Forwards IE Insp Rept 50-389/81-01 on 810120-23.No Noncompliance Noted
ML17209A827
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/11/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17209A828 List:
References
NUDOCS 8103190040
Download: ML17209A827 (4)


See also: IR 05000389/1981001

Text

~pe RECOF

~gt ')(

~G+

9p0

4p

ClO

UNITED STATES

, NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report No

0-389/81-1

This refers

to the routine inspection

conducted

by J.

R. Harris of this office

on January

20-23,

1981, of activities authorized

by NRC Construction Permit No.

CPPR-144 for the St. Lucie facility, and to the discussion of our findings held

with W. Escue at the conclusion of the

inspectfon.'reas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within "these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.,

We have

examined

actions

you have

taken with regard

to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10,

Code of Federal Regulations,

a copy of, this letter and the enclosed inspection

report will be placed in the NRC's IPublic Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document.. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Mur

y, Chic

Reactor Construction

and Engineering

Support Branch

Enclosure:

See

Page

2

83.03 x 9 uQ

Florida Power

and Light Company.

- FE8<ites>

Enclosure:

Inspection Report No. 50-389/81-1

cc w/encl:

C.

M. Wethy, Plant Manager

Nat Weems, Assistant

QA

Construction

Manager

~ 4