Acceptance Review Determination - 2016/11/30 E-Mail from R. Guzman to W.C Raft Proposed Exemption from Appendix R, Section Iii.G, Fire Protection of Safe Shutdown Capability
ML16335A277
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/2016
From: Richard Guzman
Plant Licensing Branch 1
To: Craft W
Dominion Nuclear Connecticut
Guzman R
References
CAC MF8789
Download: ML16335A277 (2)


Text

From:

Guzman, Richard To:

"wanda.d.craft@dom.com" Cc:

RidsNRRLIC109 Resource

Subject:

Acceptance Review Determination - Millstone Unit 2 - Proposed Exemption Request re: 10CFR50, Appendix R, Fire Protection of Safe Shutdown Capability (CAC No. MF8789)

Date:

Wednesday, November 30, 2016 12:39:50 PM

Wanda, The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of the subject exemption request.

By letter dated October 28, 2016 (ADAMS Accession No. ML16305A330), Dominion Nuclear Connecticut, Inc. (DNC) submitted a letter requesting approval for an exemption from the provisions of 10 CFR 50, Appendix R, Section III.G, Fire Protection of Safe Shutdown Capability, for Millstone Power Station, Unit 2 (MPS2. Specifically, the proposed exemption would allow the use of operator manual actions in lieu of the requirements of 10 CFR 50.12(a)(2)(ii) on the basis, in part, that the application of Appendix R, III.G.2 in this particular would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule.

The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed DNCs application and concludes that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which will be in November 2017. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date (greater than a month) or significant changes in the forecasted hours (greater than 25%), the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

Please contact me if you have any questions/concerns.

Thanks,

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Rich Guzman Sr. PM, Division Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Office: O8E-10 l Phone: (301) 415-1030 Richard.Guzman@nrc.gov