[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-1 Rev. 4.0 3.6 CONTAINMENT SYSTEMS 3.6.4.1
[Secondary] Containment LCO 3.6.4.1 The [secondary] containment shall be OPERABLE.
NOTE--------------------------------------------
Momentary transients above the [secondary] containment pressure limit are permitted.
APPLICABILITY:
MODES 1, 2, and 3, During movement of [recently] irradiated fuel assemblies in the
[secondary] containment, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. [Secondary] containment inoperable in MODE 1, 2, or 3.
A.1 Restore [secondary]
containment to OPERABLE status.
4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B. Required Action and associated Completion Time of Condition A not met.
B.1
NOTE--------------
LCO 3.0.4.a is not applicable when entering MODE 3.
Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C. [Secondary] containment inoperable during movement of [recently]
irradiated fuel assemblies in the
[secondary] containment or during OPDRVs.
C.1
NOTE--------------
LCO 3.0.3 is not applicable.
Suspend movement of
[recently] irradiated fuel assemblies in the
[secondary] containment.
AND C.2 Initiate action to suspend Immediately Immediately BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-2 Rev. 4.0 CONDITION REQUIRED ACTION COMPLETION TIME OPDRVs.
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-3 Rev. 4.0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1
[ Verify [secondary] containment vacuum is
[0.25] inch of vacuum water gauge.
[ 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.2 Verify all [secondary] containment equipment hatches are closed and sealed.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
SR 3.6.4.1.3 Verify one [secondary] containment access door in each access opening is closed, except when the access opening is being used for entry and exit.
[ 31 days OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0
[Secondary] Containment 3.6.4.1 General Electric BWR/4 STS 3.6.4.1-4 Rev. 4.0 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.4
[ Verify [secondary] containment can be drawn down to [0.25] inch of vacuum water gauge in
[120] seconds using one standby gas treatment (SGT) subsystem.
[ [18] months on a STAGGERED TEST BASIS for each subsystem OR In accordance with the Surveillance Frequency Control Program ] ]
SR 3.6.4.1.5 Verify the [secondary] containment can be maintained [0.25] inch of vacuum water gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem at a flow rate
[4000] cfm.
[ [18] months on a STAGGERED TEST BASIS for each SGT subsystem OR In accordance with the Surveillance Frequency Control Program ]
BWROG-129, Rev. 0