L-12-205, Supplemental Information for a License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC, TAC Nos. ME7156, ME7157, ME7158 and ME7159

From kanterella
Revision as of 01:24, 12 January 2025 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Supplemental Information for a License Amendment Request to Change the Name of an Owner Licensee to Firstenergy Nuclear Generation, LLC, TAC Nos. ME7156, ME7157, ME7158 and ME7159
ML12174A225
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 06/21/2012
From: Sena P
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-12-205, TAC ME7156, TAC ME7157, TAC ME7158, TAC ME7159
Download: ML12174A225 (2)


Text

{{#Wiki_filter:FENOC F t 6 wg irrc ea I ON anng C*p"ny-\\ 76 South Main Street. Akron, Ohio 44308 Peter P. Sena lll President and Chief Operating Officer June 21,2012 L-12-230 10 cFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit Nos. I and2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440. License No. NPF-58 Supplemental Information for a License Amendment Request to Chanqe the Name of an Owner Licensee to FirstEnergv Nuclear Generation, LLC (TAC Nos. ME7156,

ME7157, ME7158.

and ME7159) By letter dated September 20,2011, FirstEnergy Nuclear Operating Company (FENOC) submitted a request for amendments to the operating licenses (OLs) of Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS); and Perry Nuclear Power Plant, Unit No. 1 (PNPP) (Accession Number ML112640246). The proposed amendments are administrative in nature and will revise the licenses to reflect the name change of an owner licensee from "FirstEnergy Nuclear Generation Corp." to "FirstEnergy Nuclear Generation, LLC." The proposed amendments will also correct errors regarding the name of FirstEnergy Nuclear Generation Corp. in the DBNPS and PNPP OLs. Nuclear Regulatory Commission (NRC) approval was originally requested by December 15,2011. FirstEnergy Corp. has subsequently determined the date for the conversion of FirstEnergy Nuclear Generation Corp. to FirstEnergy Nuclear Generation, LLC to be October 1,2012. Therefore, FENOC requests NRC approval of the license amendment on October 1,2012 with the amendments being implemented within 120 days of approval.

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-12-230 Page 2 There are no regulatory commitments contained in this letter. lf there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Supervisor Fleet Licensing, at (330) 315-6808. I declare under penalty of perjury that the foregoing is true and correct. Executed on June 2l, 2012. Sincerely, f^fl-{-& Peter P. Sena lll cc: NRC Region lAdministrator NRC Region lll Administrator NRC Project Manager - Beaver Valley Power Station NRC Project Manager - Davis-Besse Nuclear Power Station NRC Project Manager - Perry Nuclear Power Plant NRC Resident Inspector - Beaver Valley Power Station NRC Resident Inspector - Davis-Besse Nuclear Power Station NRC Resident Inspector - Perry Nuclear Power Plant Director BRP/DEP Site Representative BRP/DEP Executive

Director, Ohio Emergency Management
Agency, State of Ohio (NRC Liaison)

Utility Radiological Safety Board}}