ML17053C699
| ML17053C699 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/17/1981 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lempges T NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML17053C701 | List: |
| References | |
| NUDOCS 8107060241 | |
| Download: ML17053C699 (4) | |
See also: IR 05000220/1981011
Text
~R REO(g,
(4
~
C
Docket. No. 50-220
JUN 17
1931
IE FEE "Opy
Niagara
Mohawk Power Corporation
ATTN:
Mr: T.
E.
Lempges
Vice President
Nuclear Generat.ion
300 Erie Boulevard West
Syracuse,
13202
t
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA19406
Gentlemen:
Subject:
Inspection
50-220/81-11
This refers to the routine safety inspection
conducted
by Mr. S.
K. Chaudhary of
this office on May 12-15,
1981 at Nine Mile Point Unit 1, Scriba,
New York of
activities authorized
by
NRC License
No.
and to the discussions
of our
findings held by Mr. Chaudhary with Mr. T. Perkins of your staff at the con-
clusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the
inspector.
Within the
scope of this inspection,
no items of noncompliance
were observed.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
inspection report will be placed in the
NRC's Public
Document
Room.
If this report contains
any information that you (or your con-
tractors) believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is
necessary
that you (a) notify this office by telephone within ten (10) days
from
the date of this letter of your intention to file a request for withholding; and
(b) submit within 25 days
from the date of this letter
a written application to-
this office to withhold such information.
Consistent with section 2.790(b)(1),
any such application
must
be accompanied
by an affidavit executed
by the owner
of the information which identifies the document or part sought to be withheld,
and which contains
a full statement
of the reasons
on the basis which it is
claimed that the information should
be withheld from public disclosure.
This
section further requires
the statement
to address
with specificity the con-
siderations
listed in 10 CFR 2.790(b)(4).
The information sought to be withheld
shall
be incorporated
as far
as possible into
a separate
part of the affidavit.
If we do not hear
from you in this regard within the specified periods noted
above,
the report will be placed in the Public Document
Room.
The telephone
notification of your intent to request withholding, or any request for an extension
of the
10 day period which you believe necessary,
should
be
made to the Supervisor,
Files Mail and Records,
USNRC Region I, at (215) 337-5223.
Bi0706024i Bi06i7,
ADOCK 05000220
g 8
~O
P
Niagara
Mohawk Power Corporation
No reply to this letter is required;
however,
should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
~~p<<k~'('" j
~~/Thomas
T.
Ma tin, Chief, Engineeririg
Inspection
Branch, Division of
Engineering
and Technical
Inspection
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-220/81-11
cc w/encl:
T. Perkins,
General
Superintendent,
Nuclear Generktion
T.
Roman, Station Superintendent
R. Abbott, Operations
Supervisor
E.B.
Thomas, Jr.,
Esquire
~ Jt'