L-80-214, Provides Interim Response to IE Bulletin 80-08, Examination of Containment Liner Penetration Welds. Facility Utilizes Flued Head Design Penetration Connections.Records Under Review.Tables Encl
| ML17208A827 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/07/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-08, IEB-80-8, L-80-214, NUDOCS 8007210060 | |
| Download: ML17208A827 (15) | |
Text
P.O. BOX 529100 MIAMI,F L 33152 FLORIDAPOWER & LIGHT COiYiPANY July 7, 1980 Mr. James P. O'Reilly, Director,.Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Rei lly:
Re:
St. Lucie Unit 2 Docket 50-389 IE Bulletin 80 Examination of Containment Liner Penetration Welds Florida Power 8 Light Company has reviewed IE Bulletin 80-08 in regard to ultrasonic examination of containment penetration welds with likelihood of undetectable indications.
As requested in item 1 of the Bulletin, our facility utilizes the flued head design for penetration connections and also the other design with containment boundary buttweld between the penetration sleeve and process piping.
We are presently investigating the records on the subject welds on penetrations at the vendor's facility and the field to obtain necessary information requested in the Bulletin.
However, the enclosed Attachment 1 provides information relative to it;em 2c of the Bulletin that is now available.
Additional information requested in the Bulletin per items 2a, b, d and 3 as applicable, will be provided upon completion of our investigation.
This will serve as our interim response to IE Bulletin 80-08 and our final response to this Bulletin will be submitted prior to September 30, 1980.
Very uly yours, obert E. Uhrig Vice President Advanced Systems 8 Technology REU/PP/ah Attachments cc:
U. S. Nuclear Regulatory Commission Director, Division of Reactor Construction Inspection Washington, D.
C.
20555 Harold F. Reis, Esquire O~~le O6o Gl'FICIALCOpy PEOPLE... SERVING PEOPLE
ATTACHMENT 1 Sheet 1 of 13 FLORIDA POWER 6 LIGIIT COMPANY ST LUCIE UNIT 2 CONTAINMENT VESSEl PIPING PENETRATION WELDS Pcn.
Pen No.
pe System Meld Io.
Meld Type Meld P
D,D.
(in)
Thick (in) Proces.
Pi c Sl Flued Back LVOE Vendor Field NOE Field Results of Examina Field:
I Hain Steam Butt 60.0 3.0 SA106 SA 516 SA105 GR.B GR..70 GR JI Vendor:
Fields I
Hain Steam Butt
Field:
I Feedvater Butt 45.0 2.25 Sh 10 GR. B SA 516 SA 10 GR 70 GR IJ Vendor:
Fieidl I
Feed+ate r
ield 5
III Bio+down Butt.
12.75 0.687 Sh 106 Sh 106 SA105 GR.B GR.B endor:
ield:
6 III Blovd%n Butt 12.75 0.687 SA 106 SA 106 GRB ORB SA 10.
cndOrl
Sheet 2 of 13 FLORIDA POWER C LIG)IT CONPANY ST LUCIE UNIT 2 CONTAINNENT VESSEL PIPING PENETRATION WELDS Pen No Pen System pe l eld Lo.
{in)
Thick
{in) Proces Pi e
Flued Back Vendo NDE Field vendor Field Results of Examina i Fields II Prim Water Supply Butt 4.5
- 0. 337 SA 312 Tp 304 SB564 Vendors Fieldt Station Air Sv,~ply Butt 4.5 0.337 SA 106 GR. B SA234 GRWPB Vendors Field:
Instrument Air Supply Butt 4.5 0.337 SA 31 Tp 304 Vendors Field:
10 W 6 V Contain-mcnt purge Flange 48.0 2.5
'A 516 GR 70 Vendor>
ield:
N S V Contain-ment purge Flange 48.0 2 I 5 SA 516 GR.70 endor'eld:
12 This No. is not used a
endor'
Sheet 3 of 13 FLORIDA POMER 4 LIGliT CONPAttY ST LUCIE UNIT 2 CONTAINMENT VESSEL PIPING PENETRATION MELDS Pen.
System tto.
pe Meld So.
Meld Type Held P
DoD.
(in)
Thick
{in) Proces.
Pi Flued Back Vendo OD NDE Field Field Jendor Results of Examin Fields 13 This No. is not used.
Vendort Fieldt 14 I
Nitrogen Supply Butt 4.5 0.337 SA 312 Tp 304 SB 167 Vendort Field:
15 I
CCH Return Fa Cooler Butt 8.625 0.906 SA 106 GR. B Vendor:
Held:
16 II CCH Supply Fan Cooler Butt 8.625 0.906 SA 106 GR.B Vendor:
ieldt 17 I
CCM Return Fan Cooler Butt 8.625 0 906 SA 106 GR.B endort 18 I
I CCM Supply Fan Cooler Butt 8.625 0.906 SA 106 GR B ieldt endor:
~
~
e
~
Sheet 4 of 13 FLORIDA POWER 6 LIGHT COMPANY ST LUCIE UNIT 2 CONTAINMENT VESSEL PIPING PENETRATION MELDS Pen.
Pen No.
pe System Held Lo..
Held TyPe Head P
O,D.
(in)
Thick Process Pi e 8
Flued Back Vendor Field NDF Field Jendor Results of Examinat Fields 19 II CCM Return F n Cooler Butt 8 '25
- 0. 906i SA 106 CiRe 0 Vendor:
Fields 20 II CCH Supply Ra Cooler Butt 8.625 0.906 SA 106 CR.B Vri~
Field:
21 II CCH Return Fa Cooler Butt 8.625 0.906 SA 106 CiReB Vendor:
Field:
22 II CCH Supply Fan Cooler Butt 8.625
- 0. 906 SA 106 CReB Vendors ield:
23 II Hater Supply Reactor Cool-ant Pumps Butt 8.625 0 ~ 906 SA 106 CR. B endor<
ieldc 24 II Hater Return Reacto~ool-ant Pumps Butt 8.625 0.906 SA 106 GR.B endor:
~
~
Sheet 5 ot 13 FLORIDA POWFR S LIGllT COHPAtty ST LUCIS DNIT 2 CONTAINtlENT VESSEL PIPING PENETRATION WELDS Pen.
Pen No ype System Weld Io.
Weld Type lteld P
P,D.
(in)
Thick Process (in)
Pi c S
Flued CODE Back Vendor Field Vendor Field Results of Examinati Field:
25 V
Fuel transfe tube 48.0
1.0 Vendor
Field:
26 III Letdown line Butt 12.75 1.312 SA 312 Tp 304 SA 106 GRoB SA 182 GRF304 Vendort Field:
27 III Charging line Butt 10.75 1.)25 SA 312 Tp 304 SA 106 GR B SA 182 GRF304 Vendor:
Field:
28 JJ Sampling hot lag.
Butt
- 6. 625 0.432 SA 106 GR.B Vendor:
ieldt 29 II Sampling pressurispr steam space.
Butt 6.625 0'32 SA 106 endor:
30 II BlowdoA Butt 6.625 0 ~ 432 SA 106 ield:
endor:
Sheet 6 of 13 FLORIDA POWER 6 I IGIIT EOHPhtty ST LUCIE UNIT 2 CONTAINHENT VESSEL PIPING PENETRATION WEI DS Pen No Pen pe System t'eld Lo.
(in)
Thick Process (in)
Pi e
Flued Back Vendo CVOE Field ttDE vendor Field Results of Examine Field:
31 II ontainment Vent header Butt 2.375
- 0. 343 SA 312 Tp 304 Vendort Field:
32 IV Containment Sump. Suet.
Butt 34.0 1.50 SA 358 Tp 304 Cl.I SA 516 GR.70 SA 182 F 304 Vendort Field:
33 IV Containment sump. suet.
Butt 34.0 1.50 SA 358 Tp.304 Cl ~ I SA 516 GRo70 SA 182 F 304 Vendors Field:
34A Containment spray Butt 10.750 0.593 C.S Vendors ieldg 35A Containment spray Butt 10.750 0.593 C S endor:
ield!
348 II Containment spray This penetr tion conn ctcd t pipe endor:
Sheet 7 of 13 FLORIDA POWER C I,IGHT, COHPANY ST LUCIE UNIT 2 CONTAIHHENT VESSEl PIPING PENETRATION WELDS a
C.ODE Pen Ho Pen pe System Veld Soi Weld Type Held P
OeD-
{in)
Thick (in) Proces Pi e Flued Back Vendo Field Vendor Field Results of Examinati Field:
358 Containment Spray This conn enetra ted to ion pipe Vendors Pl~id:
36 Safety injec-tion loop Butt 18.0 1.75 SA 312 SA 106 SA 182 Tp 304 GR.B GRF304 Vendor:
Fields 37 Safety injec-tion loop Butt 18.0 1.75 SA 312 SA 106 SA 182 Tp 304 GR B GRF304 Vendor:
38 Safety injec-tion loop Butt 18.0 1.75 SA 312 SA 106 SA 182 Tp 304 GR.B GRF304 Fioldl Vendor:
ield:
39 Safety injec-tion loop Butt 18.0
ield:
40 Shutdown cooliyp Butt 24.0
Sheet 8 of 13 FLORIDA POWER 6 LIGIIT,COHPAtty ST LUCIE UNIT 2 CONTAINttENT VESSEL PIPING PENFTRATION MELDS Pen.
Pen tlo.
pe System Weld aoe Weld Type Weld P
D,D.
(in)
Thick Procc3s
{in)
Pi e Flued Back Vendo Field NDE vendor Field Re lt of E s Field:
41 III afety injec-tion tank test Butt 8.625 0.906 SA 312 Tp 304 SA 106 GR.B SA 182 GR.F30 Vendor:
Fieldl 42 II Cont.
sump pump discharg Butt 3.50 0.438 SA 312 Tp 304 Vendors Fieldl 43 IV Rea=tor drain pump suction 8.625 0.500 SA 358 Tp 304 SA 516 GR.70 SA 182 F 304 Vendor:
Field:
44 III Reactbr cool-ant pumps con trolled bleed off Butt 6.625
leld:
45 II Diff. press.
between insid containment 6
eius Butt 6.625 0.432 SA 106 GR.B endor:
ieldt 46 II Refuef cavity pirif. inlet 6.625 0.432 SA 312 Tp.304 endor:
Sheet 9 of 13 FLORIDA POWER 4 LIGIIT:COttPAtSY ST LUCIE UNIT 2 CONTAINHENT VESSEL PIPING PENETRATION MELDS Pen Pen tlo.
pe System Weld ho ~
Meld Meld P
0+DAN (in)
Thick (in) Proces Pi e Flucd Back Vendor C.
DE NDt'ield Vendor Field Results of Examinat Field s 47 II Refuel cavity psrif. outlet Butt
- 6. 625
- 0. 718 SA 312 Tp 304 Vendors Fields 48 II tt2 sampling Butt 6.625 0.864 SA 106 GR ~ 8 Vendors Field:
49 II Blcwdovn Butt 6.625 0.375 SA 106 GR. 0 Vendors Fields 50 spare 14.0 0.750 Vendor:
ields 51 II N2 sampl ing Butt 6.625 0.864 SA 106 GR,B endors icld s 52 II Integrated leak rate testptnstrum-entation Butt 12;75 1.312 SA 106 GR 8 endor:
Sheet l0 nf 13 FLORIDA POWER L LIGNT COMPANY ST LUCIS UNIT 2 CONTAINMENT VESSEL PIPING PENETRATION WELDS Pen No Pen ype SYstem lel lo.
Weld Type Meld P
O,D.
(in)
Thick (fnl Process Pie 8
v Flued CODE Back Vendor Field N0F'ield Vendor I!6 lilt. oE Exdhlk tJQg Field:
53 II Diff. press.
hntween in-side contain-ment 6 annulu Butt 6.625 0.432 SA 106 OR+ 8 Field:
54 II Integrated leak rate testing Butt 16.0 1.0 SA 106 GR.B Vendor:
Field:
55 spare 4.500
- 0. 531.
Vendor:
Fiel<1:
56 II N a V purge inlet Butt 8.625 0.906 C.S.
Vendor:
ield:
57 II N
S V purge outlet Butt 8.625 0.906 C.S.
endor:
58 0
spare 4.500 0,53I ield:
endor:
Slreet ll of 1'LORIUA POWER 4 LIGIIT.CONPANY ST LUCIE UNIT 2 CONTAINMENT VESSEl PIPING PENETRATION WE)4)S Pen No.
Pen ype System Weld Io.
Weld Type Meld P
O.n.
{in)
Thick
{in) Proces Pi c Sl Flucd Back Vendo x)UE NDE Field
~cn<lor Field Results of Exaninpti Field:
59 Shcild bldg.
vent Vendor:
Field:
60 Sheild bldg.
vent Vendor:
Field>
61 Spare Vendors Field:
62 lntsrument air to const.
hate Vendors ieldg 63 This number not used-endor'ield g
64 Shutdown cooling u)
Butt 24.0
Sheet 12 of FLORIDA POWER S LIGtlT COHPANY ST LVCIE UNIT 2 CONTAINNENT VESSEL PIPING PENETRATION WELDS Pen No Pen pe System Weld Lo.
Do D.
(in)
Thick (in) Process Pi e
8 Flued Back Vendor Field NDE vendor Field Results of Examinati Field:
65 Spare Vendor!
Fields 66 Spare Vendor:
Fields 67 VI N 6 V vacuum relief Vendors Field:
68 VI II 6 V vacuum relief 24.0 0.750 Vendor:
ield:
69 Wst leg.
2B in)ection Butt 10.750
~R F304 endor:
ield:
70 lIot leg.
2B in)ection Butt 10.750
- 1. 125 Sh 312 Sh 106 Tp.304 GR.B SA 182
,R.F304 endor:
Shrr t I3 of FLORIDA POWEP.
L LIGIIT COMPANY ST LUCIE UNIT 2 CONTAINMENT VESSEl PIPING PENETRATION WELDS l'en.
Pen No ype System Weld lho.
Oo D.
lin)
Thick
{inl Process Pi c S
Flucd Back Vendo Field vendor Field Results of Examinati ~
Field:
71 Spare R.625 0'06 Vendor:
Field I 72 Spare 8.625 0.906 VendorI FieldI Vendor:
Field:
Vendor:
ield:
endorI ieldi