ML17059A170

From kanterella
Revision as of 12:00, 9 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-220/93-26 During Week of 931115.Non Cited Violation Noted.Failure to Follow Procedures Noted
ML17059A170
Person / Time
Site: Nine Mile Point 
Issue date: 01/06/1994
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059A171 List:
References
NUDOCS 9401140143
Download: ML17059A170 (6)


See also: IR 05000220/1993026

Text

Docket No. 50-220

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

301 Plainfield Road

Syracuse,

New York 13212

Dear Mr. Sylvia:

SUBJECT:

EXAMINATIONREPORT NO. 50-220/93-26 (OL)

During the week of November 15, 1993, the NRC administered initial examinations to

employees of your company who had applied for licenses to operate the Nine Mile Point

Nuclear Station, Unit 1. At the conclusion of the examinations,

the preliminary findings

were discussed

with those members of your staff identified in the enclosed report.

Four of the six applicants passed

the initial examinations.

Section 3.0 of the enclosed report

contains additional details of the applicants'erformance

and the NRC

examiners'bservations.

Allof the applicants passed

the dynamic simulator portion of the operating

test; however, the performance of the crews was weak in response

to a loss of all reactor

water level indication.

You are requested

to review the individual examination results

provided to Mr. R. Smith in a letter dated December 21, 1993, for generic training

weaknesses.

After your review is complete, we would like to meet with you to discuss the

results of your review.

Several minor mistakes were made by an applicant and NRC examiners during administration

of the examinations that resulted in failure to follow the Radiation Work Permit (RWP)

procedure.

'Based on the prompt identification by the licensee and immediate corrective

action, the failure to follow procedures

was considered

a non-cited violation.

In accordance with 10 CFR 2.790 of the Commission's regulations,

a copy of this letter and

its enclosure will be placed in the NRC Public Document Room.

~~~> xoog~

VPBR

gag~

~AORS ()g

CH 05000220

pna

OFFICIALRECORD COPY

G:NM9326.ER

Mr. B. Ralph Sylvia

JAN

6

":3"i

Should you have any questions regarding this information, please contact Richard Conte at

(215) 337-5210.

Sincerely,

~

'"'1

/

/.

Marvin W. Hodge, I3irector

Division of Reactor Safety

~

Enclosure:

Examination Report No. 50-220/93-26 (OL)

w/Attachments

1-5

Attachments:

1.

RO Examination and Answer Key

2.

SRO Examination and Answer Key

3.

Facility Comments on Written Examinations (w/o references)

4.

NRC Resolution of Facility Comments

5.

Simulation Facility Report

cc w/encl; w/o Attachments

1-5:

C. Terry, Vice President - Nuclear Engineering

M. McCormick, General Manager, Safety Assessment,

Licensing & Training

K. Dahlberg, Unit 1 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Energy 8c Water Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

NRC Resident Inspector

State of New York, SLO Designee

OFFICIALRECORD COPY

G:NM9326.ER

Mr. B. Ralph Sylvia

cc w/encl and Attachments

1-5:

R. Smith, Training Manager

R. Sanaker,

General Supervisor - Operations Training (NMP1)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

bcc w/encl; w/o Attachments

1-5:

T. Walker, DRS

R. Miller, Sonalysts

D. Odland, Sonalysts

OL Facility File

bcc w/encl and Attachments

1-5:

Master Exam File

bcc w/encl; w/o Attachments

1-5:

Region I Docket Room (with concurrences)

bcc w/encl; w/o Attachments

1-5: (VIAE-MAIL)

V. McCree, OEDO

D. Brinkman, NRR/PDI-1

R. Gallo, Chief, OLB, NRR

R. Bores, DRSS

J. Furia, DRSS

VIAE-MAILand no attached file:

R. Conte, DRS

C. Cowgill, DRP

T. Walker, DRS

RI:DRS

Wggkr

l

12'/93

RI:DRS

RI:DRS

Conte

Hodges

12/t9'93

g~,~, 12'/93

OFFICIALRECORD COPY

G:NM9326.ER