Letter Sequence Response to RAI |
|---|
TAC:MD6398, Increase Flexibility in Mode Restraints, Addition of LCO 3.0.8, Inoperability of Snubbers, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec, Changes to Reflect Revision of 10 CFR 50.55A, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Correct Example 1.4-1, Containment Structural Integrity, TSTF-28, Correct LCO 3.0.6 Bases, Add Restriction for Lowest LOOP Tave During Mode 2 Physics Testing (Approved, Closed) TAC:MD6399, DC Electrical Rewrite - Update to TSTF-360, Eliminate Use of Term Core Alterations in Actions and Notes, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, DC Electrical Rewrite, Clarification of Required Features in 3.8.1 Actions (Approved, Closed) TAC:MD6400, DC Electrical Rewrite - Update to TSTF-360, Eliminate Use of Term Core Alterations in Actions and Notes, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable, DC Electrical Rewrite, Clarification of Required Features in 3.8.1 Actions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement
Results
Other: L-08-161, Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.0, L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs, L-08-338, Copy of Improved Technical Specifications (ITS), L-08-378, Implementation of Improved Technical Specification Amendment No. 279, ML073531253, ML080140025, ML081350505, ML082000451, ML082600577, ML082840099, ML082900630, ML082900683, ML082900780, ML082900882, ML082910112, ML082910125
|
MONTHYEARML0725600462007-09-11011 September 2007 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides Project stage: Meeting ML0725600562007-09-12012 September 2007 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides Project stage: Meeting ML0729001172007-11-0707 November 2007 Meeting Summary with Fenco to Discuss Licensees ITS Conversion License Amendment Request for Davis-Besse Project stage: Meeting ML0735312532008-02-0404 February 2008 Improved Technical Specification Conversion Project stage: Other NUREG-1430, Request for Additional Information, Update to B & W Plants Standard Technical Specifications NUREG-14302008-02-22022 February 2008 Request for Additional Information, Update to B & W Plants Standard Technical Specifications NUREG-1430 Project stage: RAI ML0814804652008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 5, (Revision 1), Section 3.0 - LCO and SR Applicability Project stage: Request ML0801400252008-05-16016 May 2008 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for a Hearing (Tac Nos. MD6319-MD3622, MD6324-MD6333, MD6398-MD6403, MD6644-MD6649, and MD6684) Project stage: Other L-08-161, Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.02008-05-16016 May 2008 Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.0 Project stage: Other L-08-159, Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD63982008-05-16016 May 2008 Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD6398 Project stage: Supplement ML0814804712008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 15, (Revision 1), Chapter 4.0 - Design Features Project stage: Request ML0814804692008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 11, (Revision 1), Section 3.6 - Containment Systems Project stage: Request ML0814804682008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 9, (Revision 1), Section 3.4 - Reactor Coolant System (RCS) Project stage: Request ML0814804662008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 6, (Revision 1), Section 3.1 - Reactivity Control Systems Project stage: Request ML0814804672008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 7, (Revision 1), Section 3.2 - Power Distribution Limits Project stage: Request ML0826005772008-05-30030 May 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website Project stage: Other ML0813505052008-06-17017 June 2008 Improved Technical Specifications Conversion Milestone Schedule Project stage: Other ML0815705882008-06-18018 June 2008 Request for Additional Information Related to Improved Technical Specifications Conversion Project stage: RAI ML0816503642008-06-20020 June 2008 RAI Related to Improved Technical Specifications Conversion Project stage: RAI L-08-221, Response to Request for Additional Information Related to Improved Technical Specifications Conversion2008-07-23023 July 2008 Response to Request for Additional Information Related to Improved Technical Specifications Conversion Project stage: Response to RAI ML0822706672008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 16, Revision 1, ITS Chapter 5.0, Administrative Controls Project stage: Request L-08-240, Improved Technical Specification Conversion License Amendment Request, Volume 14, Revision 1, ITS Section 3.9, Refueling Operations2008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 14, Revision 1, ITS Section 3.9, Refueling Operations Project stage: Request ML0822706612008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 1, Revision 1, Application of Selection Criteria to the DBNPS Technical Specifications Project stage: Request ML0822706622008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 2, Revision 1, Generic Determination of No Significant Hazards Consideration and Environmental Assessment Project stage: Request ML0822706702008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 13, Revision 1, ITS Section 3.8, Electrical Power Systems Project stage: Request ML0822706692008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 12, Revision 1, ITS Section 3.7, Plant Systems Project stage: Request ML0822706662008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 10, Revision 1, ITS Section 3.5, Emergency Core Cooling Systems Project stage: Request ML0822706652008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 8, Revision 1, Section 3.3 - Instrumentation Project stage: Request ML0822706642008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 4, Revision 1, ITS Chapter 2.0, Safety Limits Project stage: Request ML0822706632008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request Volume 3, Revision 1, ITS Chapter 1.0, Use and Application Project stage: Request ML0822706582008-08-0707 August 2008 Supplement to License Amendment Request: Conversion of Current Technical Specifications to Improved Technical Specifications - Volumes 1, 2, 3, 4, 8, 10, 12, 13, 14, and 16 Project stage: Supplement L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs Project stage: Other ML0826005762008-08-26026 August 2008 Copy of Applicable Portions of the NRC & Davis-Besse Improved Technical Specifications Conversion Website - Chapters 1.0, 2.0 and 5.0 & Sections 3.3, 3.5, 3.7, 3.8, & 3.9 & Response to Request for Additional Information Related to Update to Project stage: Response to RAI L-08-224, Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its2008-09-0303 September 2008 Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its Project stage: Response to RAI ML0824902952008-10-0202 October 2008 ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902622008-10-0202 October 2008 Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD Project stage: Draft Approval ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion Project stage: Draft Other ML0824902752008-10-0202 October 2008 Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902802008-10-0202 October 2008 ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902892008-10-0202 October 2008 ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824903002008-10-0202 October 2008 ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0820004512008-10-0808 October 2008 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications Project stage: Other ML0828400992008-10-0808 October 2008 Assessment -Davis-Besse Nuclear Power Station, Unit No. 1 - Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC 6398) Project stage: Other L-08-338, Copy of Improved Technical Specifications (ITS)2008-10-21021 October 2008 Copy of Improved Technical Specifications (ITS) Project stage: Other ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues Project stage: Other ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues Project stage: Other ML0829008822008-11-20020 November 2008 ITSB LA-Removed Details - Attachment to Davis-Besse Beyond Scope Issues Project stage: Other ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues Project stage: Other ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues Project stage: Other ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues Project stage: Other ML0829006002008-11-20020 November 2008 Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues Project stage: Approval 2008-02-04
[Table View] |
Copy of Applicable Portions of the NRC & Davis-Besse Improved Technical Specifications Conversion Website - Chapters 1.0, 2.0 and 5.0 & Sections 3.3, 3.5, 3.7, 3.8, & 3.9 & Response to Request for Additional Information Related to Update to| ML082600576 |
| Person / Time |
|---|
| Site: |
Davis Besse  |
|---|
| Issue date: |
08/26/2008 |
|---|
| From: |
Allen B FirstEnergy Nuclear Operating Co |
|---|
| To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
|---|
| References |
|---|
| L-08-241, NUREG-1430, TAC MD6398, TAC MD6399, TAC MD6400 |
| Download: ML082600576 (3) |
|
Text
FENOC "EN %
5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Barry S. Allen 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 August 26, 2008 L-08-241 10 CFR 50.90 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D. C. 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket No. 50-346, License No. NPF-3 Copy of Applicable Portions of the U.S. Nuclear Regulatory Commission and Davis-Besse Nuclear Power Station Improved Technical Specifications Conversion Website -
Chapters 1.0, 2.0, and 5.0 and Sections 3.3, 3.5, 3.7, 3.8, and 3.9, TAC No. MD6398 and Response to Request for Additional Information Related to Update to B&W Plants Standard Technical Specifications NUREG-1430, TAC Nos. MD6399 and MD6400 By letter dated August 3, 2007, as supplemented by letters dated October 29, 2007, May 16, 2008 (2 letters), July 23, 2008, and August 07, 2008, FirstEnergy Nuclear Operating Company (FENOC) submitted an application to amend the Technical Specifications of Davis-Besse Nuclear Power Station, Unit 1 (DBNPS), revising the current Technical Specifications (CTS) to the Improved Technical Specifications (ITS) consistent with the Improved Standard Technical Specifications (ISTS) as described in NUREG-1430, "Standard Technical Specifications Babcock and Wilcox Plants,"
Revision 3.1, and certain generic changes to the NUREG.
As part of the NRC review of the Davis-Besse ITS submittal dated August 3, 2007, NRC questions were provided using the NRC and DBNPS ITS Conversion Website. The NRC and DBNPS ITS Conversion Website was developed specifically to expedite NRC review and minimize the time delay between review and posting of NRC questions, development and posting of FENOC responses, and acceptance and closure of each identified NRC question by the responsible NRC reviewer. of this letter provides a copy of applicable portions of the U.S. Nuclear Regulatory Commission (NRC) and DBNPS ITS Conversion Website suitable for posting on the DBNPS docket, Docket No. 50-346. FENOC provided this information on the NRC and DBNPS ITS Conversion Website. FENOC used this information in NJ -12
Davis-Besse Nuclear Power Station L-08-241 Page 2 of 3 development of the Davis-Besse ITS supplemental submittal letter dated August 07, 2008. This information also documents the NRC review process for approving the requested amendments to the DBNPS Facility Operating License. is arranged by section. Each section is arranged chronologically by the dates of the original NRC questions, and includes the applicable NRC questions, FENOC response, and any attached electronic documentation, except the draft ITS submittal markup pages. Draft ITS markup pages are not included since the changes were provided in the Davis-Besse ITS supplemental submittal letter dated August 07, 2008. This letter provides the questions for those Volumes included in the August 07, 2008 letter:
Volume 3, Chapter 1.0 - Use and Application, Revision 1; Volume 4, Chapter 2.0 - Safety Limits, Revision 1; Volume 8, Section 3.3 - Instrumentation, Revision 1; Volume 10, Section 3.5 - Emergency Core Cooling Systems (ECCS), Revision 1; Volume 12, Section 3.7 - Plant Systems, Revision 1; Volume 13, Section 3.8 - Electrical Power Systems, Revision 1; Volume 14, Section 3.9 - Refueling Operations, Revision 1; and Volume 16, Chapter 5.0 - Administrative Controls, Revision 1.
The applicable portions of the NRC and DBNPS ITS Conversion Website for the remaining Vo!umes (Volumes 5, 6, 7, 9, 11, and 15) were provided by letter dated May 16, 2008.
Two questions from the website are not included in Attachment 1. The question numbers are 200712171517 and 200802121126. Both questions are associated with an NRC letter dated June 18, 2008. In that letter, the NRC staff requested additional information to complete the application review. Copies of these website questions will be provided with FENOC's written response to the NRC's request in a separate letter.
In addition, by letter dated February 22, 2008, the NRC staff requested additional information related to two beyond scope items. FENOC provided responses to the same NRC requests on the NRC and DBNPS ITS Conversion Website, and the questions were subsequently closed by the NRC. The FENOC responses to the NRC staff's questions are contained within the applicable dialogue response in Attachment 1. provides the NRC staff's questions, with a reference to the appropriate dialogue response.
Davis-Besse Nuclear Power Station L-08-241 Page 3 of 3 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -
Fleet Licensing, at (330) 761-6071.
I declare under penalty-of perjury that the foregoing is true and correct.
Executedon 4Yaj,4-26,,
Sincerely, Barry S. A1176, Vice President-Nuclear Attachments:
- 1. Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved Technical Specification (ITS)
Conversion Website.
- 2. Response to Request for Additional Information Related to Update to B&W Plants Standard Technical Specifications NUREG-1430 cc:
(all w/o Attachment)
NRC Region III Administrator NRR Project Manager NRC Resident Inspector Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison)
Utility Radiological Safety Board