changes in requirements.(2) Assist the contractor in the resolution of technical problems encountered duringperformance.(3) Review all costs requested for reimbursement by the contractor and submit to thecontracting officer recommendations for approval, disapproval, or suspension of payment forsupplies and services required under this contract.(End of Clause)SECTION J -List of Documents, Exhibits and Other AttachmentsAttachments:1. Monthly Letter Status Report Template10