ML11245A076

From kanterella
Revision as of 02:14, 13 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
FEMA, Final Report for the May 10, 2011, Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for the Davis-Besse Nuclear Power Plant
ML11245A076
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/22/2011
From: Velasquez A
US Dept of Homeland Security, Federal Emergency Management Agency
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11245A076 (141)


Text

U.S. Department of Homeland Security Region V 536 South Clark Street, Floor 6 Chicago, IL 60605 O 2 FEMA NRC Headquarters Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 To Whom It May Concern:

Enclosed is one copy of the Final After Action Report/Improvement Plan for the May 10, 2011, Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise for the Davis-Besse Nuclear Power Station. The State of Ohio, Ottawa and Lucas Counties, and the Utility owner/operator, FirstEnergy Corporation, participated in this exercise.

No Deficiencies were identified during this exercise for the State of Ohio, Ottawa or Lucas Counties. No Areas Requiring Corrective Action (ARCA) were identified during this exercise for the State of Ohio.

Two ARCAs were identified for Ottawa County and one ARCA was identified for Lucas County during this exercise.

No Planning Issues were identified for Ottawa or Lucas Counties during this exercise. One Planning Issue was identified for the State of Ohio.

The first ARCA identified for Ottawa County was against Criterion 3.b. 1 - Implementation of KI Decision, whereby the KI tablets with an expired expiration date of May 2007 were not removed from the Ohio Department of Transportation Oak Harbor Office when the new KI, with a current expiration date of February 2014, was delivered. The second ARCA identified for Ottawa County was against Criterion 6.a. 1 - Monitoring/Decontamination of Evacuees and Emergency Workers and Registration of Evacuees, whereby, the emergency workers did not understand how to interpret the Ludlum Model 3 Survey Meter readings based on the range selected. Both criteria were successfully re-demonstrated.

The ARCA identified for Lucas County was against Criterion 6.d. 1 - Transportation and Treatment of Contaminated Injured Individuals, whereby the Emergency Medical Services crew failed to properly monitor a potentially contaminated patient and failed to control potentially contaminated equipment. This ARCA was successfully re-demonstrated.

www.fema.gov

Document Control Desk Page #2 The Planning Issue for the State of Ohio was identified against Criterion 5.a. 1 - Activation of the Prompt Alert and Notification System, whereby the initial message used for alerting and notifying boaters on Lake Erie within the 10-mile Emergency Planning Zone did not specify the governmental organization or official with authority for providing the message as is required by NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in support of Nuclear Power Plants."

A detailed discussion of these issues can be found in Section 3.3 of this report under Criteria Evaluation Summaries.

Based on the results of the May 10, 2011, exercise, the offsite radiological emergency response plans and preparedness for the State of Ohio and the affected local jurisdictions, site-specific to the Davis-Besse Nuclear Power Station, can be implemented and are adequate to provide reasonable assurance that appropriate measures can be taken offsite to protect the health and safety of the public in the event of a radiological emergency at the site.

Therefore, the Title 44 CFR, Part 350, approval of the offsite radiological emergency response plans and preparedness for the State of Ohio site-specific to the Davis-Besse Nuclear Power Station, granted on June 15, 1987, remains in effect.

Copies of this Report were transmitted to the DHS/FEMA National Office, NRC Region III and the State of Ohio.

If you should have any questions, please contact William E. King, Chairman, Regional Assistance Committee, DHS/FEMA Region V, at (312) 408-5575.

Sincerely, Andrew Velasquez III Regional Administrator Enclosure (1)

Davis-Besse Nuclear Power Station After Action Report/

Improvement Plan Exercise Date - May 10, 2011 Radiological Emergency Preparedness (REP) Program k

FEMA Published August 1U, 2011

uniclassified Radioloi-ical Ernergenc% Preparedness Program (R-EI' After Action Report/Improvement Plan Davis-Besse Nuclear Power Station This page is intentionally blank.

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Davis-Besse Nuclear Power Station After Action Report/Improvement Plan Published August 10, 2011 Contents Executive Summary 6

Section 1: Exercise Overview 12 1.1 Exercise Details 12 1.2 Exercise Planning Team Leadership 12 1.3 Participating Organizations 14 Section 2: Exercise Design Summary 17 2.1 Exercise Purpose and Design 17 2.2 Exercise Objectives, Capabilities and Activities 17 2.3 Scenario Summary 17 Section 3: Analysis of Capabilities 19 3.1 Exercise Evaluation and Results 19 3.2 Summary Results of Exercise Evaluation 20 3.3 Criteria Evaluation Summaries 28 3.3.1 Ohio Jurisdictions 28 3.3.1.1 State of Ohio - Initial Notification Point 28 3.3.1.2 State of Ohio - Emergency Operations Center -

28 Executive Room 3.3.1.3 State of Ohio - Emergency Operations Center -

29 Assessment Room 3.3.1.4 State of Ohio - Emergency Operations Center - Joint 30 Information Center 3.3.1.5 State of Ohio - Davis-Besse Nuclear Power Station -

31 Joint Information Center 3.3.1.6 State of Ohio - Emergency Operations Facility 32 3.3.1.7 State of Ohio - Ottawa County Emergency 32 Operations Center - State Analysis 3.3.1.8 State of Ohio - Department of Natural Resources -

33 Route Alerting 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.2 Risk Jurisdictions 35 i

3.3.2.1 Ottawa County - Initial Notification Point 35 3.3.2.2 Ottawa County - Emergency Operations Center 35 1

3.3.2.3 Ottawa County - Joint Information Center - Liaison 36 3.3.2.4 Ottawa County - Ohio Department of Transportation 36 3

- Traffic Control Point/Access Control Point -

Dosimetry Control Officer Briefing 3.3.2.5 Ottawa County - Ohio Department of Transportation 37 i

- Traffic Control Point/Access Control Point 3.3.2.6 Ottawa County - Oak Harbor Police Department -

39 Traffic Control Point/Access Control Point -

Dosimetry Control Officer Briefing 3.3.2.7 Ottawa County - Oak Harbor Police Department -

40 Traffic Control Point/Access Control Point 3.3.2.8 Ottawa County - Port Clinton City School District -

40 Evacuation School 3.3.2.9 Ottawa County - Danbury Local Schools -

41 Evacuation School 3.3.2.10 Ottawa County - Edgewood Manor Nursing Center -

41 Special Population 3.3.2.11 Ottawa County - Allen-Clay Joint Fire District -

42 Dosimetry Control Officer Briefing 3.3.2.12 Ottawa County - Allen-Clay Joint Fire District -

42 Route Alerting and Verification 3.3.2.13 Ottawa County - Erie Township Fire Department -

43 Dosimetry Control Officer Briefing 3.3.2.14 Ottawa County - Erie Township Fire Department -

43 Backup Route Alerting 3.3.2.15 Ottawa County-Erie Twp Fire Department - Route 44 Alerting and Verification 3.3.2.16 Ottawa County - Rocky Ridge Fire Department -

45 i

Dosimetry Control Officer Briefing 3.3.2.17 Ottawa County - Rocky Ridge Fire Department -

45 1

Route Alerting and Verification 3.3.2.18 Ottawa County - Port Clinton Fire Department -

46 Dosimetry Control Officer Briefing I

3.3.2.19 Ottawa County - Port Clinton Fire Department -

46 Emergency Worker Monitoring and Decontamination 2

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.2.20 Ottawa County - Port Clinton Fire Department -

47 Emergency Worker Monitoring and Decontamination of Equipment and Vehicles 3.3.2.21 Ottawa County - Perkins High School - Congregate 47 Care Center 3.3.2.22 Lucas County - Initial Notification Point 48 3.3.2.23 Lucas County - Emergency Operations Center 48 3.3.2.24 Lucas County - Joint Information Center - Liaison 49 3.3.2.25 Lucas County - Oregon District Transportation -

49 Special Population 3.3.2.26 Lucas County - Sheriffs Road Patrol & Dosimetry 50 Coordinator - Traffic Control Point/Access Control Point - Dosimetry Control Officer Briefing 3.3.2.27 Lucas County - Sheriffs Road Patrol & Dosimetry 50 Coordinator - Traffic Control Point/Access Control Point 3.3.2.28 Lucas County - Jerusalem Township Fire 51 Department - Backup Route Alerting and Verification 3.3.2.29 Lucas County - Jerusalem Township Fire 52 Department - Medical Service - Transportation 3.3.2.30 Lucas County - Mercy St. Charles Hospital -

53 Medical Service - Facility 3.3.2.31 Lucas County - Jerusalem Township Fire 54 Department - Dosimetry Control Officer Briefing 3.3.3 Support Jurisdictions 55 3.3.3.1 Erie County - Sandusky High School - Reception 55 Center 3.3.3.2 Erie County - Sandusky High School - Evacuee 55 Monitoring 3.3.3.3 Erie County - Sandusky High School - Evacuee 56 Decontamination 3.3.3.4 Erie County - Sandusky High School - Evacuee 56 Monitoring and Decontamination of Vehicles and Equipment 3.3.3.5 Ottawa County - Briar Middle School - Congregate 58 Care Center Section 4: Conclusion 59 Appendix A: Improvement Plan 61 Appendix B: Exercise Timeline 62 3

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Appendix C: Exercise Evaluators and Team Leaders

.65 I

Appendix D: Acronyms and Abbreviations 68 Appendix E: Exercise Plan 71 Appendix F: Onsite and Off Site Scenario 117 4I I

I I

I I

I I

I I

I I

I I

4 1

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station This page is intentionally blank.

5

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station EXECUTIVE

SUMMARY

H On May 10, 2011, a Radiological Emergency Preparedness (REP) Partial Participation Plume i

Exposure Pathway Exercise evaluation was conducted by the U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA) for the 10-mile Emergency Planning Zone (EPZ) around the Davis-Besse Nuclear Power Station (DBNPS). The purpose of this exercise was to assess the capabilities of the State and local preparedness in responding to a 3

radiological emergency. This exercise was held in accordance with DHS/FEMA policies and guidance concerning the exercise of State and local radiological emergency response plans (RERPs) and procedures.

The most recent exercise at this site was conducted on May 12, 2009. The qualifying emergency preparedness exercise was conducted on March 31, 1987.

DHS/FEMA wishes to acknowledge the efforts of the many individuals who participated in this exercise. In the State of Ohio, the Counties of Ottawa and Lucas participated along with State Government.

I Protecting the public health and safety is the full-time job of some of the exercise participants and an additional assigned responsibility for others. Still others have willingly sought this 3

responsibility by volunteering to provide vital emergency services to their communities.

Cooperation and teamwork on the part of all participants was evident during this exercise.

This Final After Action Report contains the evaluation of the biennial exercise and the evaluation of the following out-of-sequence interviews and activities:

i State of Ohio:

3

U

  • Route Verification/Supplemental Route Alerting and Backup Route Alerting - Allen-Clay Joint Fire District Station #1
  • Route Verification/Supplemental Route Alerting and Backup Route Alerting - Rocky Ridge Fire Department I

- Route Verification/Supplemental Route Alerting and*Backup Route Alerting - Erie Township 6

1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station Fire Department

  • Monitoring/Decontamination of Evacuees and Evacuee Vehicles - Sandusky Fire Department
  • Registration of Evacuees - Erie County Job and Family Services
  • KI distribution to the Public - Erie County Department of Health
  • Monitoring/Decontamination of Emergency Workers, Vehicles and Equipment - Port Clinton Fire Department
  • Temporary Care of Evacuees - ARC - Perkins High School
  • Temporary Care of Evacuees - ARC - Briar Middle School Lucas County:
  1. Route Verification/Supplemental Route Alerting and Backup Route Alerting - Jerusalem Township Fire Department
  • Medical MS-i Services Drill - Trsnsportation - Jerusalem Township Fire Department
  • MS-1 Services Drill - Hospital - Mercy St. Charles Hospital Except where noted in this report, the State and local organizations demonstrated knowledge of and adequately implemented their emergency response plans and procedures.

No Deficiencies were identified during this exercise for the State of Ohio, Ottawa or Lucas Counties.

No ARCAs were identified during this exercise for the State of Ohio.

One Planning Issue was identified for the State of Ohio, and one Planning Issue from a previous exercise for the State of Ohio was resolved. No Planning Issues were identified for Ottawa or Lucas Counties.

Two ARCAs were identified for Ottawa County and one ARCA was identified for Lucas County during this exercise.

The first ARCA identified for Ottawa County was against Criterion 3.b. 1 - Implementation of KI Decision, whereby the KI tablets with an expired expiration date of May 2007 were not removed from the ODOT Oak Harbor Office when the new KI, with a current expiration date of February 2014, was delivered. The second ARCA identified for Ottawa County was against Criterion 6.a. 1 - Monitoring/Decontamination of Evacuees and Emergency Workers and Registration of 7

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Evacuees, whereby, the emergency workers did not understand how to interpret the Ludlum I

Model 3 Survey Meter readings based on the range selected. Both criteria were successfully re-demonstrated.

The ARCA identified for Lucas County was against Criterion 6.d. 1 - Transportation and 3

Treatment of Contaminated Injured Individuals, whereby the Emergency Medical Services crew failed to properly monitor a potentially contaminated patient and failed to control potentially 3

contaminated equipment. This ARCA was successfully re-demonstrated.

The Planning Issue for the State of Ohio was identified against Criterion 5.a. 1 - Activation of the i

Prompt Alert and Notification System, whereby the initial message used for alerting and notifying boaters on Lake Erie within the 10-mile Emergency Planning Zone did not specify the governmental organization or official with authority for providing the message, as is required by NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological 3

Emergency Response Plans and Preparedness in support of Nuclear Power Plants."

The Planning Issue from the 2010 Perry REP exercise was identified against Criterion 2.b. 1 -

a Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency, whereby the coordination of functions and timely sharing of information by the Dose Assessment staff in the Lake County Assessment Room and the Field Monitoring Team Coordinators for the State and Lake County were not documented in 3

procedures. This issue was resolved in Section 2.3.g. of the March 25, 2011, update to the Field Monitoring Team Coordinator Procedure Number 357 of the Ohio Emergency Operations Center 3

Procedures.

INTRODUCTION - EXERCISE BASIS I

On December 7, 1979, the President directed FEMA to assume the lead responsibility for all i

offsite nuclear planning and response. DHS/FEMA's activities are conducted pursuant to Title 44 of the Code of Federal Regulations (CFR) Parts 350 "Review and Approval of State and Local I

Radiological Emergency Plans and Preparedness", 351 "Radiological Emergency Planning and Preparedness" and 352 "Commercial Nuclear Power Plants: Emergency Preparedness Planning" i

(Commonly referred to as 44 CFR 350 through 352). These regulations are a key element in the Radiological Emergency Preparedness (REP) Program that was established following the Three 3

Mile Island Nuclear Station accident in March 1979.

81

.Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station FEMA Rule 44 CFR 350 establishes the policies and procedures for DHS/FEMA's initial and continued approval of State and local governments' radiological emergency planning and preparedness for commercial nuclear power plants. This approval is contingent, in part, on State and local governments' participation in joint exercises with licensees.

DHS/FEMA's responsibilities in radiological emergency planning for fixed nuclear facilities include the following:

  • Taking the lead in offsite emergency planning and in the review and evaluation of RERPs and procedures developed by State and local governments;
  • Determining whether such plans and procedures can be implemented on the basis of observation and evaluation of exercises of the plans and procedures conducted by State and local governments;

- Responding to requests by the U.S. Nuclear Regulatory Commission (NRC) pursuant to the Memorandum of Understanding between the NRC and FEMA dated June 17, 1993 (Federal Register, Vol. 58, No. 176, September 14, 1993); and

- Coordinating the activities of Federal agencies with responsibilities in the radiological emergency planning process:

- U.S. Department of Agriculture;

- U.S. Department of Commerce;

- U.S. Department of Energy;

- U.S. Department of Health and Human Services;

- U.S. Department of the Interior;

- U.S. Department of Transportation;

- U.S. Environmental Protection Agency;

- U.S. Food and Drug Administration; and

- U.S. Nuclear Regulatory Commission.

Representatives of these agencies serve on the DHS/FEMA Region V Regional Assistance Committee (RAC), which is chaired by DHS/FEMA.

Formal submission of the RERPs for the Davis-Besse Nuclear Power Station to FEMA Region V by the State of Ohio and involved local jurisdictions occurred on May 24, 1989. Formal approval 9

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station of these RERPs was granted by FEMA on March 15, 1991, under 44 CFR 350.

A REP Partial Participation Plume Exposure Pathway Exercise was conducted on May 10, 2011, and evaluated by DHS/FEMA to assess the capabilities of State and local offsite emergency preparedness organizations in implementing their RERPs and procedures to protect the public health and safety during a radiological emergency involving the Davis-Besse Nuclear Power Station. The purpose of this After Action Report (AAR)/Improvement Plan (IP) is to present the exercise results and findings based on the performance of the Offsite Response Organizations (ORO) during a simulated radiological emergency.

The findings presented in this AAR/IP are based on the evaluations of the Federal evaluation team, with final determinations made by the DHS/FEMA Region V RAC Chairperson, and approved by the DHS/FEMA Headquarters.

The criteria utilized in the FEMA evaluation process are contained in:

- NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980;

and I

  • FEMA "Radiological Emergency Preparedness: Exercise Evaluation Methodology; Notice" as published in the Federal Register Notice, Vol. 67, No. 80, dated April 25, 2002.

3 Section 1 of this report, entitled "Exercise Overview", presents. information pertaining to the team that planned and coordinated the exercise. This section also provides a listing of all participating jurisdictions and functional entities that were evaluated.

Section 2 of this report, entitled "Exercise Design Summary", contains the purpose and design of the exercise, a description of the plume pathway EPZ and presents basic information and data relevant to the exercise scenario.

Section 3 of this report, entitled "Analysis of Capabilities," presents detailed information on the 10

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station demonstration of applicable exercise criteria at each jurisdiction or functional entity evaluated in a jurisdiction-based, issues-only format. This section also contains: (1) descriptions of all Deficiencies and ARCAs (if any) assessed during this exercise, recommended corrective actions, and the State and local governments schedule of corrective actions, if applicable, for each identified exercise issue; and (2) descriptions of unresolved ARCAs assessed during previous exercises and the status of the OROs efforts to resolve them.

Section 4 of this report, entitled "Conclusions" presents the DHS/FEMA summary of overall exercise conduct and results as evaluated against the requirements of 44 CFR 350.

EMERGENCY PLANNING ZONE (EPZ) DESCRIPTION The Davis-Besse Nuclear Power Station (DBNPS) is located in Northwestern Ohio on the South Shore of Lake Erie, within Ottawa County, near Oak Harbor, which is approximately 25 miles east of Toledo. The facility is located on 954 acres on Lake Erie: 582 acres of the site, consisting of dike marsh areas which are leased to the U.S. Bureau of Sport Fisheries and Wildlife, forming the Navarre unit of the Ottawa National Wildlife Refuge. The area encompassing the EPZ includes part, or all, of the following communities: City of Port Clinton, Carroll, Erie, Bay, Benton, Harris, and Salem Townships in Ottawa County and Jerusalem Township in Lucas County. The 2003 permanent population of the 1 0-mile EPZ was approximately 20,807. The lakeshore within the EPZ, with the exception of the plant site, is primarily devoted to recreational activities. The area is home to many marinas serving Lake Erie boaters and has significant amounts of land reserved for public use in the form of parks and wildlife refuges.

Areas away from the lakefront are primarily agricultural in nature. Commercial centers exist in Oak Harbor and Port Clinton. Industrial activity can be found at the Erie Industrial Park in Erie Township, the Lakewinds Industrial Park in Salem Township, the City of Port Clinton as well as in some smaller facilities throughout the EPZ.

11

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station SECTION 1: EXERCISE OVERVIEW U

1.1 Exercise Details I

Exercise Name 3

Davis-Besse Nuclear Power Station Type of Exercise I

Plume Exercise Date May 10, 2011 Program Department of Homeland Security/FEMA Radiological Emergency Preparedness I

Program Scenario Type 3

Radiological Emergency 3

1.2 Exercise Planning Team Leadership William E. King Regional Assistance Committee Chairman 3

DHS/FEMA Technical Hazards Branch Chief 3

536 South Clark Street 6th Floor Chicago, Illinois, 60605 312-408-5575 william.king@dhs.gov Stephen Tulley 3

Exercise Director DHS/FEMA Supervisory Team Leader 536 So. Clark Street 121

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Chicago, Illinois, 60605 312-408-4425 stephen.tulley@dhs.gov Gary Naskrent Exercise Officer DHS/FEMA Supervisory Team Leader 536 South Clark Street 6th FLoor Chicago, Illinois, 60605 312-408-4214 gary.naskrent@dhs.gov Carolyn L. Sturghill Site Specialist DHS/FEMA Technical Hazards Program Specialist 536 South Clark Street 6th Floor Chicago, Illinois, 60605 312-408-5379 carolyn.sturghill@dhs.gov Carol O'Claire Duty Officer Ohio Emergency Management Agency Radiological Branch Chief 2855 West Dublin-Granville Road Columbus, Ohio, 43235 614-799-3915 coclaire@dps. state. oh.us Brian Martin Radiological Analyst 13

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Ohio Emergency Management Agency I

State Resident Radiological Analyst 315 Madison Street Port Clinton, Ohio, 43452 419-734-6903 I

bmartin@co.ottawa.oh.us I

David Dewitz Offsite Controller FirstEnergy Corporation Senior Nuclear Specialist 3

5501 N State Route 2 Oak Harbor, Ohio, 43449 419-344-5206 dcdewitz@firstenergycorp.com Broce W. Cope Lead Controller FirstEnergy Corporation Senior Nuclear Specialist 5501 N. State Route 2 Oak Harbor, Ohio, 43449 3

419-344-5200 bwcope@firstenergycorp.com 3

1.3 Participating Organizations 3

Agencies and organizations of the following jurisdictions participated in the Davis-Besse Nuclear Power Station exercise:

State Jurisdictions Ohio Department of Health m

Ohio Department of Natural Resources Ohio Emergency Management Agency 3

14

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Ohio Environmental Protection Agency Ohio State Highway Patrol Ohio Department of Transportation Risk Jurisdictions Ottawa County Radiological Group Ottawa County Public Information Ottawa County Jobs and Family Services Ottawa County Health Depaartment Ottawa County Fire/EMS Ottawa County Engineer Ottawa County Detention Facility Ottawa County Commissioners Ottawa County Transportation Agency Ottawa County Sheriffs Department Allen-Clay Joint Fire District Station 1 Rocky Ridge Fire Department Oak Harbor Police Department Port Clinton Fire Department Port Clinton School District Perkins High School Edgewood Manor Nursing Center Ottawa County Emergency Managency Agency Erie Township Fire Department Lucas County Emergency Management Agency Lucas County Sheriffs Department Lucas County Engineer Jerusalem Township Fire Depaartment Oregon City School District Oregon City School District Transportation Department Mercy St. Charles Hospital Support Jurisdictions Sandusky Fire Department Sandusky High School Erie County Job and Family Services 15

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Erie County Department of Health I

Danbury Local School District Private Organizations American Red Cross ARES 3

FirstEnergy Corporation WRVF 101.5 FM Radio Station FENOC Federal Jurisdictions United States Coast Guard I

I I

I I

I I

I I

I I

16 1

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station SECTION 2: EXERCISE DESIGN

SUMMARY

2.1 Exercise Purpose and Design The DHS/FEMA Region V Office evaluated the Davis-Besse Nuclear Power Station (DBNPS)

Radiological Emergency Preparedness (REP) Partial Participation Plume Exposure Pathway Exercise conducted on May 10, 2011, to assess the capabilities of local emergency preparedness organizations in implementing their Radiological Emergency Response Plans (RERP) and procedures to protect the public health and safety during a radiological emergency involving the DBNPS. The purpose of this Final After Action Report (AAR)/Improvement Plan (IP) is to present the results and findings on the performance of the Offsite Response Organizations (OROs) during a simulated radiological emergency.

2.2 Exercise Objectives, Capabilities and Activities Exercise objectives and identified Capabilities/REP Criteria selected for demonstration during the exercise are provided in Appendix F "Exercise Plan". The Exercise Planning Team (EPT) selected objectives that focus on evaluating emergency response procedures, identifying areas for improvement, and fostering collaboration between the various Offsite Response Organizations (OROs) and stakeholders. This exercise focused on the following objectives:

" ORO demonstration of effective Emergency Operations Management.

- ORO demonstration of effective Protective Action Decision Making.

" ORO demonstration of effective Protective Action Implementation.

" ORO demonstration of effective Field Measurement and Analysis.

  • ORO demonstration of effective Emergency Notification and Public Information.

" ORO demonstration of effective Support Operations and Facilities.

2.3 Scenario Summary Appendix F "Scenario Details," contains a summary of the Exercise Scenario, a simulated sequence of events that was used as the basis for invoking emergency response actions by Offsite Response Organizations (OROs) in the Davis-Besse Nuclear Power Station (DBNPS) REP Partial Participation Plume Exposure Pathway exercise on May 10, 2011.

Results of a technical review of the scenario, submitted by the State of Ohio and FirstEnergy 17

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Corporation on March 12, 2011, indicated that the scenario was adequate to support I

demonstration of DHS/FEMA requirements, as well as criteria selected by the OROs provided in the State's January 28, 2011, extent-of-play submission. DHS/FEMA Region V accepted this exercise scenario on April 28, 2011.

During the exercise, in addition to information and data provided through the DBNPS onsite scenario, controllers from the State of Ohio provided "inject messages" containing scenario events and/or relevant data to those persons or locations who would normally receive notification of such events. These inject messages were the method used for invoking additional specific response actions by OROs.

II I

I I

I I

I I

I I

18 1

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station SECTION 3: ANALYSIS OF CAPABILITIES 3.1 Exercise Evaluation and Results Contained in this section are results and findings of the evaluation of all jurisdictions and functional entities that participated in the May 10, 2011, REP Partial Participation Plume Exposure Pathway Exercise to test the offsite emergency response capabilities of State and local governments in the Emergency Planning Zone (EPZ) surrounding the Davis-Besse Nuclear Power Station.

Each jurisdiction and functional entity was evaluated based on its demonstration of exercise criteria delineated in Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002. Detailed information on the exercise criteria and the extent-of-play agreements used in this exercise are found in Appendix E "Exercise Plan" of this report.

Presented below are definitions of the terms used in this report relative to the criteria demonstration status:

- M - Met: The status of a REP exercise Evaluation Area Criterion indicating that the participating Offsite Response Organization (ORO) demonstrated all demonstration criteria for the Evaluation Area Criterion to the level required in the extent-of-play agreement with no Deficiencies or ARCAs assessed in the current exercise and no unresolved prior ARCAs.

- D - Deficiency: An observed or identified inadequacy of organizational performance in an exercise that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant.

  • A - Area Requiring Corrective Action (ARCA) - An observed or identified inadequacy of organizational performance in an exercise that is not considered, by itself, to adversely impact public health and safety. Listing of the demonstrated exercise criteria under which one or more ARCAs was/were assessed during the current exercise or ARCAs assessed during prior exercises remain unresolved. Included is a description of any ARCAs assessed during this exercise and the recommended corrective action to be demonstrated before or during the next biennial exercise.

- P - Plan Issue - An observed or identified inadequacy in the ORO's emergency plan or implementing procedures, rather than in the ORO's performance.

19

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station N - Not Demonstrated - Exercise criteria that were not demonstrated as scheduled during this I

exercise and the reason(s) they were not demonstrated.

  • Prior ARCAs - Resolved - Descriptions of ARCAs assessed during previous exercises that were resolved and the corrective actions demonstrated, in this exercise.

- Prior ARCAs - Unresolved - Descriptions of ARCAs assessed during prior exercises that were not resolved in this exercise. Included is the reason the ARCA remains unresolved and recommended corrective actions to be demonstrated before or during the next exercise.

3.2 Summary Results of Exercise Evaluation The matrix presented in Table 3.1, on the following pages, presents the status of all exercise criteria from Federal Register Notice: Vol. 67, No. 80, dated April 25, 2002, which were scheduled for demonstration during this exercise by all participating jurisdictions and functional entities. The criterion status box is blank if it was not scheduled for demonstration.

This subsection provides information on the evaluation of each participating jurisdiction and functional entity in a jurisdiction-based, issues-only format.

I The DHS has developed a standardized system for numbering exercise issues. This system is I

used to achieve consistency in numbering exercise issues among DHS Regions and site-specific exercise reports within each Region. It also is used to expedite tracking of exercise issues on a nationwide basis.

The identifying number of Deficiencies, ARCAs, and Plan Issues includes the following elements, with each element separated by a hyphen (-).

I

  • Plant Site Identifier - A two-digit number, corresponding to the Utility Billable Plant Site Code.
  • Exercise Year - The last two digits of the year the exercise was conducted.

" Criterion Number - An alpha and two-digit number corresponding to the criteria numbers in the six Exercise Evaluation Areas described in Federal Register Notice, Vol. 67, No. 80, dated April 25, 2002, which amends FEMA-REP 14, Radiological Emergency Preparedness Exercise Manual.

" Issue Classification Identifier - (D = Deficiency, A = ARCA, P = Plan Issue).

" Exercise Identification Number - A separate two or three-digit indexing number assigned to 20

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station each issue identified in the exercise.

Table 3.1 - Summary of Exercise Evaluation (4 pages)

DATE: 2011-05-10 SITE: Davis-Besse Nuclear Power Station, OH i

M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not 0 z C)

Demonstrated z C C o 0 o 5

Emergency Operations Management Mobilization lal M M M M M Facilities Ib]

Direction and Control lci M M M

M Communications Equipment ld]

M M M M M M M MIM Equip & Supplies to support operations lel I M M M

IMIM Protective Action Decision*Makin..

Emergency Worker Exposure Control 2al M M M

M Radiological Assessment and PARs 2b M M M

Decisions for the Plume Phase - PADs 2b2 M M M

PADs for protection of special populations 2cl I M M M

Rad Assessment and Decision making for Ingestion Pathway 2dl Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action implementaioni.'.

Implementation of emergency worker exposure control 3a]

M M

Implementation of KI decision 3bl M

M Implementation of protective actions for special populations - EOCs 3cl M

Implementation of protective actions for Schools 3c2 M

Implementation of traffic and access control 3dl M M M

Impediments to evacuation are identified and resolved 3d2 M

Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2

,Inplementation of relocation, re-entry, and return decisions 3f1 Field Measurement and Analysis..

Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl Laboratory operations 4cl Emergency Notification and Public Info Activation of the prompt alert and notification system 5a]

M M P

M Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 Emergency information and instructions for the public and the media 5bl M M M M Support Operations/Facilities Mon/Decon of evacuees and EWs and registration of evacuees 6al Mon/Decon of EW worker equipment 6bl Temporary care of evacuees 6c Transportation and treatment of contaminated injured individuals 6d]

21

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 2/4)

DATE: 2011-05-10 SITE: Davis-Besse Nuclear Power Station, OH M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not Demonstrated 0U U

H H

o U

U 17-0 0

I-,

0 U

U U

0

.0 Ca 0

i2.

H0*

C.:

0 70

  • 0 0

U-o F-o 0

ea F--

H an 0-aD a) 0 F-o Emereencv Onerations Management Mobilization I al Facilities INb Direction and Control Icl Communications Equipment IdI M

M M

M Equip & Supplies to support operations lel M M M M M M M M M M M Protective Action Decision Making Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bl Decisions for the Plume Phase - PADs 2b2 PADs for protection of special populations 2cl M

Rad Assessment and Decision making for Ingestion Pathway 2d]

Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action Implementation Implementation of emergency worker exposure control 3a]

M M M M M M M M M M M Implementation of KI decision 3bl M M M M M M M M M M M Implementation of protective actions for special populations - EOCs 3c]

M Implementation of protective actions for Schools 3c2 M M Implementation of traffic and access control 3dl M

M Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry, and return decisions 3fl Field Measi rement andi4nalyss Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4bl Laboratory operations 4c I Emergency.Notification and Public Info Activation of the prompt alert and notification system 5al M

Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 M

M Emergency information and instructions for the public and the media 5bl Support Operations/Facilities Mon/Decon of evacuees and EWs and registration of evacuees 6al I

I I

I I

I I

I I

I I

I I

I I

I I

22

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Mon/Decon of EW worker equipment 6b I Temporary care of evacuees 6c I Transportation and treatment of contaminated injured individuals 6d 1 23

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Table 3.1 - Summary of Exercise Evaluation (Continued. page 3/4)

U>

DATE: 2011-05-10 SITE: Davis-Besse Nuclear Power Station, OH to nL V

/

0 0

0 M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not 72 7=

Demonstrated F

> 4 4 4 4 0

-5

  • 0
  • t 01 0l 01 Q W 0 0 0

0 Emergency Operations Managemenit Mobilization I al Facilities 1b]

Direction and Control Idc Communications Equipment Idl M

M M M M

Equip & Supplies to support operations lel M MIM M

M Protective Action Decision Making Emergency Worker Exposure Control 2al Radiological Assessment and PARs 2bI Decisions for the Plume Phase - PADs 2b2 PADs for protection of special populations 2c]

Rad Assessment and Decision making for Ingestion Pathway 2d]

Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action.Implemeniation Implementation of emergency worker exposure control 3al M M M M M M M M Implementation of KI decision 3bl M M M M

Implementation of protective actions for special populations - EOCs 3cl implementation of protective actions for Schools 3c2 Implementation of traffic and access control 3d1 Impediments to evacuation are identified and resolved 3d2 Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry. and return decisions 3fl Field Measurement and Analysis Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b]

Laboratory operations 4cd Emergency Notificationand:Public Info Activation of the prompt alert and notification system 5al M

M Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 M

Emergency information and instructions for the public and the media 5bl Support Operations/Facilities:

Mon/Decon of evacuees and EWs and registration of evacuees 6al M M M M M

MonrDecon of EW worker equipment 6bl M

I I

I I

I I

I I

I I

I I

I I

I I

I 24

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Temporary care of evacuees Transportation and treatment of contaminated injured individuals 16el I

V TEE M

6d.1 25

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station After Action Report/Improvement Plan Table 3.1 - Summary of Exercise Evaluation (Continued. page 4/4)

DATE: 2011-05-10 SITE: Davis-Besse Nuclear Power Station, OH M: Met, A: ARCA, D: Deficiency, P: Plan Issue, N: Not Demonstrated 6

(.5 CI 0

U UU 0

Ca2

(.5 U

Ca I-0 0

efJ C) 9 M

0 U

U?

4 U

0 Cz CL C)

C.

F-Ca.

,.J i-C).

0(.)

0 CI, E

C)

Ca 2

C)

-C

(.5 Emergency Operations Ma nagement Mobilization lal M M Facilities lb]

Direction and Control l cl M

Communications Equipment Idl MM M

M M M M Equip & Supplies to support operations lel M

M M M

M M M M Protective Action Decision making,,

Emergency Worker Exposure Control 2al M

Radiological Assessment and PARs 2b]

Decisions for the Plume Phase - PADs 2b2 M

PADs for protection of special populations 2c1 M

Rad Assessment and Decision making for Ingestion Pathway 2d]

Rad Assess/Decision making concerning Relocation, Reentry, and Return 2el Protective Action Implementation Implementation of emergency worker exposure control 3a]

M M M M M M M M Implementation of KI decision 3b]

M M M M M M M

Implementation of protective actions for special populations - EOCs 3cl M

M Implementation of protective actions for Schools 3c2 M

Implementation of traffic and access control 3d1 M

M Impediments to evacuation are identified and resolved 3d2 M

Implementation of ingestion pathway decisions - availability/use of info 3el Materials for Ingestion Pathway PADs are available 3e2 Implementation of relocation, re-entry. and return decisions 3f1 Field Measurement alnd s.An.al"sis Adequate Equipment for Plume Phase Field Measurements 4al Field Teams obtain sufficient information 4a2 Field Teams Manage Sample Collection Appropriately 4a3 Post plume phase field measurements and sampling 4b1 Laboratory operations 4cl Emergency Notification and Pub'lic Info" Activation of the prompt alert and notification system 5al M

  • M Activation of the prompt alert and notification system - Fast Breaker 5a2 Activation of the prompt alert and notification system - Exception areas 5a3 M

Emergency information and instructions for the public and the media 5bl M M Support Operations/Facilities I

I I

I I

U I

I I

I I

I I

I I

I I

26

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Mon/Decon of evacuees and EWs and registration of evacuees Mon/Decon of EW worker equipment Temporary care of evacuees ITrannnortation and treatment of contaminated injured individuial*

6aI 6bI 6cl M

6dl M M Transportation and treatment of contaminated iniured individuals 6di M41 27

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3 Criteria Evaluation Summaries I

3.3.1 Ohio Jurisdictions 3.3.1.1 State of Ohio - Initial Notification Point 3

State of Ohio - Initial Notification Point During the Davis-Besse Nuclear Power Plant (DBNPP) Radiological Emergency Preparedness Exercise conducted on Tuesday, March 1, 2011, the State of Ohio Initial Notification Point (INP) successfully demonstrated the Target Capability to use effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. For the DPNPS, the State of Ohio INP is the Ohio State Highway Patrol (OSHP) District 6 Dispatch and 3

Communications Center located in the Ohio Emergency Management Agency, a secured facility located in Columbus Ohio. The INP is staffed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, seven days a week. A variety of primary and back-up communications systems were successfully demonstrated during the exercise.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.a.1, L.d.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None 5

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3

3.3.1.2 State of Ohio - Emergency Operations Center - Executive Room 1

During the Davis-Besse Nuclear Power Plant (DBNPP) Radiological Emergency Preparedness Exercise conducted on Tuesday, March 1, 2011, the Executive Group in the State Emergency 3

Operations Center successfully demonstrated the Target Capability for key personnel with leadership roles to provide direction and control to that part of the overall response effort for 3

which they are responsible, including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner, sufficient multi-agency coordination to respond to an incident at the DBNPS through timely activation, effective management of the EOC, and staffing to an operational level. The Emergency Management 28

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Agency Executive Director provided effective management, direction and control throughout the exercise, coordinated decision-making with Ottawa and Lucas Counties and ensured that clear and consistent information was communicated to the public.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.a.1, l.c.1, 1.d.1, L.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.1, 3.d.1, 5.a.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.3 State of Ohio - Emergency Operations Center - Assessment Room During the Davis-Besse Nuclear Power Station (DBNPS) Radiological Emergency Preparedness Exercise conducted on Tuesday, May 10, 2011, the State of Ohio Emergency Operations Center Assessment Room staff implemented a decision-making process, considering relevant factors and appropriate coordination, to ensure that an exposure control system, including the use of Potassium Iodide (KI), was in place for emergency workers, including provisions to authorize radiation exposure in excess of administrative limits or protective action guides. The Dose Assessment Group Supervisor issued emergency worker dose limits and potassium iodide ingestion recommendations. The Dose Assessment Systems Operator used Controller-injected infornation from simulated Field Monitoring Team air samples to calculate a dose conversion factor, and the Dose Assessment Group Supervisor provided a Protective Action Recommendation (PAR) to the State Executive Group recommending the lowering of Emergency Worker Exposure Limits, and the Radiological Assessment Branch Director issued a recommendation for Field Teams and Emergency Workers in designated Sub-Areas to take KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.a.1, 1.c.1, 1.d.1, 1.e.1, 2.a.1, 2.b.1, 2.b.2, 2.c.1, 3.d.1, 5.a.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None 29

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

f. PRIOR ISSUES - RESOLVED: 2.b.1.

ISSUE NO.: 47-10-2bl-P-01 ISSUE: The Dose Assessment Staff in the State EOC Assessment Room and the 3

Lake County EOC and, the field monitoring team coordinators for the State and Lake County EOC performed well during the Perry exercise exhibiting good teamwork, coordination of functions and timely sharing of information. However, the procedures and standard (suggested) operating guidelines used by these individuals are mostly silent on the coordination methods used during the exercise.

CORRECTIVE ACTION DEMONSTRATED: To ensure continued adequate 3

communication and coordination procedures for the Field Monitoring Team Coordinator and Radiological Systems Operator at Lake County EOC (dose assessment) will be revised to include provisions requiring communications with each other and county personnel. These revisions were completed on March 25, 2011.

g. PRIOR ISSUES - UNRESOLVED: None I

3.3.1.4 State of Ohio - Emergency Operations Center - Joint Information Center 3

During the Davis-Besse Nuclear Power Station (DBNPS) Radiological Emergency Preparedness 3

Exercise conducted on Tuesday May 10, 2011, the State of Ohio Emergency Operations Center (EOC) successfully demonstrated the Target Capability to provided accurate information to the public and news media in a timely manner and with a sense of urgency via the Public Information Officer (PIO) located in the EOC in Columbus, Ohio. The State EOC JIC was primarily tasked with the coordination and preparation of State of Ohio news releases, which included all required information. News briefings were conducted at the offsite JIC rather than the State EOC. State Information Packets on the DBNPS were available and included contact 3

information and information about responsibilities of the State of Ohio, the four ECLs, actions taken after a State of Emergency is declared by the Governor, siren activation and appropriate 1

individual response, sheltering-in-place, evacuation, and the State of Ohio plan for distribution and use of potassium iodide (KI).

3 In summary, the status of DHS/FEMA criteria for this location is as follows:

30

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

a.

MET: 1.d.1, 5.b.I.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.5 State of Ohio - Davis-Besse Nuclear Power Station - Joint Information Center During the Davis-Besse Nuclear Power Station (DBNPS) Radiological Emergency Preparedness Exercise conducted on Tuesday May 10, 201.1, the Joint Information Center (JIC) successfully demonstrated the Target Capability to provided accurate, timely, and useful information to the news media and public through the Joint Information Center (JIC) co-located with the First Energy Nuclear Operating Company corporate offices in Toledo, Ohio. The State of Ohio and Ottawa County and Lucas County Public Information Officers (PIOs) provided emergency public information to the public and media, used effective procedures to alert, notify, and mobilize personnel and activate the facility in a timely manner. Key personnel with leadership roles provided direction and control and ensured that emergency infonration and instructions were presented to the public and the news media in a timely manner. The Joint Information Center Media Briefing Team conducted pre-briefings to prepare for each media briefing. Several mock media representatives (Licensee employees) provided a realistic barrage of increasingly penetrating questions, all of which were appropriately handled and answered by the respective agency participants. Rumor control and media monitoring functions were conducted, and calls were logged, trends were identified, and the JIC Manager addressed them as appropriate in the media briefings. Media packets were available to the media in the Media Briefing Area.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.c.1, 1.d.1, 1.e.1,5.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None
g.

PRIOR ISSUES - UNRESOLVED: None 31

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.1.6 State of Ohio - Emergency Operations Facility I

During the Davis-Besse Nuclear Power Station Radiological Emergency Preparedness Exercise 3

conducted on Tuesday May 10, 2011, the Ohio Department of Health (ODH) and the Ohio Emergency Management Agency (EMA) Emergency Operations Facility (EOF) Liaisons 3

successfully demonstrated the Target Capability to issue appropriate dosimetry and procedures and manage radiological exposure to emergency workers in accordance with plans and procedures, and read and record dosimetry readings on a periodic basis. This demonstration was conducted at the Emergency Operations Facility located at the Davis-Besse Nuclear Power Station, Oak Harbor, Ohio. The EOF Liaisons had sufficient potassium iodide (KI) and appropriate KI instructions, and demonstrated appropriate record keeping for the administrative of KI for emergency workers should a decision be made to ingest KI.

3 In summary, the status of DHS/FEMA criteria for this location is as follows:

3

a.

MET: L.d.l,3.a.l,3.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3

3.3.1.7 State of Ohio - Ottawa County Emergency Operations Center - State Analysis I

During the Davis-Besse Nuclear Power Station (DBNPS) Radiological Emergency Preparedness Exercise conducted on Tuesday, May 10, 2011, the State Radiological Analyst in the Ottawa County Emergency Operations Center successfully demonstrated the Target Capability to support the County's decision-making process for ensuring that relevant factors were considered I

and appropriate coordination between the State and County occurred, an exposure control system, including the use of potassium iodide (KI), was in place for emergency workers, and that 3

provisions were in place to authorize radiation exposure in excess of administrative limits or protective action guides. He also ensured that appropriate protective action recommendations 3

were based on available information on plant conditions, field monitoring data, licensee and offsite response organization dose projections, and knowledge of onsite and offsite environmental conditions.

32 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.d.1,2.a.l,2.b.l.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.1.8 State of Ohio - Department of Natural Resources - Route Alerting As part of the Davis-Besse Nuclear Power Station (DBNPS) Radiological Emergency Preparedness Exercise conducted on Tuesday May 10, 2011, the Ohio Department of Natural Resources (ODNR) demonstrated the Target Capability to alert and notify the public in a timely manner following the decision to notify the public of an emergency situation. This interview was conducted during an out-of-sequence activity on Wednesday May 11, 2011, at the office of the Ohio Department of Natural Resources in Sandusky, Ohio 44870. Boaters utilizing Lake Erie within the 10-mile EPZ would be alerted and notified at the Alert and subsequent emergency classification levels (ECLs) of an emergency situation at the DBNPS by the land based siren system and by the ODNR marine radio and watercraft.

The ODNR would either restrict or evacuate boat traffic in Lake Erie within the EPZ (Sub-Area

12) in accordance with the ECL or upon specific instructions. Boating Advisories issued by the ODNR would inform boaters that an emergency has been declared at the DBNPS, that the State of Ohio has order restriction or evacuation of boating traffic, that important information can be found at the marina and local telephone books, and to tune to local EAS radio and/or television stations for further information.

The initial message used for alerting and notifying boaters within Lake Erie and within the EPZ did not specify the governmental organization nor the official with authority for providing the message as required by FEMA. A recommendation was made to revise the pre-scripted message in the ODNR checklist to specify the governmental organization and the official with authority for providing the message, as required by FEMA.

In summary, the status of DHS/FEMA criteria for this location is as follows:

33

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

a. MET: None i
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None U

d. PLAN ISSUES: 5.a.1.

ISSUE NO.: 18-11-5al-P-03 CRITERION: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized offsite officials to notify the public of an emergency situation. (10 CFR Part 50, I

Appendix E & NUREG-0654, E. 1.,4.,5.,6.,7.)

CONDITION: The initial message used for alerting and notifying boaters within Lake Erie and within the EPZ does not specify the governmental organization nor the official with authority for providing the message as required by FEMA.

POSSIBLE CAUSE: The Ohio Department of Natural Resources, Lake Erie 1

Restriction / Clearance Checklist contains pre-scripted messages. The pre-scripted messages do not specify the governmental organization nor the official with authority I

for providing the message as required by FEMA.

REFERENCE:

Federal Register iVol. 66, No. 177 /Wednesday, September 12, 2001

/Notices, REP Exercise Preparation Guide for Evaluators and Team Leaders, Criteria 3

5.a.1 10 CFR Part 50, Appendix E.IV, D, E.5, 6, 7 3

EFFECT: Boaters hearing the Boating Advisories would not know who is authorizing the prescribed actions and may not take the message as serious or not as U

serious which could possibly delay the protective actions.

RECOMMENDATION: Revise the pre-scripted message in the ODNR checklist to specify the governmental organization and the official with authority for providing 3

the message as required by FEMA.

34

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2 Risk Jurisdictions 3.3.2.1 Ottawa County - Initial Notification Point The Ottawa County Initial Notification Point (INP), located in the Ottawa County Sheriff s Dispatch Center, demonstrated the Target Capability of Emergency Operations Center Management. The Ottawa County INP used effective procedures to alert, notify, and mobilize emergency personnel and activate facilities in a timely manner. Dispatchers were familiar with their nuclear incident notification procedures. There are redundant communication systems available at the Dispatch Center, and both primary and backup systems were used effectively during this exercise.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.a.l,.d.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.2 Ottawa County - Emergency Operations Center The Ottawa County Emergency Operations Center (EOC) demonstrated the Target Capability of Emergency Operations Center Management by activities including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner. The focus always remained on the primary objective, which is protecting the public health and safety of those who live and work in local communities. The Ottawa County Emergency Management Agency Director fully demonstrated the decision-making process involving appropriate factors and necessary coordination when making Protective Action Decisions. Direction and control for the overall response effort of the Ottawa County EOC was successfully demonstrated by the President of the Board of Commissioners and the EMA 35

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Director.

In summary, the status of DHS/FEMA criteria for this location is as follows:

i

a.

MET: 1.a.1, l.c.1, 1.d.1, L.e.1, 2.a.1, 2.b.2, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1, 5.b.l.

3

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None
g.

PRIOR ISSUES - UNRESOLVED: None I

3.3.2.3 Ottawa County -.Joint Information Center - Liaison The Ottawa County Public Information Officer (PIO) demonstrated the Target Capability of Providing Emergency Public Information through the County Public Information Officers PIO at the Joint Information Center (JIC). Effective procedures were used to alert, notify, and mobilize personnel and activate the facility in a timely manner. Key personnel with leadership roles provided direction and control. Emergency information and instructions were presented to the i

public and the news media in a timely manner.

U In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 5.b.1.

3

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None I

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None i
g.

PRIOR ISSUES - UNRESOLVED: None I

3.3.2.4 Ottawa County - Ohio Department of Transportation - Traffic Control Point/Access Control Point - Dosimetry Control Officer Briefing 5

The Ohio Department ofTransportation (ODOT) - Oak Harbor Garage demonstrated the Target Capability of conducting Dosimetry Breifings and ensured equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies were sufficient to support management of 36 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station radiological exposure to emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.e.1,3.a.1,3.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.5 Ottawa County - Ohio Department of Transportation - Traffic Control Point/Access Control Point The Ohio Department offransportation (ODOT) - Oak Harbor Garage demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, ODOT demonstrated knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.d. 1, L.e. 1, 3.a. 1, 3.b. 1, 3.d. 1.

b. AREAS REQUIRING CORRECTIVE ACTION: 3.b. 1.

ISSUE NO.: 18-11-3bl-A-01 CRITERION: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the admin of KI for emergency workers and institutionalized individuals (not general public) is maintained. (NUREG-0654, E.7., J.10.e.f.)

37

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

CONDITION: THE OHIO PLAN FOR RESPONSE TO RADIATION EMERGENCIES AT COMMERCIAL NUCLEAR POWER PLANTS, Page 11 3

177, Part J - Protective Response, Section 3 - Methods of Accomplishment, Sub-section 3.3.1-5 states that the KI for emergency workers, other than responding ONG 3

units, shall be pre-distributed by the Resident Radiological Analyst as part of a dosimetry packet that is in place for each worker at each agency's main office or staging area. The ODH-BRP is responsible for ensuring the analyst is provided replacement KI prior to the expiration date.

During the Dosimetry Coordinator (DC) Briefing at the Ohio Department of Transportation (ODOT) Oak Harbor Garage, the evaluator observed the DC 3

distributing KI to the Emergency Worker (EW). The KI was presented in individually sealed foil containers (130mg each), and were kept in a zip-lock type plastic bag along with a KI information pamphlet. The KI was manufactured by IOSAT and displayed an expiration date of 5-2007. The evaluator asked the controller if there was a letter extending the shelf life. The controller investigated and found another group of KI tablets in the dosimetry box, displaying an expiration date of Feb-2014. The KI tablets were not intermixed, one group contained the older expiration date and a separate group contained the newer expiration date. The controller took control of the older KI tablets and stated that he would deliver them to i

the Ottawa County EOC for disposition. He handed the DC the newer batch of KI tablets and the interview continued.

5 POSSIBLE CAUSE: The expired (exp. 5-2007) KI tablets were not removed from the ODOT Oak Harbor Office when the new (exp. Feb-2014) KI was delivered.

REFERENCE:

NUREG-0654 I

II. Planning Standards and Evaluation Criteria J. Protective Response 3

J. 10 The organization's plans to implement protective measures for the plume exposure pathway shall include:

5 J. 10.e Provisions for the use of radioprotective drugs, particularly for emergency workers and institutionalized persons within the plume exposure EPZ whose immediate evacuation may be infeasible or very difficult, including quantities, 38 l

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station storage, and means of distribution.

REP PROGRAM MANUAL (III.B.3.)

Section III. - REP Exercise Guidelines Sub-section B. - Evaluation Areas Sub-section 3. - Protective Action Implementation Sub-element 3.b. - Implementation of KI Decision EFFECT: In an actual event the DC could issue the expired KI to emergency workers. The emergency workers could ingest the expired KI, which may not adequately saturate their thyroid gland to protect the worker from radioactive iodine.

CORRECTIVE ACTION DEMONSTRATED: KI inventory was reviewed and all outdated KI was removed. KI was redistributed to emergency workers, the new KI was dated 02-2014.

c. DEFICIENCY: None
d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.6 Ottawa County - Oak Harbor Police Department - Traffic Control Point/Access Control Point - Dosimetry Control Officer Briefing Ottawa County Traffic and Access Control Point (TACP) Dosimetry Control Officer Briefing demonstrated the Target Capability to provide sufficient equipment, displays, dosimetry, potassium iodide (KI) and other supplies to support emergency operations. The Oak Harbor Police Department ensured the officers were issued appropriate dosimetry and adequately managed radiological exposure control in accordance with plans and procedures.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: L.e. 1, 3.a. 1, 3.b. 1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None 39

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

d. PLAN ISSUES: None 1
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None 3
g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.7 Ottawa County - Oak Harbor Police Department - Traffic Control Point/Access Control Point I

Ottawa County Traffic and Access Control Point (TACP) demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the 5

distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile 3

Emergency Planning Zone. During the interview, the Oak Harbor Police Department demonstrated knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, l.e.l, 3.a.1, 3.b.1, 3.d.l. 1

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None 5

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.8 Ottawa County - Port Clinton City School District - Evacuation School I

Ottawa County demonstrated the Target Capability of Citizen Evacuation and Shelter-in-Place for school children. The Port Clinton City School District representative described plans and procedures to safely evacuate students from the Davis-Besse Nuclear Power Station Emergency Planning Zone and reunite them with their families. The school district demonstrated sufficient I

personnel, current contact information, worker dosimetry, and communications capabilities to notify families and guardians regarding how to reunite with evacuated students.

40

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: l.e.1,3.a.1,3.b.1,3.c.2.
b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.9 Ottawa County - Danbury Local Schools - Evacuation School Ottawa County demonstrated the Target Capability of Citizen Evacuation and Shelter-in-Place for school children. The Danbury Local Schools, representative described plans and procedures to safely evacuate students from the Davis-Besse Nuclear Power Station Emergency Planning Zone and reunite them with their families. Danbury Local Schools demonstrated sufficient personnel, current contact information, worker dosimetry, and communications capabilities to notify families and guardians regarding how to reunite with evacuated students.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.e.1, 3.a.1, 3.b.1, 3.c.2.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.10 Ottawa County - Edgewood Manor Nursing Center - Special Population Ottawa County demonstrated the Target Capability to implement appropriate protective actions for special populations. The Edgewood Manor Nursing Center demonstrated the capability to provide emergency information, instructions, and transportation assistance to individuals with special needs by utilizing their plans and procedures.

In summary, the status of DHS/FEMA criteria for this location is as follows:

41

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

a. MET: 1.e.l, 2.c.1, 3.a.1, 3.b.1, 3.c.1.

i

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None 3
d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None 3

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 4n RO SUE NE OLE:Nn 1

3.3.2.11 Ottawa County - Allen-Clay Joint Fire District - Dosimetry Control Officer Briefing 3

Ottawa County demonstrated at the Allen-Clay Joint Fire District, the Target Capability of conducting Dosimetry Briefings and ensured equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies were sufficient to support management of radiological exposure to emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.e.l., 3.a.1, 3.b.l.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.12 Ottawa County - Allen-Clay Joint Fire District - Route Alerting and Verification The Ottawa County Allen-Clay Joint Fire District demonstrated the Target Capability associated with ensuring all persons within the Erie Township locality were alerted and notified of the ongoing emergency at the utility, the Route Verification/Backup Route Alerting Team Leader was prepared with route verification assignments for three teams in Sub-Areas 6 and 7, sections 601, 701, 702. Following the briefings, three teams of two fire personnel each were given a Route Verification Notebook with the specific map for their Sub-Area section, a special needs list of known individuals in that section, hearing impaired cards with information in English and Spanish, green emergency message cards in English and Spanish, and a transportation needs worksheet to be completed by one of the team members for anyone requesting transportation 42

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station assistance.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.d.1, L.e.1, 3.a.1,3.b.1, 5.a.1, 5.a.3.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.13 Ottawa County - Erie Township Fire Department - Dosimetry Control Officer Briefing Ottawa County demonstrated at the Erie Township Fire Department, the Target Capability of conducting Dosimetry Briefings and ensured equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies were sufficient to support management of radiological exposure to emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.e.l,3.a.l,3.b.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.14 Ottawa County - Erie Township Fire Department - Backup Route Alerting The Ottawa County Erie Township Fire Department successfully demonstrated the Target Capability to provide alert and notification of the public should primary alert and notification systems fail. The activities associated with ensuring that all persons within the Erie Township Subarea 7, section 701 siren coverage areas were alerted and notified, in a timely manner of the emergency declared at DBNPS.

43

Unclassified

Davis-Besse Nuclear Power Station I

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.3.

3

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None 3

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.15 Ottawa County-Erie Twp Fire Department - Route Alerting and Verification I

The Ottawa County Erie Township Fire Department demonstrated the Target Capability associated with ensuring all persons within the Erie Township locality were alerted and notified of the ongoing emergency at the utility, the Route Verification/Backup Route Alerting Team Leader was prepared with route verification assignments for three teams in Sub-Areas 6 and 7, sections 601, 701, 702. Following the briefings, three teams of two fire personnel each were given a Route Verification Notebook with the specific map for their Sub-Area section, a special needs list of known individuals in that section, hearing impaired cards with information in English and Spanish, green emergency message cards in English and Spanish, and a transportation needs worksheet to be completed by one of the team members for anyone 3

requesting transportation assistance.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 5.a.1.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None i
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None 3

g.

PRIOR ISSUES - UNRESOLVED: None I

441

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.2.16 Ottawa County - Rocky Ridge Fire Department - Dosimetry Control Officer Briefing Ottawa County Traffic and Access Control Point (TACP) Dosimetry Control Officer Briefing demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to implement Traffic and Access Control Posts (TACPs) within the 10-mile Emergency Planning Zone. During the interview, the Rocky Ridge Fire Department demonstrated knowledge of the provisions of the Emergency Operations Plan related to the establishment of TACPs in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including portable radios, cell phones and mobile data terminals. This included the provision of dosimetry and the ability to manage emergency worker radiological exposure including the decision to implement KI.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.e.1,3.a.l,3.b.l.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.17 Ottawa County - Rocky Ridge Fire Department - Route Alerting and Verification The Ottawa County Rocky Ridge Fire Department successfully demonstrated the Target Capability associated with ensuring all persons within the Rocky Ridge locality were alerted and notified of the ongoing emergency at the utility the procedures, knowledge, and ability to provide route verification for prompt alert and notification of the public to an emergency situation.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, 1.e.1, 3.a.1, 3.b.1, 5.a.1, 5.a.3.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None 45

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

e.

NOT DEMONSTRATED: None I

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3

3.3.2.18 Ottawa County - Port Clinton Fire Department - Dosimetry Control Officer 3

Briefing Ottawa County demonstrated at the Port Clinton Fire Department, the Target Capability of I

conducting Dosimetry Briefings and ensured equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies were sufficient to support management of radiological exposure I

to emergency workers.

I In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: L.e. 1, 3.a. 1, 3.b. 1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f. PRIOR ISSUES - RESOLVED: None 5
g.

PRIOR ISSUES - UNRESOLVED: None I

3.3.2.19 Ottawa County - Port Clinton Fire Department - Emergency Worker Monitoring and Decontamination 5

Ottawa County successfully demonstrated the Target Capability for monitoring and decontamination of emergency workers. The Port Clinton Fire Department had the capability to establish adequate facilities, resources, and trained personnel to provide monitoring and decontamination of emergency workers.

5 In summary, the status of DHS/FEMA criteria for this location is as follows:

3

a.

MET: L.d.1,3.a.1,6.a.l.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c. DEFICIENCY: None
d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None I

46

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.20 Ottawa County - Port Clinton Fire Department - Emergency Worker Monitoring and Decontamination of Equipment and Vehicles Ottawa County successfully demonstrated the Target Capability for Emergency Worker Monitoring and Decontamination of Equipment and Vehicles. The Port Clinton Fire Department had adequate procedures and resources for accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.e.1,6.b.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e. NOT DEMONSTRATED: None
f.

PRIOR ISSUES - RESOLVED: None

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.21 Ottawa County - Perkins High School - Congregate Care Center Ottawa County successfully demonstrated the Target Capability of Congregate Care Center (CCC) at the Perkins High School. The Fireland'Chapter of the American Red Cross (ARC) successfully demonstrated that they had the resources to provide services and accommodations consistent with American Red Cross planning guidelines, and had procedures to assure that evacuees had been monitored for contamination, and had been decontaminated as appropriate prior to entering the congregate care facility.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 6.c.1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None 47

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

f.

PRIOR ISSUES - RESOLVED: None I

g.

PRIOR ISSUES - UNRESOLVED: None I

3.3.2.22 Lucas County - Initial Notification Point Lucas County demonstrated the Target Capability of Emergency Operations Center Management at the Initial Warning Point, located in the Lucas County Sheriff's Office, Dispatch Center. The dispatchers demonstrated the ability to alert, notify, and mobilize emergency personnel in a timely manner. The dispatchers were familiar with the nuclear incident notification procedures, demonstrated the redundant communication systems available at the Dispatch Center, and used 3

both primary and backup systems effectively during this exercise.

I In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.a.1, l.d.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None I

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None I

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.23 Lucas County - Emergency Operations Center Lucas County demonstrated the Target Capability of Emergency Operations Center Management l

including the use of effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner. The Lucas County EOC demonstrated sufficient multi-I agency coordination to respond to an incident at the Davis-Besse Nuclear Power Station through timely activation and efficient operations throughout the exercise. The EOC was managed 3

efficiently and effectively, completed a full notification and activation, and was staffed to an operational level. The Emergency Management Agency Director and County Administrator 3

provided effective management, direction and control throughout the exercise. The Lucas County EOC coordinated decision-making with the State EOC, JIC and other jurisdictions and ensured that a clear and consistent message was communicated to the public.

In summary, the status of DHS/FEMA criteria for this location is as follows:

i 48

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

a.

MET: 1.a.1, l.c.1, l.d.1, L.e.1, 2.a.l, 2.b.2, 2.c.1, 3.a.1, 3.b.1, 3.c.1, 3.c.2, 3.d.1, 3.d.2, 5.a.1, 5.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.24 Lucas County - Joint Information Center - Liaison Lucas County demonstrated the Target Capability of Providing Emergency Public Information through the County Public Information Officer (PIO) at the Joint Information Center (JIC).

Lucas County PIO coordinated with counterparts in the JIC and County EOC to provide timely, accurate and useful information to the public. The Lucas County PIO produced and coordinated the release of nine separate news releases.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 5.b.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.25 Lucas County - Oregon District Transportation - Special Population Lucas County demonstrated the Target Capability of Citizen Evacuation and Shelter-in-Place for school children at the Oregon City School Transportation Department. Oregon City School District and Transportation Department representatives described plans and procedures to safely evacuate students from the Davis-Besse Nuclear Power Station 10-mile Emergency Planning Zone and reunite them with their families. The school district demonstrated sufficient personnel, current contact information, emergency worker dosimetry, and communications capabilities to notify families and guardians regarding how to reunite with evacuated students.

49

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d. 1, L.e. 1, 3.a. 1, 3.b. 1, 3.c.1.

3

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None 3

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None l

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.26 Lucas County - Sheriffs Road Patrol & Dosimetry Coordinator - Traffic Control Point/Access Control Point - Dosimetry Control Officer Briefing 3

Lucas County demonstrated the Target Capability of Critical Resource Logistics and Distribution 3

through the establishment of a Dosimetry Distribution Point at Lucas County Sheriff's Office Substation in Curtice, Ohio. The Dosimetry Coordinator demonstrated the proper use of direct-reading and thermoluminescent dosimeters, calibration equipment and communications systems.

I The Dosimetry Coordinator conducted a thorough briefing regarding the use of and record keeping requirements for personal dosimetry kits including the proper procedures and 3

documentation of the use of potassium iodide.

3 In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.e.l,3.a.l,3.b.l.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None II

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None I
g.

PRIOR ISSUES - UNRESOLVED: None i

3.3.2.27 Lucas County - Sheriffs Road Patrol & Dosimetry Coordinator - Traffic Control Point/Access Control Point 5

Lucas County demonstrated the Target Capability of Emergency Public Safety and Security Response through interview which included the distribution of dosimetry, emergency worker U

radiological exposure management, and the capability to implement Traffic and Access Control 50 1

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Points (TACPs) within the Davis-Besse Nuclear Power Station 10-mile Emergency Planning Zone. During the interview, the Deputy demonstrated thorough knowledge of the provisions of the Lucas County Radiological Emergency Response Plan related to the establishment of TCPs in addition to the use of appropriate dosimetry procedures, documentation and communications equipment including portable radios, cell phones and mobile data terminals.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d. 1, 1.e. 1, 3.a. 1, 3.b. 1, 3.d. 1.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.28 Lucas County - Jerusalem Township Fire Department - Backup Route Alerting and Verification Lucas County demonstrated the Target Capability of Emergency Public Safety and Security Response through out-of-sequence activity which included the distribution of dosimetry, emergency worker radiological exposure management, and the capability to perform Backup Route Alerting and Verification within the 10-mile Emergency Planning Zone. Jerusalem Township Fire Department personnel demonstrated thorough knowledge of the provisions of the Lucas County Radiological Emergency Response Plan related to the execution of Backup Route Alerting and Verification in addition to the use of the appropriate dosimetry procedures, documentation and communication equipment including a vehicle mounted public address system, portable radios, cell phones and mobile data terminals.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d., L.e. 1, 3.a. 1, 3.b.1, 5.a. 1, 5.a.3.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None 51

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

g. PRIOR ISSUES - UNRESOLVED: None 3.3.2.29 Lucas County - Jerusalem Township Fire Department - Medical Service -

Transportation Lucas County demonstrated the Target Capability of Emergency Triage and Pre-Hospital Treatment through out-of-sequence event at the Jerusalem Township Fire Department.

Demonstrated activities included communications systems, maps, monitoring instruments, dosimetry and potassium iodide sufficient to support emergency operations. The Jerusalem Township Fire Department personnel demonstrated proper use of personal dosimetry to monitor and control radiation exposure and knew to report to their supervisor if their dosimeters indicated reaching either the administrative and/or maximum exposure limits as prescribed in the Lucas 3

County plans and procedures. Jerusalem Township Fire Department personnel demonstrated proper patient handling, care, and transportation of a potentially contaminated medical patient and medical care took priority over monitoring, decontamination, and contamination control efforts.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, 1.e.l, 3.a.l, 3.b.l, 6.d.l1.

b.

AREAS REQUIRING CORRECTIVE ACTION: 6.d.1.

I ISSUE NO.: 18-11-6dl-A-04 CRITERION: Facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals. (NUREG-0654, F.2., H. 10., K.5.a.b.,

L.I., 4)

CONDITION: Inadequate contamination control: Radiation monitoring of the patient was observed to be improperly performed. Proper frisking distances with the 3

probe were not uniformly maintained, and frisking was performed too rapidly. While caring for the contaminated injured patient in the Hot Zone, the EMT improperly 3

discarded a backboard by pushing the potentially contaminated backboard out of the Hot Zone and into a clean area.

3 POSSIBLE CAUSE: Inadequate training and lack of familiarity with proper frisking 52

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station techniques. Inadequate explanation or misunderstanding of the exercise scenario, whereby the demonstration of Hot Zone and Cold Zone procedures was conducted in an area that the EMTs routinely train in as a Hot Zone only.

REFERENCE:

NUREG-0654/FEMA-REP-1, II.O.4.d and 11.0.5.

EFFECT: Inadequate frisking could miss areas of contamination on the patient's body resulting in the inaccurate detection of radioactive contamination. The potentially contaminated backboard that was pushed out of the Hot Zone could have spread contamination into a clean area.

CORRECTIVE ACTION DEMONSTRATED: The frisking was re-demonstrated utilizing proper frisking techniques. Proper Hot Zone and Cold Zone contamination control procedures were successfully redemonstrated.

c. DEFICIENCY: None
d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f. PRIOR ISSUES - RESOLVED: None
g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.30 Lucas County - Mercy St. Charles Hospital - Medical Service - Facility The Mercy St. Charles Hospital demonstrated the appropriate facilities, equipment, supplies and trained personnel to provide radiological monitoring, urgent medical care, and decontamination to contaminated individuals injured during an incident at the Davis-Besse Nuclear Power Station (DBNPS). Mercy St. Charles Hospital demonstrated redundant communications systems and effective patient management between the Emergency Department and ambulances. The Radiation Emergency Area (REA) was fully stocked with all appropriate personal protective equipment and dosimetry, radiological survey equipment and contamination control supplies.

The Radiation Protection Technicians issued appropriate dosimetry and managed radiological exposure to emergency workers in accordance with the plans and procedures. The Emergency Department and REA staff demonstrated a thorough understanding of radiological contamination control procedures and that life-threatening emergencies always have priority over radioactive contamination concerns.

53

Unclassified Radiological Emergency Preparedness Program (REP)I After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.d.1, 1.e.1,3.a.l,6.d.l1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None 3

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.2.31 Lucas County - Jerusalem Township Fire Department - Dosimetry Control Officer Briefing 3

Lucas County demonstrated the Target Capability of Critical Resource Logistics and Distribution through the establishment of a Dosimetry Distribution Point at the Jerusalem Township Fire Department. The Fire Department Radiological Coordinator demonstrated the proper use of direct-reading and thennoluminescent dosimeters, calibration equipment and communications systems. The Radiological Coordinator conducted a thorough briefing regarding the use of and record keeping requirements for personal dosimetry kits and the proper procedures and 3

documentation related to the use of potassium iodide.

I In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.e.1,3.a.1,3.b.l.

5

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None I

g. PRIOR ISSUES - UNRESOLVED: None I

541

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.3 Support Jurisdictions 3.3.3.1 Erie County - Sandusky High School - Reception Center Erie County successfully demonstrated the Target Capability of Reception Center at the Sandusky High School Reception Center. The Sandusky Fire Department (SFD) and the Erie County Department of Job and Family Services (ECJFS) demonstrated that the reception center/

emergency worker facility had appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 1.e.1,3.a.1,3.b.1,6.a.l.

b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.3.2 Erie County - Sandusky High School - Evacuee Monitoring Erie County successfully demonstrated the Target Capability for monitoring of evacuees. The Sandusky Fire Department successfully demonstrated reception center and worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring and registration of evacuees.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a. MET: 1.d.l,3.a.l,6.a.l.
b. AREAS REQUIRING CORRECTIVE ACTION: None
c.

DEFICIENCY: None

d. PLAN ISSUES: None
e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 55

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 3.3.3.3 Erie County - Sandusky High School - Evacuee Decontamination Erie County successfully demonstrated the Target Capability for decontamination of evacuees.

The Sandusky Fire Department successfully demonstrated reception center and worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring and 3

registration of evacuees In summary, the status of DHS/FEMA criteria for this location is as follows:

i

a.

MET: 1.d.1, 3.a.1, 6.a.1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None i

c.

DEFICIENCY: None

d.

PLAN ISSUES: None 3

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.3.4 Erie County - Sandusky High School - Evacuee Monitoring and Decontamination of i

Vehicles and Equipment Ottawa County successfully demonstrated the Target Capability for monitoring of evacuees. The Sandusky Fire Department successfully demonstrated reception center and worker facility has 3

appropriate space, adequate resources, and trained personnel to provide monitoring and registration for evacuees.

3 In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: l.d.l,3.a.1,6.a.1.

3

b.

AREAS REQUIRING CORRECTIVE ACTION: 6.a.1.

ISSUE NO.: 18-11-6al-A-02 U

CRITERION: Reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, 3

and registration of evacuees and/or emergency workers. (NUREG-0654, J. 1 O.h.,

K.5.b) 3 CONDITION: During the Davis-Besse Nuclear Power Station (DBNPS) 56

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Radiological Preparedness Exercise out-of-sequence demonstration on May 11, 2011, Emergency Workers (EWs) at the Evacuee Vehicle Monitoring and Decontamination Center, located at Sandusky High School, incorrectly read their Ludlum-3 survey meters, which could result in contaminated vehicles being released without proper decontamination. The EWs incorrectly read the background readings on their Ludlum-3 survey meters during initial monitoring as 2,000 counts per minute (cpm) rather than 20 cpm as indicated on the survey meter. In addition, the Controller presented a photograph of a Ludlum-3 survey meter with a reading of 1,600 cpm during initial monitoring, but the EWs were unable to determine the proper reading.

POSSIBLE CAUSE: The EWs did not understand how to interpret the Ludlum-3 survey meter dial readings based on the range setting. This may be due to inadequate training or orientation during the DCO briefing. The DCO briefing included instructions to set the range switch to 0. lx, but did not include detailed instructions on how to interpret the meter dial readings based on the range setting.

REFERENCE:

NUREG-0654, K.5.b EFFECT: The incorrect reading of the survey meter had the potential to allow contaminated vehicles to be declared clean and be released, spreading contamination to persons in contact with the vehicle after its release. The incorrect high background reading of 2,000 cpm would allow the EWs to release vehicles that have greater than 300 cpm above the actual background of 20 cpm to be released. Vehicles with contamination between 320 cpm and 2,020 cpm would be cleared for release instead of being sent to decontamination.

CORRECTIVE ACTION DEMONSTRATED: The Controller provided instructions to the EWs on the Ludlum-3 survey meter settings and the proper way to interpret the readings. The Controller showed them a photograph of a Ludlum-3 survey meter and the EWs successfully determined the scale and correctly determnined the reading that was being presented.

c.

DEFICIENCY: None

d. PLAN ISSUES: None 57

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

e.

NOT DEMONSTRATED: None I

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None 3.3.3.5 Ottawa County - Briar Middle School - Congregate Care Center Ottawa County successfully demonstrated the Target Capability of Congregate Care Center (CCC) at the Briar Middle School. The Fireland Chapter of the American Red Cross (ARC) successfully demonstrated that they had the resources to provide services and accommodations consistent with American Red Cross planning guidelines, and had procedures to assure that evacuees had been monitored for contamination, and had been decontaminated as appropriate prior to entering the congregate care facility.

In summary, the status of DHS/FEMA criteria for this location is as follows:

a.

MET: 6.c. 1.

b.

AREAS REQUIRING CORRECTIVE ACTION: None

c.

DEFICIENCY: None

d.

PLAN ISSUES: None

e.

NOT DEMONSTRATED: None

f.

PRIOR ISSUES - RESOLVED: None

g.

PRIOR ISSUES - UNRESOLVED: None I

I I

I I

I 58 I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station SECTION 4: CONCLUSION No Deficiencies were identified during this exercise for the State of Ohio, Ottawa or Lucas Counties.

No ARCAs were identified during this exercise for the State of Ohio.

One Planning Issue was identified for the State of Ohio, and one Planning Issue from a previous exercise for the State of Ohio was resolved. No Planning Issues were identified for Ottawa or Lucas Counties.

Two ARCAs were identified for Ottawa County and one ARCA was identified for Lucas County during this exercise.

The first ARCA identified for Ottawa County was against Criterion 3.b. 1 - Implementation of KI Decision, whereby the KI tablets with an expired expiration date of May 2007 were not removed from the ODOT Oak Harbor Office when the new KI, with a current expiration date of February 2014, was delivered. The second ARCA identified for Ottawa County was against Criterion 6.a. 1 - Monitoring/Decontamination of Evacuees and Emergency Workers and Registration of Evacuees, whereby, the emergency workers did not understand how to interpret the Ludlum Model 3 Survey Meter readings based on the range selected. Both criteria were successfully re-demonstrated.

The ARCA identified for Lucas County was against Criterion 6.d. 1 - Transportation and Treatment of Contaminated Injured Individuals, whereby the Emergency Medical Services crew failed to properly monitor a potentially contaminated patient and failed to control potentially contaminated equipment. This ARCA was successfully re-demonstrated.

The Planning Issue for the State of Ohio was identified against Criterion 5.a. 1 - Activation of the Prompt Alert and Notification System, whereby the initial message used for alerting and notifying boaters on Lake Erie within the 10-mile Emergency Planning Zone did not specify the governmental organization or official with authority for providing the message, as is required by NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in support of Nuclear Power Plants."

59

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station The Planning Issue from the 2010 Perry REP exercise was identified against Criterion 2.b. 1 -

I Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency, whereby the coordination of functions and timely sharing of information by the Dose Assessment staff in the Lake County Assessment Room and the Field Monitoring Team Coordinators for the State and Lake County were not documented in I

procedures. This issue was resolved in Section 2.3.g. of the March 25, 2011, update to the Field Monitoring Team Coordinator Procedure Number 357 of the Ohio Emergency Operations Center Procedures.

6 I

I I

I I

I I

I I

I 1

60 1

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station APPENDIX A: IMPROVEMENT PLAN I Isu u br 81-a--Cit ISSUE: The initial message used for alerting and notifying boaters within Lake Erie and within the EPZ does not specify the governmental organization nor the official with authority for providing the message as required by FEMA.

RECOMMENDATION: Revise the pre-scripted message in the ODNR checklist to specify the governmental organization and the official with authority for providing the message as required by FEMA.

CORRECTIVE ACTION DESCRIPTION: The responsible agency and official have been identified and the messages and plan will be revised as needed to reflect this change before the 2012 Beaver Valley Nuclear Power Station.

CAPABILITY:

PRIMARY RESPONSIBLE AGENCY:

Emergency Public Information and Warning Ohio Emergency Management Agency CAPABILITY ELEMENT:

START DATE:

Planning 2011-05-11 AGENCY POC:

ESTIMATED COMPLETION DATE:

Nancy Dragani 614-889-7150 2012-06-19 61

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station APPENDIX B: EXERCISE TIMELINE I

Table 1, on the following page, presents the time at which key events and activities occurred I

during the Davis-Besse Nuclear Power Station REP Partial Participation Plume Exposure Pathway Exercise held on May 10, 2011. Also included are times that notifications were made to I

the participating jurisdictions/functional entities.

I I

I I

I I

I I

I I

I I

I 62 I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Table 1 - Exercise Timeline DATE: 2011-05-10, SITE: Davis-Besse Nuclear Power Station, OH Emergency Classification Level or Event 0

'z CUU 1-00 0

.3-Unusual Event NA NA N/A N/A N/A N/A Alert 0819 NA 0829 0934 0829 0829 Site Area Emergency 1002 1020 1015 1038 1015 1015 General Emergency 1147 1207 1202 1229 1202 1202 Simulated Rad. Release Started 1147 1207 1202 1229 1202 1202 Simulated Rad. Release 1437 NA 1440 N/A N/A N/A Facilit Declared 0perational 0930 0933 0926 0902 0915 Declaration of State and Local Emergency 1050 N/A 1050 1041 1021 Exercise Terminated 1440 1440 1447 1438 1438 Early Precautionary AR: Relocate School N/A 1016 1037 1016 1016 Early Precautionary AR: Restrict Boating Traffic N/A 0945 1037 1031 1016 Early Precautionary AR: Restrict Air Traffic N/A 1022 1037 N/A N/A.

Early Precautionary AR: Restrict Rail Traffic N/A 1021 1037 N/A N/A Early Precautionary AR: Close Parks N/A 0945 1037 1031 1016 Early Precautionar AR: Livestock Advisor N/A 1016 1055 1032 1032 General Informational Message 1026 N/A 1037 1031 1031 1 st Siren Activation (for GI Message)

N/A N/A N/A 1038 1038 1 st EAS Message (for GI Message)

N/A N/A 1041 1041 1041 1 st Protective Action Recommendation:

1210 N/A N/A N/A N/A Evacuate Sub-Areas 1, 2, 10, 12. EW Turn-back Values: Remain the same inside 10-mile EPZ; Remain at 5R outside 10-mile EPZ..

1 st Protective Action Decision: Evacuate Sub-1215 N/A 1230 1215 1215 Areas 1, 2, 10, 12. EW Turn-back Values:

Remain the same inside 1 0-mile EPZ; Remain at 51R outside 10-mile EPZ.

2nd Siren Activation (for 1 st PAD)

N/A N/A N/A 1220 1220 2nd EAS Message (for 1 st PAD)

N/A N/A 1230 1223 1223 2nd Protective Action Recommendation:

1257 N/A N/A N/A N/A Evacuate Sub-Areas 1, 2, 10,12. EW Tu,:back Values: 5R to 3R. 2Rto IR; IR to IR.

2nd Protective Action Decision: Evacuate Sub-1309 N/A N/A 1309 1309 Areas 1, 2, 10, 12. EW Turn-back Values: SR to 3R; 2R to IR; lR to IR.

Siren Activation (Not Applicable for EWs)

NA N/A N/A N/A N/A EAS Message (Not Applicable for EWs)

NA I

N/A N/A N/A I

N/A 3rd Protective Action Recommendation:

1334 N/A N/A N/A N/A Evacuate Sub-Areas 1,2,3, 10, 11. 12. EW Turn-back Values: SR to 3R, 2R to I R; I R to I R.

3rd Protective Action Decision: Evacuate Sub-1339 N/A N/A 1339 1339 Areas 1, 2, 3, 10, 11, 12. EW Turn-back Values:

5Rto3R;2Rto 1R. IRto IR.

U3rd Siren Activation (for 3rd PAD)

N/A N/A N/A 1345 134 63

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station I

After Action Report/Improvement Plan Table 1 - Exercise Timeline DATE: 2011-05-10, SITE: Davis-Besse Nuclear Power Station, OH Emergency Classification Level or Event

  • 0 00 0

0 3rd EAS Message (for 3rd PAD)

N/A N/A 1357 1348 1348 1lst KJ Administration Recommendation (EWs, 1210 1205 1216 1215 1215 Institutionalized Persons & General Public): Sub-Areas 1.2, 10, 12.

2nd KI Administration Recommendation (EWs, 1334 1329 1239 1340 1339 Institutionalized Persons, &General public): Sub-Areas 1,2,3. 10, 11, 12.

I I

U I

I I

64 I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station APPENDIX C: EXERCISE EVALUATORS AND TEAM LEADERS The following is a list of the personnel that evaluated the Davis-Besse Nuclear Power Station REP Partial Participation Plume Exposure Pathway Exercise on May 10, 2011. The list includes the evaluation team leadership and all evaluators. The organization which each evaluator represents is indicated by the following abbreviations:

DHS/FEMA Department of Homeland Security/Federal Emergency Management Agency ICF ICF International Consulting Name Title Organization Radiological Assistance Committee, Chairman William E. King DHS/FEMA Exercise Director Stephen Tulley DHS/FEMA Senior Specialist Gary Naskrent DHS/FEMA Site Specialist Carolyn Sturghill DHS/FEMA Team Leader - State of Ohio Carl Bebrich DHS/FEMA Team Leader - Ottawa County Ed Diaz DHS/FEMA Team Leader - Lucas County Karl Rabenhorst DHS/FEMA 65

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station After Action Report/Improvement Plan DATE: 2011-05-10, SITE: Davis-Besse Nuclear Power Station, OH LOCATION EVALUATOR AGENCY State of Ohio - Initial Notification Point Debra Schneck ICFI State of Ohio - Emergency Operations Center - Executive Room Debra Schneck ICFI Bruce Swiren ICFI State of Ohio - Emergency Operations Center - Assessment Room Michael Howe FEMA - HQ Debra Schneck ICFI State of Ohio - Emergency Operations Center - Joint Information Debra Schneck ICFI Center State of Ohio - Davis-Besse Nuclear Power Station - Joint Information Paul Nied ICFI Center John Simpson FEMA R5 State of Ohio - Emergency Operations Facility Richard Grundstrom ICFI State of Ohio - Ottawa County Emergency Operations Center - State Carolyn Sturghill DHS/FEMA Analysis State of Ohio - Department of Natural Resources - Route Alerting Richard Grundstrom ICFI Ottawa County - Initial Notification Point James King FEMA R5 Ottawa County - Emergency Operations Center Kerris Bates DHS/FEMA James King FEMA R5 Roy Smith ICFI Carolyn Sturghill DHS/FEMA Ottawa County - Joint Information Center - Liaison John Simpson FEMA R5 Ottawa County - Ohio Department of Transportation - Traffic Control James Groves ICF Point/Access Control Point - Dosimetry Control Officer Briefing Ottawa County - Ohio Department of Transportation - Traffic Control James Groves ICF Point/Access Control Point Ottawa County - Oak Harbor Police Department - Traffic Control Kaori Flores FEMA - HQ Point/Access Control Point - Dosimetry Control Officer Briefing Ottawa County - Oak Harbor Police Department - Traffic Control Kaori Flores FEMA - HQ Point/Access Control Point Ottawa County - Port Clinton City School District - Evacuation School Henry Christiansen ICFI Ottawa County - Danbury Local Schools - Evacuation School Richard McPeak ICFI Ottawa County - Edgewood Manor Nursing Center - Special Christopher Bellone FEMA R5 Population Ottawa County - Allen-Clay Joint Fire District - Dosimetry Control Kerris Bates DHS/FEMA Officer Briefing Ottawa County - Allen-Clay Joint Fire District - Route Alerting and Kerris Bates DHS/FEMA Verification Paul Nied ICFI Ottawa County - Erie Township Fire Department - Dosimetry Control Meg Swearingen ICFI Officer Briefing Ottawa County - Erie Township Fire Department - Backup Route Christopher Bellone FEMA R5 Alerting Ottawa County-Erie Twp Fire Department - Route Alerting and Meg Swearingen ICFI Verification Ottawa County - Rocky Ridge Fire Department - Dosimetry Control Todd Gemskie FEMA Officer Briefing Ottawa County - Rocky Ridge Fire Department - Route Alerting and Todd Gemskie FEMA Verification John Simpson FEMA R5 Ottawa County - Port Clinton Fire Department - Dosimetry Control Henry Christiansen ICFI Officer Briefing Ottawa County - Port Clinton Fire Department - Emergency Worker Henry Christiansen ICFI Monitoring and Decontamination 66

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Ottawa County - Port Clinton Fire Department - Emergency Worker Deborah Fulk FEMA Region Monitoring and Decontamination of Equipment and Vehicles 5

Ottawa County - Perkins High School - Congregate Care Center James Groves ICF Lucas County - Initial Notification Point Deborah Fulk FEMA Region 5

Lucas County - Emergency Operations Center Clinton Crackel FEMA Region Deborah Fulk 5

Todd Gemskie FEMA Region William Vocke 5

FEMA ICFI Lucas County - Joint Information Center - Liaison John Simpson FEMA R5 Lucas County - Oregon District Transportation - Special Population Meg Swearingen ICFI Lucas County - Sheriffs Road Patrol & Dosimetry Coordinator -

Delwyn Kinsley FEMA Traffic Control Point/Access Control Point - Dosimetry Control Officer Briefing Lucas County - Sheriffs Road Patrol & Dosimetry Coordinator -

Kara Scott FEMA R5 Traffic Control Point/Access Control Point Lucas County - Jerusalem Township Fire Department - Backup Route James King FEMA R5 Alerting and Verification Kara Scott FEMA R5 Lucas County - Jerusalem Township Fire Department - Medical Clinton Crackel FEMA Region Service - Transportation 5

Lucas County - Mercy St. Charles Hospital - Medical Service -

Delwyn Kinsley FEMA Facility Lucas County - Jerusalem Township Fire Department - Dosimetry Kara Scott FEMA R5 Control Officer Briefing Erie County - Sandusky High School - Reception Center Richard McPeak ICFI Erie County - Sandusky High School - Evacuee Monitoring Roy Smith ICFI Erie County - Sandusky High School - Evacuee Decontamination Delwyn Kinsley FEMA Erie County - Sandusky High School - Evacuee Monitoring and William Vocke ICFI Decontamination of Vehicles and Equipment Ottawa County - Briar Middle School - Congregate Care Center James Groves ICF

  • Team Leader 67

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station I

After Action Report/Improvement Plan APPENDIX D: ACRONYMS AND ABBREVIATIONS ANI American Nuclear Insurers ARC American Red Cross ARCA Area Requiring Corrective Actions ARES Amateur Radio Emergency Services CAD Computer Aided Dispatch CCC Congregate Care Center CERT Community Emergency Response Team DBNPS Davis-Besse Nuclear Power Station DC Dosimtery Coordinator DCO Dosimetry Control Officer DRD Direct Reading Dosimeter EAS Emergency Alert System ECHD Erie County Health Department ECL Emergency Classification Level ED Executive Director EDL Executive Decision Line EMA Emergency Management Agency EMD Emergency Management Director EMR Equipment Monitoring Record EMS Emergency Medical Service EOC Emergency Operations Center EOF Emergency Operations Facility EPZ Emergency Planning Zone ER Emergency Room ERDS Emergency Response Data System EW Emergency Workers FAA Federal Aviation Administration FEMA Federal Emergency Management Agency FENOC First Energy Nuclear Operating Company FFD Freemont Fire Department GE General Emergency GIS Global Information System HP Health Physicist IWP Initial Warning Point I

I I

I I

I I

I I

1 I

I I

I I

I I

68

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station JFD Jerusalem Fire Department JIC Joint Information Center JTE Jerusalem Township Elementary JTFD Jerusalem Township Fire Department LCD Lucas County Dosimetry LEADS Law Enforcement Agencies Data System MARCS Multi Agency Radio Communication System MDT Mobile Data Tenninal NDS Nuclear Data System NRC Nuclear Regulatory Commission NRP National Response Plan OCHD Ottawa County Health Department OCTA Ottawa County Transit Authority OEMA Ohio Emergency Management Agency OFD Oregon Fire Department OHPD Oak Harbor Police Department ORO Offsite Response Organizations OSHP Ohio State Highway Patrol PAD Protective Action Decision PAG Protective Action Guides PAR Protective Action Recommendation PCFD Port Clinton Fire Department PIL Public Information Liaison PIO Public Information Officers PNS Prompt Notification System PPE Personal Protective Equipment RA Resident Analyst RAC Regional Assistance Committee REA Radiological Emergency Area REP Radiological Emergency Preparedness RERP Radiological Emergency Response Plan RO Radiological Officer RPT Radiation Protection Technician SAE Site Area Emergency SEG State Executive Group SEOC State Emergency Operations Center SFD Sandusky Fire Department SOG Standard Operating Guidelines SOP Standard Operating Procedures SR State Route 69

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station TCP Traffic Control Posts

I I

I I

I I

I I

I I

I I

I I

I I

I I

70

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station APPENDIX E: EXERCISE PLAN This Appendix lists the exercise criteria that were scheduled for demonstration in the Davis-Besse Nuclear Power Station Radiological Emergency Preparedness Partial Participation Plume Exposure Pathway Exercise on May 10, 2011, and the offsite extent-of-play agreement accepted by DHS/FEMA Region V on April 28, 2011. The exercise criteria, contained in FEMA "Radiological Emergency Preparedness Exercise Evaluation Methodology; Notice," as published in the Federal Register Notice/Vol. 67, dated April 25, 2002, represent a functional translation of the planning standards and evaluation criteria of NUREG-0654/FEMA-REP-1, Rev. 1, "Criteria for the Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," November 1980. Because the exercise criteria are intended for use at all nuclear power plants sites, and because of variations among offsite plans and procedures, an extent-of-play agreement is prepared by the State and accepted by DHS/FEMA to provide evaluators with guidance on expected actual demonstration of the criteria.

71

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station DAVIS-BESSE NUCLEAR POWER STATION PARTIAL PARTICIPATION EXERCISE EXTENT OF PLAY AGREEMENT State of Ohio MAY 10, 2011 72

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criteria that can be re-demonstrated immediately for credit, at the decision of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.l. Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a.1, 2.b.1, 2.b.2, 5.a.1 and 5.b.1.

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Criterion 1.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

Extent of Play The Ohio Emergency Management Agency will receive the initial notification via the 24-hour number located in the Ohio State Highway Patrol Dispatch Center. The Ohio Emergency Management Agency will activate appropriate portions of the State Emergency Operations Center. Once the SEOC Assessment Room is activated all dedicated phone communications will be received there. The State will mobilize all the agencies that have responsibilities in the SEOC, primarily the Executive Room, Dose Assessment, State Joint Information Center (JIC); the county EOC's; and the DBNPS JIC and Emergency Operations Facility (EOF). The state representatives assigned to the DBNPS JIC and EOF, and the county EOC's will be pre-positioned within approximately 20 minutes after the declaration of the Alert.

Criterion 1.b.l: Facilities are sufficient to support the emergency response.

Extent of Play The baseline exercise for demonstration of this criterion was conducted in April 2002.

Criterion 1.c.l: Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.

Extent of Play Direction and control of state activities will be demonstrated at the SEOC. The Executive Director of Ohio EMA will be positioned in the SEOC Executive Room and will coordinate decisions on behalf of the Governor's office. The Ohio Department of Health is responsible for determining the State PAR in the SEOC Assessment Room and will provide periodic briefings to the SEOC Executive Room.

Criterion 1.d.1: At least two communication systems are available and operate properly and communication links are established and maintained with appropriate locations. Communication capabilities are managed in support of emergency operations.

5y3

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Extent of Play U

The primary means of communications between the State EOC and the County EOCs, DBNPS JIC and EOF is by commercial and/or dedicated telephone. Backup communications (radio and/or cellular phones) will be demonstrated.

Criterion 1.e.1: Equipment, maps, displays, dosimetry, potassium iodide (KI) and other supplies are sufficient to support emergency operations.

Extent of Play The state will demonstrate the use of equipment, maps and displays to support emergency I

operations. The maps traditionally used in the EOC will be available and used for exercise evaluation purposes.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Criterion 2.a.l: OROs use a decision-making process,.considering relevant factors and I

appropriate coordination, to insure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

Extent of Play 3

The SEOC Assessment Room staff will consider PAGs and Administrative Limits to develop recommendations, including KI, based on their technical evaluation of the available data. Recommendations will be forwarded to the SEOC Executive group and subsequently to the Ottawa and Lucas County EOC's. County EOC's will disseminate recommendations to their emergency workers. Field monitoring data will be provided to the SEOC Assessment Room via controller injects.

Criterion 2.b.l: Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data and licensee and ORO dose projections, as I

well as knowledge of on-site and off-site environmental conditions.

Extent of Play N

The SEOC Assessment Room will evaluate the licensee information and complete 3

independent dose projections based on that information and controller injected (simulated) field-monitoring data. Assessment Room staff will evaluate the data and forward protective action recommendations to the SEOC Executive Room. Approved I

recommendations will then be forwarded to the Ottawa and Lucas County EOCs via a dedicated conference line established in the Assessment Room.

74

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criterion 2.b.2: A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).

Extent of Play The Governor or his designee will demonstrate the ability to make appropriate protective action recommendations based on technical information from the SEOC Assessment Room. Recommendations concerning the use of KI for the general public and emergency workers and institutionalized are the responsibility of the Ohio Department of Health.

They are made in the SEOC Assessment Room in compliance with the ODH KI policy and will accompany the protective action recommendation.

Coordination will take place in the SEOC Executive Room with Ottawa and Lucas Counties to ensure consideration of local needs. After the decision is made, counties will disseminate protective actions to the general public.

At least two (2) Protective Action Decisions will be demonstrated.

Criterion 2.c.1: Protective action decisions are made, as appropriate, for special population groups.

Extent of Play The recommendation to take KI is developed by the Ohio Department of Health in the SEOC Assessment Room and accompanies the PAR. Upon approval in the SEOC Executive Room, it is then forwarded to Ottawa and Lucas Counties for implementation.

See Ottawa and Lucas counties extent-of-play agreements.

Criterion 2.d.l: Radiological consequences for the ingestion pathway are assessed and appropriate protective action decisions are made based on the ORO planning criteria.

Extent of Play The State demonstrated this criterion at the June 2006 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

Criterion 2.e.l: Timely re-location, re-entry and return decisions are made and coordinated as appropriate, based on assessments of the radiological conditions and criteria in the ORO's plan and/or procedures.

Extent of Play The State demonstrated this criterion at the June 2006 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

75

Unclassified Radiological Emergency Preparedness Progi-ani (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station EVALUATION AREA 3 - PROTECTIVE ACTION IMPLEMENTATION Criterion 3.a.l: The OROs issue appropriate dosimetry and procedures and manage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency I

workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.

Extent of Play The State Field Monitoring Teams (FMT's), and Sample Screening Point will not be i

demonstrated this exercise. The State demonstrated this criterion at the April 2010 Beaver Valley Power Station exercise. It will be demonstrated again at the October 2012 Perry Nuclear Power Plant exercise. Implementation will be demonstrated by county responders.

Implementation will be demonstrated for State personnel responding to the EOF.

1 Criterion 3.b.l: KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals (not the general public) is maintained.

Extent of Play The State Field Monitoring Teams (FMT's), and Sample Screening Point will not be demonstrated this exercise. The State demonstrated this criterion at the April 2010 Beaver Valley Power Station exercise. It will be demonstrated again at the October 2012 Perry Nuclear Power Plant exercise. Implementation will be demonstrated by county responders.

Implementation will be demonstrated for State personnel responding to the EOF.

No KI will be ingested.

Criterion 3.c.1: Protective action decisions are implemented for special population groups within areas subject to protective actions.m Extent of Play 3

N/A - This is a county function.

Criterion 3.c.2: OROs/school officials decide upon and implement protective actions for schools.

Extent of Play 76 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station N/A - This is a county function.

Criterion 3.d.l: Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Extent of Play The SEOC Dose Assessment Room in coordination with the SEOC Executive group will procedurally demonstrate restricting air, water and rail traffic within the Emergency Planning Zone. The actual restriction of air, water and rail will be simulated.

Criterion 3.d.2: Impediments to evacuation are identified and resolved.

Extent of Play N/A - This is a county function.

Criterion 3.e.l: The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.

Extent of Play The State demonstrated this criterion at the June 2006 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

Criterion 3.e.2: Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk and agricultural production.

Extent of Play The State demonstrated this criterion at the June 2006 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

Criterion 3.f.l: Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

Extent of Play The State demonstrated this criterion at the June 2006 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

77

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station EVALUATION AREA 4 - FIELD MEASUREMENT AND ANALYSIS Criterion 4.a.l: The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.

Extent of Play The State Field Monitoring Teams (FMT's), and Sample Screening Point will not be demonstrated this exercise. The State demonstrated this criterion at the April 2010 Beaver Valley Power Station exercise. It will be demonstrated again at the October I

2012 Perry Nuclear Power Plant exercise.

Criterion 4.a.2: Field teams are managed to obtain sufficient information to help characterize 1.

the release and to control radiation exposure.

Extent of Play I

The State Field Monitoring Teams (FMT's), and Sample Screening Point will not be demonstrated this exercise. The State demonstrated this criterion at the April, 2010 Beaver Valley Exercise. It will be demonstrated again at the October 2012 Perry Nuclear Power Plant exercise.

Note: The State received a Deficiency for this criterion that was successfully redemonstrated on July 22, 2010.

3 Criterion 4.a.3: Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an 3

appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media.

Extent of Play The State Field Monitoring Teams (FMT's), and Sample Screening Point will not be i

demonstrated this exercise. The State demonstrated this criterion at the April, 2010 Beaver Valley Power Station exercise. It will be demonstrated again at the October 2012 Perry Nuclear Power Plant exercise.

Note: the State received an ARCA for this criterion that was successfully redemonstrated on July 22, 2010.

Criterion 4.b.l: The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (e.g., food crops, milk, water, vegetation, and soil) to support I

adequate assessments and protective action decision-making.

78 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Extent of Play The State demonstrated this criterion at the June 200.6 BVPS exercise. It will be demonstrated again at the June 2012 PNPP exercise.

Criterion 4.c.l: The laboratory is capable of performing required radiological analyses to support protective action decisions.

Extent of Play The State demonstrated this criterion at the October 2006 PNPP exercise. It will be demonstrated again at the June 2012 PNPP exercise.

EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Criterion 5.a.l: Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized off-site emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include:

1. Identification of the state or local government organization and the official with the authority for providing the alert signal and instructional message
2. Identification of the commercial nuclear power plant and a statement that an emergency situation exists at the plant
3. Reference to REP-specific emergency information (e.g., brochures and information in telephone books) for use by the general public during an emergency
4. A closing statement asking the affected and potentially affected population to stay tuned for additional information.

Extent of Play The State will consult with the county EOCs in the Executive Room to determine the best immediate protective action for the populace. Once a decision is reached that requires the activation of the alert and notification system, Ottawa County will simulate the activation of the sirens. EAS messages will be prepared by Ottawa County EMA who will provide them to the EAS Station. (See the Ottawa County Extent of Play Agreement for further details.)

The State also notifies the public on Lake Erie (within the 10-mile EPZ) through the US Coast Guard as supported by Ohio Department of Natural Resources (ODNR).

The demonstration will be conducted by interview only with ODNR at 1:00 pm on Wednesday, May 11 at the ODNR Division of Watercraft offices in Sandusky, Ohio.

79

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criterion 5.a.2: [RESERVED]

Criterion 5.a.3: Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system.

I Extent of Play N/A - This is a county function.

Criterion 5.b.l: OROs provide accurate emergency information and instructions to the public and the news media in a timely manner.

Extent of Play The State PIO and a representative from the Ohio Department of Health will be present at the DBNPS JIC to address protective actions being implemented and the activities taking place at the State and county level. Public information representatives from Ohio EMA will be present in the SEOC JIC to communicate with the DBNPS JIC.

A Public Inquiry telephone will be established and demonstrated at the SEOC JIC and driven by controller injects. Public Inquiry will address at least 3 calls per hour once Site Area Emergency is declared for two (2) hours. Trends in rumors will be identified and responded to as needed.

EVALUATION AREA 6 - SUPPORT OPERATION/FACILITIES i

Criterion 6.a.l: The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

Extent of Play i

N/A - This is a county function.

Criterion 6.b.l: The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment including vehicles.

Extent of Play N/A - This is a county function.

80

]

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criterion 6.c.1: Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate prior to entering congregate care facilities.

Extent of Play N/A - This is a county function.

Criterion 6.d.l: The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

Extent of Play N/A - This is a county function.

81

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station OTTAWA COUNTY 2011 RADIOLOGICAL PREPAREDNESS EXERCISE EXTENT OF PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, by a decision of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.1.

Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a.1, 2.b.1, 2.b.2, 5.a.1 and 5.b.l.

3 EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Sub-Element L.a - Mobilization i

Criterion L.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

Extent of Play:

All agencies identified in the Ottawa County Radiological Emergency Response Plan (RERP) will be alerted as per established procedures. The primary means of notification from Davis-3 Besse Nuclear Power Station is a dedicated line; therefore, a verification call will not be performed. If a back-up means of communication (commercial phone or 800 MHz radio) is necessary, a verification call will be made. Appropriate personnel shall be mobilized in accordance with the RERP to staff emergency facilities. The Sheriff's Dispatcher and Ottawa County EMA personnel will notify the emergency response agencies/individuals.

Individuals/agencies to be notified will vary according to the level of emergency.

Agencies/individuals will be contacted by radio, pager or telephone and will verify the accurate receipt of the notification message by either reading it back or calling the Sheriff's Dispatch Center (or EOC, if activated) depending upon how the individual was notified. Following I

verification, the designated individual will notify appropriate personnel within the agency by using normal internal notification guidelines. Personnel will be informed of the Plant's status so that each agency with response roles at specific levels in the emergency can take appropriate I

actions as specified in the plan. Individual agencies rely on telephone and/or radio.to contact their personnel according to a predetermined priority call list.

The County EMA Director shall be responsible for EOC activation and operation. The EOC will not normally be activated for an UNUSUAL EVENT. It may be activated for an ALERT at the discretion of the EMA Director. The EOC staff will be fully mobilized at a SITE AREA EMERGENCY or GENERAL EMERGENCY.

The following field activities/facilities will be driven by controller injects and demonstrated i

out of sequence:

I Route Verification/ Supplemental Route Alerting Allen-Clay Joint Fire District Station 1 82 82

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Rocky Ridge Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Erie Township Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Backup Route Alerting Allen-Clay Joint Fire District Station 1 Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Rocky Ridge Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Erie Township Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Traffic/Access Control Ohio Department of Transportation Tuesday, May 10, 2011 - 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> Oak Harbor Police Department Tuesday, May 10, 2011 - 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Emergency Worker Monitoring/Decontamination Port Clinton Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Schools Port Clinton City School District Tuesday, May 10, 2011 - 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> Danbury Local School District Tuesday, May 10, 2011 - 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br /> Reception Center 0

Sandusky High School Wednesday, May 11, 2011 Care Center 9

Perkins High School Wednesday, May 11, 2011

- 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />

- 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Institutionalized/Special Populations 83

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station I

After Action Report/Improvement Plan Edgewood Manor Nursing Center Tuesday, May 10, 2011 - 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> Sub-Element 1.b - Facilities Criterion 1.b.1 Facilities are sufficient to support the emergency response.

Extent of Play:

N/A.

Baseline established in 2005.

Sub-Element 1.c - Direction and Control Criterion 1.c.1:

Key personnel with leadership roles for the ORO provide direction and control to that part of the overall response effort for which they are responsible.

Extent of Play:

Direction and Control will be demonstrated by appropriate participating agencies in accordance with RERP and SOGs.

Sub-Element 1.d - Communications Equipment Criterion 1.d.1:

At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.

Extent of Play:

All communications equipment at the locations listed in Criterion L.a. 1 will be demonstrated.

Commercial telephone is used as the primary means of communications between the Utility, Local, County, State and Federal agencies. The initial notification call informing County officials of an emergency at DBNPS is made on a 4-Way dedicated telephone line that connects Davis-Besse, State of Ohio, Ottawa County and Lucas County. Upon activation of the County EOC, the 4-way dedicated (conference style) telephone hook-up will connect the Davis-Besse Emergency Operating Facility (EOF), the Ottawa County EOC, Lucas County EOC and the Ohio EOC. A facsimile machine will support verbal communications, as well as plant status and radiological dose assessment updates. This system may remain open and operational until the incident is terminated by the appropriate authority.

84 I

I I

I I

I I

I I

I I

I U

I I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station In addition, a 3-way conference line will connect Ottawa and Lucas County Commissioners and the Governor's Representative and will be used to coordinate protective action recommendations and activation of the siren system and EAS.

Once notification has been made and communication links are established, a telephone/radio network will be used to expedite agency communications.

Radio/backup communication will be available for demonstration by the following entities at the EOC:

  • Amateur Radio Emergency Service
  • Fire/EMS Liaison
  • Ohio Emergency Management Agency
  • Ohio State Highway Patrol
  • Ottawa County Schools' Liaison
  • Ottawa County Sheriffs Dispatch Sub-Element i.e - Equipment and Supplies to Support Operations Criterion 1.e.l:

Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations.

Extent of Play:

All equipment, displays, supplies, etc. at the locations listed in Criterion L.a. 1 will be demonstrated.

Sufficient quantities of direct-reading and permanent record dosimetry and dosimeter chargers are available for issuance to emergency workers. Dosimetry and KI have been pre-distributed to ORO's (see 3.a. 1 and 3.b.1). Available supplies of KI will be within the expiration date indicated on KI bottles or blister packs.

Monitoring kits and Dosimetry are exchanged annually; the documentation is included in the 2011 Annual Letter of Certification.

The Ohio Department of Health (ODH) (through local health departments) makes KI available to the general public by pre-distribution and distribution at reception centers. EOC Liaisons for the Ohio Department of Transportation, Ottawa County Engineer and Ottawa County Sheriff will discuss equipment and supplies to support Traffic and Access Control.

EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING 85

Unclassifled Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station I

After Action Report/Inprovement Plan Sub-Element 2.a - Emergency Worker Exposure Control Criterion 2.a.1:

OROs use a decision-making process, considering relevant factors and appropriate coordination, to insure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative limits or protective action guides.

Extent of Play:

The Ottawa County Radiological Officer (RO) will coordinate with dosimetry coordinators to monitor exposure of county emergency workers. Each emergency worker will wear assigned dosimetry devices* at all times when performing personnel or equipment contamination monitoring and decontamination, when handling radioactive material, and whenever an individual is in the EPZ during a SITE AREA EMERGENCY or GENERAL EMERGENCY.

Individuals will be instructed to read their direct-reading dosimetry every thirty minutes or more frequently after the onset of a GENERAL EMERGENCY.

Should the scenario dictate a revised exposure limit, the message will be disseminated to dosimetry coordinators by the RO.

Controller inject will initiate the discussions about the process for exceeding exposure limits.

Provisions to authorize radiation exposure in excess of administrative limits or PAGs will be discussed. Discussion will be driven by controller inject.

Advisories from the EOC to field personnel will be simulated due to out of sequence play.

The Ohio Department of Health recommends the use of KI. Dosimetry packets have been pre-distributed to emergency response organizations.

0 Area dosimetry will be utilized (in lieu of individual dosimetry) at the Edgewood Manor Nursing Center and the Ottawa County EOC.

Sub-Element 2.b - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency.

I I

I I

I I

I I

I I

I I

I I

I I

Criterion 2.b.1:

Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of on-site and off-site environmental conditions.

Extent of Play:

86

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station N/A - Ottawa County does not demonstrate this criterion; it relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Criterion 2.b.2:

A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).

Extent of Play:

Protective action decisions (PADs) will be made in accordance with the RERP and SOGs. The Ottawa County Commissioners are responsible for the recommendation and implementation of protective measures for the affected public and emergency workers in Ottawa County. They will reach their decisions by weighing information, data and protective action recommendations from the State, Utility, Federal and local sources. When a protective action has been recommended by either the Davis-Besse Nuclear Power Station (DBNPS) or the State of Ohio, the Ottawa County Commissioners will consult with the Ottawa County Executive Group and the Lucas County Commissioners to decide upon a coordinated protective action, the time when the sirens will be activated, an Emergency Alert System (EAS) message and Special News Broadcasts (SNBs).

The decision to advise the general public to take KI will be based upon the recommendation of ODH.

The county will demonstrate the capability to communicate the contents of PADs with affected jurisdictions. The number of PADs will be dependent on the scenario, however, at least two (2) will be demonstrated.

Sub-Element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations Criterion 2.c.1:

Protective action decisions are made, as appropriate, for special population groups.

Extent of Play:

A list of people with special needs (mobility impaired, hearing impaired, etc.) is maintained by the Ottawa County Health Department, in coordination with the Ottawa County EMA and local fire departments, for use in an emergency.

A special needs list shall be printed by the Health Department, however, due to confidentiality concerns, simulated lists will be provided to appropriate fire departments.

Appropriate protective actions for institutionalized/special needs shall be demonstrated at the Edgewood Manor Nursing Center at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, Tuesday, May 10, 2011.

87

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Sub-Element 2.d - Radiological Assessment and Decision Making for the Ingestion Exposure Pathway Criterion 2.d.1:

Radiological consequences for the ingestion pathway are assessed and appropriate protective action decisions are made based on the ORO planning criteria.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio.

Sub-Element 2.e - Radiological Assessment and Decision Making Concerning Relocation, Re-entry and Return Criterion 2.e.l:

Timely re-location, re-entry, and return decisions are made and coordinated as appropriate, based on assessments of radiological conditions and criteria in the OROs plan and/or procedures.

Extent of Play:

Criterion not selected. Successfully demonstrated in May, 2007.

EVALUATION AREA 3 - PROTECTIVE ACTION IMPLEMENTATION Sub-Element 3.a - Implementation of Emergency Worker Exposure Control I

I I

I I

I I

I I

I I

I I

I I

I Criterion 3.a.1:

The OROs issue appropriate dosimetry and procedures and manage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.

Extent of Play:

The Ottawa County Radiological Officer will coordinate with dosimetry coordinators to monitor exposure of county emergency workers. Each emergency worker will wear assigned dosimetry devices at all times when performing personnel or equipment contamination monitoring and decontamination, when handling radioactive material, and whenever an individual is in the EPZ during a SITE AREA EMERGENCY or GENERAL EMERGENCY. Individuals will be instructed to read their direct-reading dosimetry every thirty minutes or more frequently after the onset of a GENERAL EMERGENCY. Should the scenario dictate a revised exposure limit, the message will be disseminated to dosimetry coordinators by the RO.

88

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station Advisories from the EOC to field personnel will be simulated via controller inject due to out of sequence play.

Dosimetry packets have been pre-distributed to emergency response organizations.

Criterion 3.a. 1 will be demonstrated by appropriate agencies/ personnel in conjunction with their RERP assignments.

  • Allen-Clay Joint Fire District, Station #1
  • Danbury Local School District
  • Edgewood Manor Nursing Center
  • Erie Township Fire Department
  • Oak Harbor Police Department
  • Ohio Department of Transportation
  • Ottawa County Radiological Officer
  • Port Clinton City Schools
  • Port Clinton Fire Department
  • Rocky Ridge Fire Department
  • Sandusky Fire Department Sub-Element 3.b - Implementation of KI Decision Criterion 3.b.l:

KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained.

Extent of Play:

In accordance with the RERP and SOGs, potassium iodide (KI) is supplied by the Ohio Department of Health to the Ohio EMA for pre-distribution to offsite response organizations.

The Ohio EMA provides a full dose complement of KI tablets for each dosimetry packet of emergency workers with potential to enter the EPZ, thus allowing emergency workers to begin use promptly and voluntarily upon recommendation from the Ohio Department of Health.

Should the Ohio Department of Health recommend the taking of KI for emergency workers, the County Radiological Officer will coordinate with local agency dosimetry coordinators to implement such a recommendation. KI WILL NOT BE INGESTED. Issuance of KI to institutionalized individuals is based upon the recommendation of the Ohio Department of Health and implemented at the County and local level. The Special Needs Communicator will notify institutional facilities, as needed, and recommend that the appropriate designee for each applicable facility administer KI to institutionalized persons. Actual administration is under the direction of the attending physician. KI WILL NOT BE INGESTED.

89

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station The Ohio Department of Health (ODH) (through local health departments) makes KI available to the general public by pre-distribution and by distribution at reception centers. The decision to advise the general public to take KI will be based upon the recommendation of ODH.

Agencies/Individuals will demonstrate Criterion 3.b. 1 in conjunction with their RERP assignments. Those available for evaluator interviews will include:

  • Allen-Clay Joint Fire District, Station #1
  • Danbury Local School District
  • Edgewood Manor Nursing Center I
  • Erie Township Fire Department
  • Oak Harbor Police Department
  • Ohio Department of Transportation
  • Ottawa County Radiological Officer
  • Port Clinton City Schools
  • Rocky Ridge Fire Department Sub-Element 3.c - Implementation of Protective Actions for Special Populations Criterion 3.c.1:

Protective action decisions are implemented for special populations, other than schools, within areas subject to protective actions.

I Extent of Play:

A list of people with special needs (mobility impaired, hearing impaired, etc.) is maintained by the Ottawa County Health Department, in coordination with the Ottawa County EMA and local fire departments, for use in an emergency.

A special needs list shall be printed by the Health Department, however, due to confidentiality concerns, simulated lists will be provided to appropriate fire departments.

Appropriate protective actions for institutionalized/special needs shall be demonstrated at the Edgewood Manor Nursing Center at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, Tuesday, May 10, 2011.

Criterion 3.c.2:

OROs/School officials decide upon and implement protective actions for schools.

Extent of Play:

In accordance with the RERP and SOGs, the Ottawa County Schools' Liaison will report to the EOC to:

1) Provide notification to local school districts.

90 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

2) Advise school district superintendents on plant status and recommended response actions.
3) Simulate the coordinating of protective actions for schools.
4) Simulate the coordinating with local school districts to provide buses and volunteer drivers for the evacuation of the mobility impaired, transportation dependent populations and health care facilities.

The Schools' Liaison communicates with the Superintendents' offices. They, in turn, notify district personnel and coordinate district resources. Communications between the Schools' Liaison and the Superintendents' offices will be documented.

+ Port Clinton City School District participants available for interview beginning at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, Tuesday, May 10 2011, include:

Port Clinton Superintendent, Transportation Supervisory/Dosimetry Coordinator, Port Clinton High School Principal, and one bus driver.

  • Danbury Local School District (non-EPZ) participants available for interview beginning at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, Tuesday, May 10, 2011, include:

Danbury Superintendent, Transportation Supervisor/Dosimetry Coordinator and one bus driver.

Sub-Element 3.d - Implementation of Traffic and Access Control Criteria 3.d.1:

Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Extent of Play:

In accordance with the RERP and SOGs, major traffic intersections are controlled by the Ottawa County Sheriff s Office with support from the Ohio State Highway Patrol, local police departments and the Ohio National Guard.

The County Engineer - Highway Garage and ODOT also assist in traffic control efforts by delivering traffic control equipment and assigning personnel to predetenrined control points.

91

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station If assistance is required to perform traffic control, clearing roads or removing stalled vehicles, it is requested from the State through Ohio EMA.

Two Traffic/Access Control Points shall be demonstrated:

5-2:

SR 19 and SR 163 Oak Harbor Police Department 5-6:

CR 42 (Harris-Salem Rd.) and CR 6 (Elmore-Eastern Rd.)

I Ohio Department of Transportation Those pre-designated access control points necessary to control access to an affected area will be i

activated (SIMULATED). Personnel from the Ottawa County Sheriffs Office, Ohio State Highway Patrol, local police departments, Ohio National Guard and ODNR supported by access control equipment from the County Engineer - Highway Garage and Ohio Department of Transportation ensure that unauthorized vehicles do not enter the evacuated areas.

Remaining Traffic Control and Access Control Points shall be demonstrated procedurally at the Ottawa County EOC by:

  • Ottawa County Sheriff Liaison
  • Ottawa County Engineer Liaison
  • Ohio Department of Transportation Liaison l
  • Ohio State Highway Patrol Liaison Ohio Department of Transportation personnel available for interview I

beginning at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />, Tuesday, May 10, 2011 ODOT Superintendent, Dosimetry Coordinator and one Worker i

Oak Harbor Police personnel available for interview beginning at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, Tuesday, May 10, 2011 include:

Police Chief, Dosimetry Coordinator and one Officer Criterion 3.d.2:

Impediments to evacuation are identified and resolved.

Extent of Play:

i Ottawa County Sheriff's Office, Ottawa County Engineer's Office, Ohio State Highway Patrol and Ohio Department of Transportation Liaisons located in the Ottawa County EOC will demonstrate the capability to:

92 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station

  • Identify impediments to evacuation
  • Implement appropriate actions to remove or otherwise deal with impediments.

Controller injects will identify impediment(s) that will impact an evacuation route and necessitate re-routing traffic and drive further discussion at GE. Actual resources will not be utilized.

Sub-Element 3.e. - Implementation of Ingestion Pathway Decisions Criterion 3.e.1:

The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio.

Criterion 3.e.2:

Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk, and agricultural production.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio.

Sub-Element 3.f-Implementation of Relocation, Re-entry, and Return Decisions Criterion 3.f.1:

Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

Extent of Play:

N/S - Criterion not selected. Successfully demonstrated in May, 2007.

EVALUATION AREA 4 - FIELD MEASUREMENT AND ANALYSIS Sub-Element 4.a - Plume Phase Field Measurement and Analyses 93

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station Criterion 4.a.1:

The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Criterion 4.a.2:

Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Criterion 4.a.3:

Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media.

I I

I I

I I

I I

I I

I I

I I

I I

Extent of Play:

N/A - Ottawa County relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Sub-Element 4.b - Post Plume Phase Field Measurements and Sampling Criterion 4.b.l:

The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (for example, food crops, milk, water, vegetation, and soil) to support adequate assessments and protective action decision-making.

Extent of Play:

N/A - Ottawa County relies on the State of Ohio Sub-Element 4.c - Laboratory Operations Criterion 4.c.1:

Extent of Play:

The laboratory is capable of performing required radiological analyses to support protective action decisions.

94

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station N/A - Ottawa County relies on the State of Ohio EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION Sub-Element 5.a - Activation of the Prompt Alert and Notification System Criterion 5.a.l:

Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized off-site emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.

I. Identification of the state or local government organization and the official with the authority for providing the alert signal and instructional message

2. Identification of the commercial nuclear power plant and a statement that an emergency situation exists at the plant.
3. Reference to REP-specific emergency information (e.g.,

brochures and information in telephone books) for use by the general public during an emergency

4. A closing statement asking the affected and potentially affected population to stay tuned for additional information.

Extent of Play:

Siren activation will be simulated at Site Area Emergency, General Emergency and prior to the announcement of PADs.

Route Verification/Supplemental Route Alerting will be demonstrated out-of-sequence. PA systems will be demonstrated with a test message at an agreed upon location.

  • Allen-Clay Joint Fire District, Station #1 Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />
  • Erie Township Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />
  • Rocky Ridge Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> 95

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station NOAA will be contacted. NOAA will not broadcast an emergency message.

  • National Weather Service (Cleveland)

EAS messages will be prepared and provided to the LP 1. EAS Messages are transmitted electronically from the Ottawa County EOC to the LP-1 station via telephone lines utilizing the SAGE ENDEC. The Ottawa County ENDEC provides a printout verifying that the message was sent. The LP-l ENDEC provides a printout verifying receipt of the message. EAS messages will be recorded but not broadcast.

  • WRVF 101.5 FM Radio Tuesday, May 10, 2011 Text telephones (TTY/TDD) are available for demonstration by the Ottawa County Sheriff's Dispatch and by Public Inquiry.

Criterion 5.a.2:

Criterion 5.a.3:

(RESERVED)

Activities associated with FEMA approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system.

I I

I I

I I

I I

I I

I I

I 1

I Extent of Play:

Sirens 301 (Allen-Clay Joint Fire District, Station #1), 313 (Rocky Ridge Fire Department) and 701 (Erie Township Fire Department) will be identified as failing at the General Emergency (during the out of sequence demonstration of this criterion).

Backup Route Alerting will be demonstrated out-of-sequence. PA systems will be demonstrated with a test message at an agreed upon location.

+ Allen-Clay Joint Fire District, Station #1 Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />

  • Erie Township Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />
  • Rocky Ridge Fire Department Tuesday, May 10, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> 96

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Sub-Element 5.b - Emergency Information and Instructions for the Public and Media Criterion 5.b.1:

OROs provide accurate emergency information and instructions to the public and the news media in a timely manner.

Extent of Play:

EAS messages will be prepared and provided to the LP 1. EAS messages will be recorded but not broadcast.

  • WRVF 101.5 FM Radio In accordance with the RERP and SOGs, the JIC will be activated and staffed by PIOs from Ottawa County, Lucas County, the State, Federal Agencies and the Utility upon declaration of an ALERT. News Releases will be coordinated with all participating PIOs prior to release to the news media with briefings held jointly, as appropriate.

The Ottawa County PIO will maintain contact with the Public Information Assistant in the Ottawa County Emergency Operations Center (EOC) who will serve as the primary contact point for all public information related matters within the Ottawa County EOC. Ottawa County will not conduct a news briefing at the Ottawa County EOC.

Information from participating local or County agencies in the EOC will be coordinated with the Public Information Assistant. The Public Information Assistant will provide information to the PIO for development of a joint news statement with Lucas County and the State, if appropriate.

The Public Information Assistant will ensure that the Commissioners are aware of information being disseminated to the news media. The PIO will coordinate with the Public Information Assistant to receive Commissioner approval on news statements affecting Ottawa County prior to dissemination to the news media.

A Public Inquiry telephone will be operational and demonstrated.

EVALUATION AREA 6 - SUPPORT OPERATION/FACILITIES Sub-Element 6.a - Monitoring and Decontamination of Evacuees and Emergency Workers and Registration of Evacuees.

Criterion 6.a.l:

The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

97

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Extent of Play:

In accordance with the RERP and SOGs, if evacuation is the recommended protective action, residents are instructed to leave the affected area along designated routes and go to specific reception centers located in adjacent/host counties. No reception centers are located in Ottawa County,. At reception centers, the evacuees are checked for contamination, provided KI (if appropriate), registered and assigned to a care center (if necessary).

The evacuee portion of this criterion shall be demonstrated at the Sandusky High School Reception Center, Sandusky, Ohio, out of sequence on Wednesday, May 11, 2011, at 1830 I

hours.

In accordance with applicable guidance, monitoring will be demonstrated and decontamination will be 3

discussed by Sandusky Fire Department. The Dosimetry Coordinator will be pre-positioned at Sandusky High School and will distribute dosimetry from that location.

The ORO will provide six individuals to be simulated evacuees. They will be monitored for contamination and will be processed through the facility.

3 Initial monitoring utilizing a Bicron Portal Monitor will identify one evacuee to be referred to secondary monitoring. One locker room will be fully set up and demonstrated.

3 Decisions on the need for decontamination will be made based on Controller injected radiation levels. Decontamination will be simulated. The proper sequence for washing and for decontamination efforts, and the decisions to refer individuals who cannot be decontaminated to medical facilities will be discussed.

Contamination control and record-keeping procedures will be demonstrated at the initial and I

secondary monitoring points.

Brown Kraft paper will be used for floor covering.

Registration of six evacuees will be demonstrated by Erie County Job & Family Services.

Transportation of evacuees from the reception center to care centers will not be demonstrated.

Participating organizations:

Sandusky Fire Department Erie County Job & Family Services Erie County Department of Health Should the Ohio Department of Health recommend potassium iodide for the general public, KI will be distributed to evacuees by Erie County Department of Health after initial monitoring.

1 98

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Evacuee vehicle monitoring will be demonstrated and decontamination will be discussed by members of the Sandusky Fire Department and the Sandusky High School. The vehicle monitoring and decontamination area will be set up as per guideline. One vehicle will be monitored and decontamination will be discussed. A firefighter will be available to answer questions regarding monitoring and decontamination guidelines, contamination control and record keeping.

Emergency Worker Monitoring and Decontamination will be demonstrated at the Port Clinton Fire Station out-of-sequence on Tuesday, May 10, 2011, beginning at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />, by the Port Clinton Fire Department.

The ORO will provide individuals to be simulated Emergency Workers returning from a field assignment. One Emergency Worker will be identified as contaminated and will be processed through the facility. Decisions on the need for decontamination will be made based on Controller injected radiation levels. Decontamination will be simulated. The proper sequence for washing and for decontamination efforts, and the decisions to refer individuals who cannot be decontaminated to medical facilities will be discussed.

Sub-Element 6.b -

Monitoring and Decontamination of Emergency Worker Equipment Criterion 6.b.1:

The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles.

Extent of Play:

Emergency worker vehicle monitoring and decontamination will be demonstrated by members of the Port Clinton Fire Department at the Port Clinton Fire Station out-of-sequence on Tuesday, May 10, 2011, beginning at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />. The vehicle monitoring and decontamination area will be set up as per guideline. One vehicle will be monitored but not decontaminated. A firefighter will be available to answer questions regarding monitoring and decontamination guidelines, contamination control and record-keeping.

Sub-Element 6.c - Temporary Care of Evacuees Criterion 6.c.1:

Managers of congregate care facilities demonstrate that the centershave resources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -

Preparedness Operations, ARC 3031) Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate before entering congregate care facilities.

Extent of Play:

99

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Perkins High School congregate care facility will be demonstrated via interview out of sequence on Wednesday, May 11, 2011, at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br />.

Care Center capabilities to provide food, bedding and other necessities will be demonstrated via documentation from the American Red Cross.

Briar Middle School (located adjacent to the campus of Perkins High School) is the alternate/overflow care center for Perkins High School. The Erie County EMA has coordinated a walkthrough of the facility and an interview with the center manager between 1900 and 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on Wednesday, May 11, 2011 following the Perkins High School Care Center demonstration. Briar Middle School will not be set up to receive evacuees.

American Red Cross staff positions participating at Perkins High School will include one care center manager, one registration worker, one nurse, and one family worker.

Participating organizations:

American Red Cross ARES/RACES Sub-Element 6.d -

Transportation and Treatment of Contaminated Injured Individuals.

Criterion 6.d.l:

The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

Extent of Play:

Not demonstrating this exercise.

I I

I I

I I

I I

I I

I I

100

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station LUCAS COUNTY 2011 RADIOLOGICAL PREPAREDNESS EXERCISE EXTENT OF PLAY AGREEMENT Criteria that can be re-demonstrated immediately for credit, by a decision of the evaluator, include the following: 3.a.1, 3.d.1, 3.d.2, 6.a.1, 6.b.1, 6.c.1 and 6.d.1. Criteria that may be re-demonstrated, as approved on a case-by-case basis by the Chairperson of the Regional Assistance Committee, include the following: 2.a.1, 2.b.1, 2.b.2, 5.a.1 and 5.b.1.

EVALUATION AREA 1 - EMERGENCY OPERATIONS MANAGEMENT Sub-Element l.a - Mobilization Criterion 1.a.l: OROs use effective procedures to alert, notify and mobilize emergency personnel and activate facilities in a timely manner.

Extent of Play:

All agencies identified in the Lucas County Radiological Emergency Response Plan (RERP) will be alerted as per established procedures. The primary means of notification from Davis-Besse Nuclear Power Station is a dedicated line; therefore, a verification call will not be performed. If a back-up means of communication (commercial phone) is necessary, a verification call will be made. Appropriate personnel shall be mobilized in accordance with the RERP to staff emergency facilities. The Sheriff's Dispatcher will notify the emergency response agencies/individuals. Agencies/individuals to be notified will vary according to the level of emergency. Agencies/individuals will be contacted by radio, pager or telephone and will verify the accurate receipt of the notification message by either reading it back or calling the Sheriff s Dispatch Center (or EOC, if activated) depending upon how the individual was notified.

Following verification, the designated individual will notify appropriate personnel within the agency by using normal internal notification procedures. Personnel will be informed of the Plant's status so that each agency with response roles at specific levels in the emergency can take appropriate actions as specified in the plan. The individual/agency representative receiving initial notification will notify appropriate personnel within the agency using normal internal notification procedures. Individual agencies rely on telephone and/or radio to contact their personnel according to a predetermined priority call list. The County EMA Director shall be responsible for EOC activation and operation.

The EOC will not normally be activated for an UNUSUAL EVENT. It may be activated for an ALERT at the discretion of the EMA Director. The EOC staff will be fully mobilized at a SITE AREA EMERGENCY or GENERAL EMERGENCY.

The following field activities/facilities will be demonstrated out of sequence:

Traffic/Access Control 101

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Lucas County Sheriff's Office Road Patrol TUESDAY, MAY 10, 2011 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> Backup Route Alerting 5

Jerusalem Township Fire Department MONDAY, MAY 9,2011 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> Route Verification Jerusalem Township Fire Department MONDAY, MAY 9, 2011 at 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> i

Protective Action Implementation Oregon City School District Transportation Department l

TUESDAY, MAY 10, 2011 @ 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> Contaminated Injured i

Jerusalem Township Fire Department MONDAY, MAY 9,2011 at 1930 5

Mercy St. Charles Hospital TUESDAY, MAY 10, 2011 at 0830 Sub-Element 1.b - Facilities Criterion 1.b.1 Facilities are sufficient to support the emergency response.

Extent of Play:

Not selected. The Lucas County Emergency Operations Center was successfully demonstrated i

in 2007. There have not been any significant physical or other alterations to this facility since the 2007 evaluation.

Sub-Element 1.c - Direction and Control Criterion 1.c.1:

Key personnel with leadership roles for the ORO provide direction and i

control to that part of the overall response effort for which they are responsible.

Extent of Play:

Direction and Control will be demonstrated by appropriate participating agencies in accordance with RERP and SOPs.

Sub-Element 1.d - Communications Equipment 102 I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criterion 1.d.l:

At least two communication systems are available, at least one operates properly, and communication links are established and maintained with appropriate locations. Communications capabilities are managed in support of emergency operations.

Extent of Play:

Commercial telephone is used as the primary means of communications between the Utility, Local, County, State and Federal agencies. The initial notification call informing County officials of an emergency at DBNPS may come through the Sheriff's Dispatch Center on the 4-Way dedicated telephone line. Upon activation of the County EOC, a 4-way dedicated (conference style) telephone hook-up will connect the Utility, Ottawa County EOC, Lucas County EOC and the Ohio EOC. A fax machine will support verbal communications, as well as plant status and radiological dose assessment updates. This system may remain open and operational until the incident is terminated by the appropriate authority.

In addition, a 3-way conference line will connect Ottawa and Lucas County Commissioners and the Governor's Representative and will be used to coordinate protective action recommendations and activation of the siren system and EAS.

Once notification has been made and communication links are established, a telephone/radio network will be used to expedite agency communications.

Radio/backup communication will be available for:

Amateur Radio Emergency Service Ohio Emergency Management Agency Oregon City School Bus Garage Lucas County Sheriffs Dispatch Sub-Element i.e - Equipment and Supplies to Support Operations Criterion 1.el:

Equipment, maps, displays, dosimetry, potassium iodide (KI), and other supplies are sufficient to support emergency operations.

Extent of Play:

All equipment, displays, supplies, etc. at the locations listed in Criterion L.a. 1. will be demonstrated.

Sufficient quantities of direct-reading and permanent record dosimetry and dosimeter chargers are available for issuance to emergency workers. Dosimetry and KI have been pre-distributed to ORO's (see 3.a. 1 and 3.b. 1). Available supplies of KI will be within the expiration date indicated on KI bottles or blister packs.

103

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

The letter identifying completion of the periodic requirements (identifying equipment calibration dates and KI expiration dates) will be provided at the evaluators pre-exercise meeting.

Monitoring kits and Dosimetry are exchanged annually; the documentation is included in the 2011 Annual Letter of Certification.

The Ohio Department of Health (ODH) (through local health departments) makes KI available to the general public by pre-distribution and distribution at reception centers. KI distribution to the general public at reception centers will not be demonstrated in 2011.

l EVALUATION AREA 2 - PROTECTIVE ACTION DECISION MAKING Sub-Element 2.a - Emergency Worker Exposure Control Criterion 2.a.l:

OROs use a decision-making process, considering relevant factors and I

appropriate coordination, to insure that an exposure control system, including the use of KI, is in place for emergency workers including provisions to authorize radiation exposure in excess of administrative i

limits or protective action guides.

Extent of Play:

i The Lucas County Radiological Officer will coordinate with dosimetry coordinators to monitor exposure of county emergency workers. Each emergency worker will wear assigned dosimetry devices at all times when performing personnel or equipment. contamination monitoring and decontamination, when handling radioactive material, and whenever an individual is in the EPZ during a SITE AREA EMERGENCY or GENERAL EMERGENCY. Individuals will be instructed to read their direct-reading dosimetry every thirty minutes or more frequently after the onset of a GENERAL EMERGENCY.

Should the scenario dictate a revised exposure limit, the message will be disseminated to dosimetry coordinators by the RO.

3 Advisories from the EOC to field personnel will be simulated due to out of sequence play.

The Ohio Department of Health will recommend the use of KI.

Dosimetry packets have been pre-distributed to emergency response organizations.

Controller inject will initiate the discussions about the process for exceeding exposure limits.

104

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Sub-Element 2.b - Radiological Assessment and Protective Action Recommendations and Decisions for the Plume Phase of the Emergency.

Criterion 2.b.1:

Appropriate protective action recommendations are based on available information on plant conditions, field monitoring data, and licensee and ORO dose projections, as well as knowledge of on-site and off-site environmental conditions.

Extent of Play:

Not Applicable - Lucas County does not demonstrate this criterion; it relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Criterion 2.b.2:

A decision-making process involving consideration of appropriate factors and necessary coordination is used to make protective action decisions (PADs) for the general public (including the recommendation for the use of KI, if ORO policy).

Extent of Play:

Protective Action Decisions (PADs) will be made in accordance with the RERP and SOPs. The Lucas County Commissioners are responsible for the recommendation and implementation of protective measures for the affected public and emergency workers in Lucas County. They will reach their decisions by weighing information, data and protective action recommendations from the State, Utility, Federal and local sources. When a protective action has been recommended by either the Davis-Besse Nuclear Power Station (DBNPS) or the State of Ohio, the Lucas County Commissioners will consult with the Lucas County Executive Group and the Ottawa County Commissioners to decide upon a coordinated protective action, the time when the sirens will be activated, an Emergency Alert System (EAS) message and Special News Broadcasts (SNBs).

The decision to advise the general public to take KI will be based upon the recommendation of ODH.

The county will demonstrate the capability to communicate the contents of PADs with affected jurisdictions. The number of PADs will be dependent on the scenario, however, at least two (2) will be demonstrated.

Sub-Element 2.c - Protective Action Decisions Consideration for the Protection of Special Populations Criterion 2.c.1:

Protective action decisions are made, as appropriate, for special population groups.

105

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Extent of Play:

There are no special facilities within the Lucas County Portion of the EPZ. The ability to make a decision to evacuate the mobility impaired or transportation dependent will be demonstrated in the EOC by the Fire Coordinator by interview.

Sub-Element 2.d - Radiological Assessment and Decision Making for the Ingestion Exposure Pathway Criterion 2.d.1:

Radiological consequences for the ingestion pathway are assessed and appropriate protective action decisions are made based on the ORO planning criteria.

Extent of Play:

Not Applicable - Lucas County relies on the State of Ohio.

Sub-Element 2.e - Radiological Assessment and Decision Making Concerning Relocation, Re-entry and Return Criterion 2.e.l:

Timely re-location, re-entry, and return decisions are made and coordinated as appropriate, based on assessments of radiological conditions and criteria in the OROs plan and/or procedures.

Extent of Play:

Criterion Not Selected: This is a six year objective and was successfully demonstrated in 2007.

EVALUATION AREA 3 - PROTECTIVE ACTION IMPLEMENTATION Sub-Element 3.a - Implementation of Emergency Worker Exposure Control I

I I

I I

I I

I I

I I

I I

I I

I Criterion 3.a.1:

The OROs issue appropriate dosimetry and procedures and manage radiological exposure to emergency workers in accordance with the plan and procedures. Emergency workers periodically and at the end of each mission read their dosimeters and record the readings on the appropriate exposure record or chart.

Extent of Play:

The Lucas County Radiological Officer will coordinate with dosimetry coordinators to monitor exposure of county emergency workers. Each emergency worker will wear assigned dosimetry devices at all times when performing personnel or equipment contamination monitoring and decontamination, when handling radioactive material, and whenever an individual is in the EPZ during a SITE AREA EMERGENCY or GENERAL EMERGENCY.

106

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Individuals will be instructed to read their direct-reading dosimetry every thirty minutes or more frequently after the onset of a GENERAL EMERGENCY.

Should the scenario dictate a revised exposure limit, the message will be disseminated to dosimetry coordinators by the RO.

Advisories from the EOC to field personnel will be simulated due to out of sequence play.

Dosimetry packets have been pre-distributed to emergency response organizations.

A dosimetry briefing will be demonstrated for emergency workers prior to beginning their mission.

Criterion 3.a.1 will be demonstrated by appropriate agencies/personnel in conjunction with their RERP assignments.

0 Oregon City School District Transportation Department 0

Jerusalem Township Fire Department (JFD)

Lucas County Sheriff's Office Substation located behind JFD Mercy St. Charles Hospital Sub-Element 3.b - Implementation of KI Decision Criterion 3.b.l:

KI and appropriate instructions are available should a decision to recommend use of KI be made. Appropriate record keeping of the administration of KI for emergency workers and institutionalized individuals is maintained.

Extent of Play:

In accordance with the RERP and SOPs, Potassium Iodide (KI) is supplied by the Ohio Department of Health to the Ohio EMA for pre-distribution to offsite response organizations.

The Ohio EMA provides a full dose complement of KI tablets for each dosimetry packet of emergency workers with potential to enter the EPZ, thus allowing emergency workers to begin use promptly and voluntarily upon recommendation from the Ohio Department of Health.

Should the Ohio Department of Health recommend the taking of KI for emergency workers, the County Radiological Officer will coordinate with local agency dosimetry coordinators to implement such a recommendation.

107

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station A KI briefing for emergency workers will be demonstrated prior to beginning their mission.

0 KI WILL NOT BE INGESTED.

Agencies/individuals will demonstrate Criterion 3.b. 1 in conjunction with their RERP assignments. Those available for evaluator interviews will include:

Oregon City School District Transportation Department Jerusalem Fire Department (JFD)

Lucas County Sheriffs Office Substation located behind JFD The Ohio Department of Health (ODH) (through local health departments) makes KI available to the general public by pre-distribution and by distribution at reception centers. The decision to advise the general public to take KI will be based upon the recommendation of ODH.

KI distribution to the general public at reception centers will not be demonstrated in 2011.

Sub-Element 3.c - Implementation of Protective Actions for Special Populations I

I I

I I

I I

I I

I I

I I

I i

Criterion 3.c.1:

Protective action decisions are implemented for special populations, other than schools, within areas subject to protective actions.

Extent of Play:

A list of people with special needs (mobility impaired, hearing impaired, etc.) is maintained by the Lucas County EMA, in coordination with the Fire Coordinator in the EOC and with the Jerusalem Township Fire Chief. This list will be presented to an evaluator upon request although it is considered a confidential list.

Coordination with the Oregon City School District to provide buses and volunteer drivers for the (simulated) evacuation of the mobility impaired/transportation dependent populations will be relayed by the Fire Coordinator in the EOC. Demonstration will be by interview with the Oregon City School District Transportation Director and a volunteer bus driver at the Bus Garage at Clay High School, TUESDAY, MAY 10, 2011 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />. A bus will not be driven for this exercise.

Criterion 3.c.2:

OROs/School officials decide upon and implement protective actions for schools.

108

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Extent of Play:

Lucas County has no schools within the 10-mile EPZ. However, an Oregon City School District Representative will be available for an interview in the Lucas County EOC to describe the process for identifying and holding 1 0-mile EPZ students for parental pickup.

Sub-Element 3.d - Implementation of Traffic and Access Control Criteria 3.d.1:

Appropriate traffic and access control is established. Accurate instructions are provided to traffic and access control personnel.

Extent of Play:

Lucas County Sheriff's Office Road Patrol will demonstrate this at the Sheriff's Substation on Jerusalem Road (State Route 2) TUESDAY, MAY 10, 2011 at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />.

After the Road Patrol Deputy receives his dosimetry coordinator briefing, a controller inject will be communicated to the Dosimetry Coordinator to have a Deputy report to combined Traffic Control Point/Access Control Point 11-6, located at the intersection of Elliston and Veler Road.

The County Engineer also assists in traffic control efforts by delivering traffic control equipment and assigning personnel to predetermined control points.

Activation of the remaining traffic and access control points shall be demonstrated procedurally (simulated) at the Lucas County EOC by:

Lucas County Law Enforcement Coordinator Lucas County Engineer Ohio State Highway Patrol Criterion 3.d.2:

Impediments to evacuation are identified and resolved.

Extent of Play:

The Lucas County Sheriff's Office and the Lucas County Engineer's Office Liaison located in the EOC will demonstrate the capability to:

  • Identify impediments to evacuation

" Implement appropriate actions to remove or otherwise deal with impediments.

109

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station I

After Action Report/Improvement Plan A controller inject will identify an impediment that will impact an evacuation route and necessitate re-routing traffic and drive further discussion at GE. Actual resources will not be used.

Sub-Element 3.e. - Implementation of Ingestion Pathway Decisions Criterion 3.e.1:

The ORO demonstrates the availability and appropriate use of adequate information regarding water, food supplies, milk and agricultural production within the ingestion exposure pathway emergency planning zone for implementation of protective actions.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio Criterion 3.e.2:

Appropriate measures, strategies and pre-printed instructional material are developed for implementing protective action decisions for contaminated water, food products, milk, and agricultural production.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio Sub-Element 3.f - Implementation of Relocation, Re-entry, and Return Decisions Criterion 3.f.1:

Decisions regarding controlled re-entry of emergency workers and relocation and return of the public are coordinated with appropriate organizations and implemented.

Extent of Play:

Not Selected: This Criteria was successfully demonstrated in 2007.

EVALUATION AREA 4 - FIELD MEASUREMENT AND ANALYSIS Sub-Element 4.a - Plume Phase Field Measurement and Analyses Criterion 4.a.l:

The field teams are equipped to perform field measurements of direct radiation exposure (cloud and ground shine) and to sample airborne radioiodine and particulates.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio and on the Davis-Besse Nuclear 110 I

I I

I I

I I

I I

I I

I I

I

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Power Station.

Criterion 4.a.2:

Field teams are managed to obtain sufficient information to help characterize the release and to control radiation exposure.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio and on the Davis-Besse Nuclear Power Station Criterion 4.a.3:

Ambient radiation measurements are made and recorded at appropriate locations, and radioiodine and particulate samples are collected. Teams will move to an appropriate low background location to determine whether any significant (as specified in the plan and/or procedures) amount of radioactivity has been collected on the sampling media.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio and on the Davis-Besse Nuclear Power Station.

Sub-Element 4.b - Post Plume Phase Field Measurements and Sampling Criterion 4.b.l:

The field teams demonstrate the capability to make appropriate measurements and to collect appropriate samples (for example, food crops, milk, water, vegetation, and soil) to support adequate assessments and protective action decision-making.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio Sub-Element 4.c - Laboratory Operations Criterion 4.c.1:

The laboratory is capable of performing required radiological analyses to support protective action decisions.

Extent of Play:

Not applicable - Lucas County relies on the State of Ohio EVALUATION AREA 5 - EMERGENCY NOTIFICATION AND PUBLIC INFORMATION 111

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/improvement Plan Davis-Besse Nuclear Power Station Sub-Element 5.a - Activation of the Prompt Alert and Notification System Criterion 5.a.1:

Activities associated with primary alerting and notification of the public are completed in a timely manner following the initial decision by authorized off-site emergency officials to notify the public of an emergency situation. The initial instructional message to the public must include as a minimum the elements required by current FEMA REP guidance.

Extent of Play:

Ottawa County is responsible for EAS and siren activation. Lucas County Executive Group will coordinate with Ottawa County for the time of siren sounding and the EAS message to be broadcast.

The Lucas County Executive Group will insure that all elements of the EOC are aware of all EAS messages issued to the public.

Route Verification/Supplemental Route Alerting will be demonstrated out-of-sequence. Public address (PA) systems will be demonstrated with a test message at an agreed upon location.

  • Jerusalem Township Fire Department Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> I

I I

I i

I I

I I

I I

I I

I I

I Criterion 5.a.2:

Criterion 5.a.3:

(RESERVED)

Activities associated with FEMA-approved exception areas (where applicable) are completed within 45 minutes following the initial decision by authorized offsite emergency officials to notify the public of an emergency situation. Backup alert and notification of the public is completed within 45 minutes following the detection by the ORO of a failure of the primary alert and notification system.

Extent of Play:

During the out-of-sequence demonstration of this criterion Siren #0004 in Jerusalem Township will be identified as failing at the General Emergency. There will be no siren failures during in-sequence play.

Backup Route Alerting will be demonstrated out-of-sequence. Public address (PA) systems will be demonstrated with a test message at an agreed upon location.

  • Jerusalem Township Fire Department Monday, May 9, 2011 - 1830 hours0.0212 days <br />0.508 hours <br />0.00303 weeks <br />6.96315e-4 months <br /> 112

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Sub-Element 5.b - Emergency Information and Instructions for the Public and Media Criterion 5.b.I:

OROs provide accurate emergency information and instructions to the public and the news media in a timely manner.

Extent of Play:

In accordance with the RERP and SOP's, the JIC will be activated and staffed by Public Information Officers (PIOs) from Ottawa County, Lucas County, the State, Federal Agencies and the utility upon declaration of an ALERT. News statements will be coordinated with all participating PIOs with briefings held jointly, as appropriate.

Upon arrival at the JIC, the Lucas County PIO will establish and remain in contact with the Public Information Liaison in the Lucas County EOC who will serve as the primary contact point for all public infOrmation related matters within the Lucas County EOC.

The Public Information Liaison will ensure that the Commissioners are aware of information being disseminated to the news media. The PIO will coordinate with the Public Information Liaison to receive Commissioner approval on news statements affecting Lucas County prior to dissemination to the news media.

A public inquiry telephone will be used to allow public inquiry staff to demonstrate the capability to identify trends in rumors (e.g., frequently expressed false or misleading information). The public inquiry staff will demonstrate the capability to provide or obtain accurate information for callers or refer them to an appropriate source. Information from the hotline staff, including information that corrects false or inaccurate information when trends are noted, will be included as appropriate in emergency information provided to the public, media briefings and/or media releases.

A media briefing will not be demonstrated in the Lucas County EOC.

EVALUATION AREA 6 - SUPPORT OPERATION/FACILITIES Sub-Element 6.a - Monitoring and Decontamination of Evacuees and EmergencyWorkers and Registration of Evacuees.

Criterion 6.a.l:

The reception center/emergency worker facility has appropriate space, adequate resources, and trained personnel to provide monitoring, decontamination, and registration of evacuees and/or emergency workers.

Extent of Play:

Not Selected. This criterion was successfully demonstrated in 2007.

Sub-Element 6.b - Monitoring and Decontamination of Emergency Worker Equipment 113

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Criterion 6.b.1:

The facility/ORO has adequate procedures and resources for the accomplishment of monitoring and decontamination of emergency worker equipment, including vehicles.

Extent of Play:

Not Selected. This criterion was successfully demonstrated in 2009.

Sub-Element 6.c - Temporary Care of Evacuees Criterion 6.c.1:

Managers of congregate care facilities demonstrate that the centers have resources to provide services and accommodations consistent with American Red Cross planning guidelines. (Found in MASS CARE -

Preparedness Operations, ARC 3031) Managers demonstrate the procedures to assure that evacuees have been monitored for contamination and have been decontaminated as appropriate before entering congregate care facilities.

Extent of Play:

Not Selected. This criterion was successfully demonstrated in 2007.

Sub-Element 6.d - Transportation and Treatment of Contaminated Injured Individuals I

I U

I I

I I

I I

I I

I I

I I

I I

I I

Criterion 6.d.1:

The facility/ORO has the appropriate space, adequate resources, and trained personnel to provide transport, monitoring, decontamination, and medical services to contaminated injured individuals.

Extent of Play:

Jerusalem Township Fire Department (JFD) will demonstrate assessment and transport of a contaminated, injured individual at the JFD Complex, out-of-sequence, on Monday, May 9, 2011, beginning at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br />.

The ORO will provide an individual who will simulate being an injured and contaminated member of a State Field Monitoring Team. JFD will assess the patient for injuries and contamination. Once stabilized, the patient will be prepared for transport to Mercy St. Charles Hospital. Communications with the Hospital will be simulated for demonstration purposes.

After simulated communications with the hospital the transportation portion of the demonstration will end.

At 0830 Tuesday May 10, 2011 The treatment demonstration will resume at Mercy St. Charles Hospital beginning with the unloading of the contaminated victim from the ambulance.

114

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station Upon arrival at Mercy St. Charles Hospital the patient will be treated by the Radiation Emergency Area (REA) Response Team.

115

Unclassified Radiological Emergency Preparedness Program (REP)U After Action Report/Improvement Plan Davis-Besse Nuclear Power Station MS.1 DRILL - JERUSALEM TOWNSHIP FIRE U

DEPARTMENT/MERCY ST. CHARLES HOSPITAL Narrative Summary I

This out-of-sequence drill has been prepared in order to meet the MS-1 Medical Drill requirements for Lucas County.

Monday, May 9,2011 (ZD 1930 Hours:

For purposes of this drill, it is assumed that radioactive particulates were carried offsite in a plume as a consequence of an accident at Davis-Besse Nuclear Power Station. A GENERAL EMERGENCY classification level has already been declared and an evacuation I

recommendation was issued for Jerusalem Township residents in Subarea 11. Jerusalem Township Fire Department personnel have reported to the fire station to assist with the evacuation and have been issued dosimetry and KI.

3 Emergency Worker Vehicle monitoring and decontamination is simulated to be in progress, and personnel are at their assigned stations with monitoring instruments checked and I

available.

The Medical Services - Transportation demonstration begins at 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> in Jerusalem I

Township when an emergency worker who had been assisting with vehicle decontamination trips and falls. He sustains an injury from contact with the outside of the vehicle (simulated).

3 Fire department personnel from the fire station will be dispatched to the accident scene.

The patient is assessed for injuries and possible contamination. Once stabilized, the patient is prepared for transport and loaded into the transport vehicle. Jerusalem Township Fire Department personnel will demonstrate radio contact with Mercy St. Charles Hospital.

Transport will not occur. This will end the MS-1 Transportation portion of the demonstration.

Tuesday, May 10, 2011 ( 0830 Hours:

Mercy St. Charles Hospital will demonstrate the Medical Services - Facilities criterion upon I

radio communication from Jerusalem Township Fire Department personnel to the Mercy St.

Charles Hospital Emergency Department of the pending arrival of a contaminated/injured individual. This demonstration will be terminated upon successful demonstration of all criteria by the lead controller with concurrence from the FEMA evaluator.

I Attached:

1 - Sequence of Events 2 - Medical and Contamination Data 116

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station APPENDIX F: ONSITE AND OFF SITE SCENARIO 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cuea Drill Approx O

Action Card Utility Action Time The on-shift Shift Manager is briefed and the Exercise Authorization Form is approved.

A Control Room Liaison (Member of the Controller Organization) is positioned in the real Control Room to:

" Respond to questions from the Shift Manager.

" Facilitate sounding of plant alarms.

" Advise Lead Controller of changes in plant conditions that may impact the exercise.

Operator Shift personnel designated to participate in the exercise are briefed in Control Room Simulator OSC craft personnel assemble in the OSC for their pre-drill safety briefing.

Onshift Maintenance, Chemistry, Radiation 2

Protection and OSC management are briefed in the OSC on simulated plant conditions NOTE: The scenario will utilize the Control Room Simulator (CRS) to conduct Operator response instead of the Plant Control Room. An off-shift Operations Control Room crew will be pre-staged and briefed at the Control Room Simulator.

The Equipment Operators will be pre-staged in the plant. Pre-designated Maintenance, Chemistry and Radiation Protection Personnel will assemble at the OSC once it is activated. Since players will not be able to use their nonnal

-01/15 0630

-00/45 0700

-00/15 0730 00/00 0745 117

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I I

6.4 SEQUENCE EVENTS (NON-UTILITY)

U Cue Utility Action Drill Approx A

Card #

Time Time Offsite Action communicauons channels to contact mne Control Room, an "Exercise Phone List" will be provided.

CAUTION Entry into Protected Train room(s) requires permission from the on-shift Shift Manager PRIOR to room entry. lf the on-shift Shift Manager is not available, any on-shift Senior Reactor Operator may grant permission. The total number of individuals entering, and the purpose of entry should be communicated The PLAYER is responsible for obtaining permission PRIOR to room entry.

(CA 03-04598-01)

JIC Setup Instructions are provided to JIC 3

Manager. Security will not be established in the Edison Plaza Lobby. Security will be established on the 8th floor for the restricted JIC areas.

NOTE: JIC personnel will be prestaged due to the distance from the station. Once the ERO pagers are activated a JIC Controller will allow small groups of JIC staff to respond to the JIC at random times to begin setup activities.

DBAB Security setup instructions for the 4

ERFs in the DBAB. To allow non participating personnel to continue work a bypass around the TSC and EOF hallway will be established.

Control Room Simulator operations shift takes control of Control Room Simulator with the following events in progress 00/00 0745 00/00 07/45 I

I I

I I

I 1

I I

I I

I I

118

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #Utility Action Time Time Offsite Action 100% power.

  • All systems in automatic 380 EFPD All plant chemistry parameters are stable and in specification Motor Driven Feedwater Pump is out of service for bearing replacement work.

Expected to be restored to service by 1400.

0 Containment Spray Pump #1 is out of service for mechanical seal replacement.

Repairs should be complete at 18:00.

Two mobile cranes are in operation near the BWST, staging materials that will be used for the Reactor Closure Head Replacement Outage.

5 Control Cell Instructions for addressing multiple from the ERO on the same issue.

6X Safety Briefing for individuals that did not attend the Player's Briefing or participate in one of the pre-job briefings.

The Lead Controller at the Control Room Simulator will direct the following actions:

00/00 07/45 00/00 0745 00/00 0745

1. A Gai-Tronics announcement for the start of the scenario 7

00/00 0745

2. Activation of the ERO pager drill code (969696), which advises all ERO pager carriers that the pages which follow are related to the scenario.

The NRC Duty Officer will be notified by 8

the Control Cell that Davis Besse will be conducting an Emergency Preparedness 119

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I I

6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Utility Action Drill Approx Card #

UiiyAto Time Time Offsite Action drill.

Contingency message to continue with the 9X drill even if the Simulator Computer locks up.

00/15+

0800+

I I

INITIATING EVENT FOR THE ALERT A member of Site Management calls the MS-3 Control Room Simulator, and reports that a mobile crane has backed into the side of the BWST. The BWST is dented, and leaking.

00/20 0805 Contingency message to be delivered to the 10X Shift Manager/Unit Supervisor if the 00/20+

0805+

BWST is declared INOPERABLE. This contingency message will define the rate of unit power reduction, to ensure the unit is on line for the 0955 event.

ALERT The Shift Manager and his staff evaluate the indications and classify the ALERT in 00/35 0820 accordance with Emergency Action Level (EAL) HA3, Natural or destructive phenomena affecting VITAL AREAS:

1 I

I I

I I

I I

I I

6. Vehicle crash resulting in EITHER of the following:

VISIBLE DAMAGE to ANY structures in Table H-1 areas containing safety systems or components. (BWST).

(Refer to Section 6.3, EAL Declaration Table for details.)

The Control Room Simulator operators 120

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action takes the following actions in accordance with RA-EP-01700, Alert:

lix 12X 0 Station Alarm will be sounded. The ALERT Gai-Tronics announcement will be made at the Control Room Simulator.

NOTE: Plant alarms will be sounded from the Plant Control Room since they are not accessible from the outside of the real Control Room.

" A modified Protected Area announcement will be made. Protected Area non-essential personnel assembly will be simulated.

" The Computerized Automated Notification System (CANS) will be activated to mobilize the Emergency Response Organization (ERO).

" Ottawa and Lucas Counties and the State of Ohio are notified of the ALERT, utilizing the dedicated telephone system in accordance with RA-EP-02 110, Emergency Notification procedure.

Ottawa and Lucas Counties Sheriffs Dispatchers and the State of Ohio Highway Patrol Dispatcher receive notification of the ALERT.

State and County Dispatchers notify key offsite response agency representatives.

The NRC will be notified in accordance with RA-EP-02 110, Emergency Notification procedure. Notification to NRC will be simulated. The call will be made to the Utility Control Cell.

121

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station After Action Report/Improvement Plan I

6.4 SEQUENCE EVENTS (NON-UTILITY)

U Cue Drill Approx Card #

Utility Action Time Time Offsite Action n

Normal access to the Owner Controlled Area, DBAB ERFs and the Protected Area are restricted to authorized ERO personnel only in accordance with RA-EP-025 10, Emergency Security Organization Activation and Response.

Normal access to the Owner Controlled 13 Area and Protected Area will be restored by the Controllers after approximately 30 minutes or when traffic backup becomes a safety issue for non participating personnel.

Security locks down the DBAB first floor 14 ERF hallway. ERF (TSC/EOF) hallway access is restricted to authorized personnel only for the duration of the drill.

The Emergency Director directs the 15 dismissal of training classes and sending non-essential contractors and visitors home.

The Controller will direct these actions to be simulated.

16X Contingency input in the event an ALERT has not been declared by this time.

Emergency Response Organization (ERO) staff responds to the Emergency Response Facilities (ERFs) and begin facility activation.

Once the TSC and EOF are activated, the Emergency Director in the DBAB obtains a 00/45+

0830+

00/45+

0830+

State and Counties activate their EOCs and mobilize demonstrated elements of their staffs.

I I

I I

I I

I I

I I

I I

I 00/45 0830 State of Ohio activates their Assessment Room (EMA, OEPA, ODH) in the State EOC to monitor the events at the Station. Selected Emergency Responders are alerted and placed on standby.

County agencies are notified and key personnel respond to the 122

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Utility Action Drill Approx Offsite Action l

Card #

Time Time turnover from the Emergency Director in the Control Room Simulator in accordance with the RA-EP-02010, Emergency Management.

county Emergency Operations Centers (EOCs).

NOTE: The Emergency Assistant Plant Manager on arrival in the Control Room Simulator should relieve the Emergency Director in the Control Room Simulator unless turnover to the TSC/EOF is imminent.

ERDS data will be sent to an onsite terminal due to simulated NRC participation.

The Company Public Affairs Duty Officer (PADO) provides news statements as required prior to activation of the Joint Information Center (JIC).

Once the JIC is activated, news statements are prepared and media briefings held at the JIC.

A small tear develops in the Main Condenser boot seal. Main Condenser vacuum starts to degrade.

The Main Condenser boot seal fails catastrophically. Condenser vacuum is lost, resulting in the following plant responses:

Loss of Condenser Vacuum County and pre-staged State personnel may be dispatched to the EOF and JIC.

Bus drivers are mobilized (simulated).

Emergency Alert System (EAS) brought to an "ALERT" status (simulated).

In accordance with the Ottawa County plan, EMA considers closing parklands (Subarea 10) and restricting Lake Erie boating traffic to Subarea 12. (The actual closure of the parklands and restriction of boating will be simulated.)

State and Counties issue news statements as required.

02/08 0953 02/10 0955 123

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station After Action Report/Improvement Plan I

U 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action Loss of both Main Feedwater Pumps 02/10 0955 Main Turbine trip on high exhaust pressure Generation of a reactor trip signal SFRCS actuation The reactor trip signal fails to de-energize the Control Rod Assembly motors. The 02/10 0955 automatic reactor trip signal is unsuccessful in tripping the reactor.

When the start signal is sent to #1 Auxiliary MS-4 Feedwater Pump, the Steam Admission 02/10 0955 Valve fails closed, preventing the pump from starting or running.

INITIATING EVENT FOR THE SITE AREA EMERGENCY The Control Room Simulator staff will recognize that the reactor has not tripped automatically, and will attempt to trip the reactor from the At The Controls area.

The Control Room Simulator Staff will recognize that their efforts to manually trip the reactor from the At The Controls area were not successful, and will dispatch an Equipment Operator to locally open the Reactor Trip Breakers. NOTE: Simulator Controller must record the time that it is recognized that efforts to manually trip the reactor from the At The Controls area were not successful. Record Time:

-~02/12

-~0957

-02/14

-~0959 I

I I

I I

I I

I I

The Equipment Operator dispatched to 124

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action open the Reactor Trip Breakers locally is

-02/14

-0959 successful in manually tripping the reactor.

Contingency Cue Card to be used in the 17X event that the Shift Manager/Unit 02/15+

1000+

Supervisor decides to restart Reactor Coolant Pump(s), without consulting with the Technical Support Center.

Contingency Cue Card to be used in the 18X event that the Shift Manager/Unit 02/15+

1000+

Supervisor contacts the Technical Support Center, with the intention of restarting the Reactor Coolant Pump(s).

The Emergency Response Organization evaluates the changing plant condition.

The Emergency Director orders a review of EALs in accordance with RA-EP-01500, Emergency Classification.

SITE AREA EMERGENCY The Emergency Director declares a SITE AREA EMERGENCY in accordance with

-02/27

-101 EAL SS-3, "Automatic trip failed to shutdown the reactor and manual actions taken within the Controls Area (CA) failed to shut down the reactor. (Refer to Section 6.3, EAL Declaration Table for details.)

2 The following actions are taken in accordance with RA-EP-0 1800, Site Area Emergency:

19X 0 Station alarm will be sounded and SITE AREA EMERGENCY announcement made.

-02/27

-1012 125

Unclassified Radiological Emergency Preparedness Program (REP)

Davis-Besse Nuclear Power Station After Action Report/Improvement Plan I

U 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action a

An PRO' flroun Patre will he activated.

I to notify the ERO of the upgrade.

  • Ottawa and Lucas Counties and the State of Ohio are notified of the SITE AREA EMERGENCY in accordance with RA-EP-02 110, Emergency Notification.

" The NRC Incident Response Center notifications are simulated to the Control Cell.

Containment radiation levels reach 15 R/hour (RE 4596 A & B).

The #2 Auxiliary Feedwater Pump trips on MS-6 overspeed. During the overspeed trip, the Trip/Throttle Valve jams into its closed seat.

MS-5 When a start is attempted, #2 Makeup Pump fails to start.

When attempted to start, Containment MS-7 Spray Pump #2 trips on instantaneous overcurrent.

An Equipment Operator will be directed to place the Start Up Feedwater Pump into MS-8 service. The Equipment Operator will be unable to rack in the supply breaker for the Start Up Feedwater Pump.

The Operators will have identified the loss of all feedwater and per DB-OP-02000 Specific Rule 4 will have attempted to start the standby Ottawa and Lucas Counties and the State of Ohio receive notification of the SITE AREA EMERGENCY using the dedicated telephone system.

State and County officials notify the ORO of the change in classification.

I I

I I

~-02/29

-1014 1

I

-02/30

~-1015 I

02/30+

1015+/-

U I

I I

126

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx CardUtility Action Time Time Offsite Action Makeup Pump (#2) if not previously attempted.

The #2 Makeup Pump will not start. The Crew routes to DB-OP-02000 Attachment 4 and implements MU/HPI PORV cooling.

Contingency input in the event a SITE 20X AREA EMERGENCY has not been declared by this time.

-02/32

-1017 Evacuate non-essential personnel from Protected Area (PA) to the Training Center and assembly of the OCA is directed.

(simulated)

NOTE: Evacuation of PA non-essential personnel will be simulated. However, the ERO should carry out their actions as if it were occurring. The Control Cell will perform the role of Assembly Area Coordinators and respond to the ERO directions for relocation of nonessential personnel.

Security polls the security computer to 21X determine the status of the evacuation of non-essential personnel from the Protected Area, The print-out is taken to the OSC in accordance with RA-EP-02520, Assembly and Accountability.

22X For purposes of this exercise there will be no unaccounted for individuals.

Security will conducted sweeps of the OCA. Because OCA assembly is simulated no announcements will be made.

02/35+

1020+

02/50+

1035+

127

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I U

6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Utility Action Drill Approx Offsite Card #

U Time Time Action If requested oy onsIle, the rEr venlles ne 23X siren activation by polling the siren feedback system. All sirens will respond that they sounded for 3 minutes.

Ottawa and Lutcas CounUieS coordinate times for Siren EAS/NOAA activation. (Ottawa County is responsible for this activation.) The EAS message is made and sirens are activated (simulated).

I I

Following the simulated siren sounding, Ottawa County may request the Utility verify the siren status.

The Control Cell as the simulated 24X Assembly Area Coordinators provide numbers for the assembly areas.

Closure of Parklands (Subarea 02/50+

1035+

10) and restricting boating traffic (Subarea 12) (If not done at ALERT) (simulated).

State of Ohio:

" Makes a "State of Emergency" declaration.

  • Restricts rail traffic (simulated).

" Requests FAA restrict airspace (simulated).

  • Informs federal agencies (simulated).

I I

I I

I I

I I

I I

1 Site Protection Officer Player contacts the MS-9 Central Alanr Station, and reports a water leak in the Turbine Building.

Ottawa County relocates Carroll 03/36 1121 Elementary School (If not done at ALERT) (Simulated).

Ottawa and Lucas Counties consider precautionary Protective Actions, including relocation of EPZ or Host School populations.

128

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue.

A Drill Approx Offsit Actio Cad#Utility Action Timeit Timeon Ohio Department of Agriculture (ODA) recommends precautionary sheltering of livestock within a 10-mile radius. (simulated)

Ottawa and Lucas Counties activate Reception Centers and Emergency Worker Decontamination/Monitoring Stations (simulated).

News statements are prepared and media State and counties issue news briefings held at the JIC.

statements as required.

Security makes sweeps in the OCA making The American Red Cross opens 25 announcement over the portable Public 03/15+

1100+

Care Centers (simulated).

Address System. (Simulated)

Counties initiate activation of traffic and access control (simulated).

Containment radiation levels exceed 3,000 R/hour on RE 4596 A & B. This meets the

-03/20

-1105 Loss of Fuel Clad barrier criteria.

< INITIATING EVENT FOR:THE GENERA:L EMERGENCY Valve CV-343 fails catastrophically in MPR 03/59 1144
  1. 4. Activity passes from the RCS into Containment, through Penetration #17, and is released to the enviromnent through the Station Vent. This event constitutes the loss of the CONTAINMENT fission product barrier, but is not directly observable by the Operations Crew.

High activity is indicated in the Plant Vent.

04/01 1146 129

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I U

6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue:-

Drill.

Approx.

Card.#Utility Action T.i Time Offsite.Action C ard #

/,
"'::',

i*ii

T m eTim e

!i!

Time The Emergency Response Organization evaluates the changing plant condition.

I The Emergency Director orders a review of EALs in accordance with RA-EP-0 1500, Emergency Classification.

GENERALEMERGENCY The Emergency Director declares a GENERAL EMERGENCY in accordance with EAL RG-1, Offsite dose resulting from an actual or IMMINENT release of gaseous radioactivity greater than 1000 mRem TEDE or 5000 mRem Child Thyroid CDE at the site boundary OR EAL FG-1, Loss of any two barriers and loss or potential loss of the third barrier.

(Refer to Section 6.3, EAL Declaration Table for details.)

The following actions are taken in accordance with RA-EP-01900, General Emergency procedure:

Station Alarm is sounded and the GENERAL EMERGENCY announcement is made via a request from the Emergency Director in the Emergency Operations Facility.

Dose Assessment staff performs calculations (RA-EP-02240) and provides offsite protective action recommendations (RA-EP-02245) the default PARs 1, 2, 10, and 12.

e An ERO Group Page will be activated Ottawa County confirms 04/16 1201 activation of Sandusky (simulated) and Erie County (simulated) Offsite Response Organizations.

26X Fire Departments conduct route 04/16 1201 verification and notify mobile/hearing impaired (simulated).

1 I

I I

I I

I I

I I

I State of Ohio requests FAA 130

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action to notify the ERO of the upgrade.

  • Ottawa and Lucas Counties and the State of Ohio are notified of the GENERAL EMERGENCY classification and the Protective Action Guidelines.

" The NRC Incident Response Center notifications (i.e., Red phone) are made to the Utility Control Cell.

" Evacuation of non-essential Station personnel initiated. (simulated) 27 NOTE: Evacuation of non-essential personnel to an offsite assembly site will be simulated. However, the ERO should carry out their actions as if it were occurring.

restrict airspace (simulated).

Ottawa and Lucas Counties and the State of Ohio receive notification of the GENERAL EMERGENCY, using the dedicated telephone system.

State and County officials notify Offsite Response Organizations of the change in classification.

State and Counties monitor plant conditions.

State of Ohio develops plume dose projections.

State of Ohio coordinates with Ottawa and Lucas Counties in developing Protective Action Recommendations.

Ottawa and Lucas Counties provide protective action decisions to the public.

The EAS and siren systems are activated (simulated).

Following the simulated siren sounding, Ottawa County may request the Utility verify the siren status.

Ottawa County notifies special facilities of evacuation. Ottawa If requested by offsite, the EOF verifies the siren activation by polling the siren feedback system. All sirens will indicate that they have sounded if polled.

131

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I U

6.4 SEQUENCE EVENTS (NON-UTILITY)

I Cue Drill Approx Card #

Utility Action Time Time Offsite Action I

News statements are prepared and media briefings held at the Joint Information Center (JIC).

% 'ounty auonirizes rei*uuatiOi 01 special facilities, as applicable (simulated).

Ottawa and Lucas Counties assure monitoring of emergency worker exposure.

Counties monitor evacuation routes (simulated).

State and counties provide news statements and are represented at JIC media briefings.

Ottawa and Lucas Counties implement KI decision, if requested, by ODH.

Host counties staff reception and 1206 care centers, and emergency worker decontamination monitoring stations (simulated).

1315 Contingency input in the event a 28X GENERAL EMERGENCY has not been declared by this time.

The wind direction shifts from 79 degrees to 84 degrees.

The Dose Assessment staff evaluates the change in wind direction and revises offsite protective action recommendations to evacuate Subareas 1, 2, 3, 10, 11, and 12.

Offsite agencies are notified of the change in PARs as per RA-EP-021 10.

04/21 05/30 I

I I

I I

1 1

1 1

I 05/45 Ottawa and Lucas Counties and the State of Ohio receive 1330 notification of the GENERAL EMERGENCY, using the dedicated telephone system.

132

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx' Card...Utility Action T

Offsite Action C a r d #

T im.e State of Ohio develops plume dose projections based on the change in metrological conditions.

State of Ohio coordinates with Ottawa and Lucas Counties in developing a revised Protective Action Recommendations.

Ottawa and Lucas Counties provide revised protective action decisions to the public.

The EAS and siren systems are activated (simulated).

1348 Following the simulated siren sounding, Ottawa County may request the Utility verify the siren status.

The #1 Auxiliary Feedwater Pump is repaired and returned to service.

The #2 Auxiliary Feedwater Pump Trip/Throttle Valve is repaired, and the pump is returned to service.

The Station Vent monitor reading begins decreasing - the release has ended.

The management team begins classification 29 downgrading and event termination discussions by evaluating plant conditions and formulating a plan to terminate the event. Requirements of RA-EP-01500, 06/03 Ottawa County notifies special 06/12 1357 facilities of evacuation. Ottawa County authorizes relocation of special facilities, as applicable (simulated).

06/40 1425 06/45 1430 133

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station I

I U

6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx "ff C.,":.Utility Action Tie Te Offsite"Action Card Classification, are:rTieid Time.

Emergency Classification, are reviewed.

The Recovery Advisor collects data for the recovery plan in accordance with RA-EP-02720, Recovery.

NOTE: Lead Controller shall contact all onsite and offsite Lead Facility Controllers to ensure objectives have been met prior to terminating the evaluated exercise.

Some facility may be engaged in activities that continued beyond the end of the evaluated exercise such as a media briefing or data evaluation.

I I

I U

I I

I I

The Evaluated Exercise is terminated.

30X Termination announcement is made over the Gai-Tronics and in all ERFs.

The following actions are taken by controllers:

07/00 1445 State and Counties receive notification that the Evaluated Exercise is terminated.

  • The ERO pager "All Clear" code, "0000"is activated. This advises all ERO pager carriers that the Exercise is over.I 31 0

The NRC will be notified by the Control Cell that the Davis-Besse Exercise activities have ended.

32 A short break will be taken.

Following the break, self-critiques will be held in each of the participating facilities.

A short break will be taken.

Following the break, self-critiques will be held in each of the participating facilities.

U I

I I

I I

134

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station 6.4 SEQUENCE EVENTS (NON-UTILITY)

Cue Drill Approx Card #

Utility Action Time Time Offsite Action Players assigned to take part in the recovery 33 discussions assemble in DBAB Room 209/2 10, following the facility critiques.

-1630 135

Unclassified Radiological Emergency Preparedness Program (REP)

After Action Report/Improvement Plan Davis-Besse Nuclear Power Station This page is intentionally blank.

136

GIS Training Outline for August 30, 2011

1.

FlexViewer Introduction

a.

Edits

b. Sub Areas
c.

Demonstration with Q&A

2.

Flexviewer Demographic Analysis

a.

Population in EPZ, County, Subareas

b.

Block Grouping Census Measuring

c.

Demonstration with Q&A

3.

Database information (Jays information)

a.

Critical infrastructure

b.

Emergency Management Counties

c.

Evacuee / Emergency Worker

d.

Field Support Locations

e.

Demonstration with Q&A

4.

Google Earth and FlexViewer inter-relationships

a.

Description of links to FlexViewer

b.

Similarities and Differences

c.

Accessing additional layers

d.

Parcel Data

i. Information about residences ii. Traffic iii.

Weather iv. Street View

v.

Data importing

e.

Demonstration with Q&A