Amend 49 to License DPR-67,correcting Inconsistency Re Valve Closure Time of Instrument Air Containment Isolation Valve & Adding Flow Path Verification of Sodium Hydroxide Containment Spray Additive Sys
ML17212B532
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/12/1982
From: Clark R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17212B533 List:
References
NUDOCS 8204220511
Download: ML17212B532 (10)


Text

~too e

p

~

o

. ~ S 1

~++

~~

o gh ui"Tzo s~ ',TEs

"'UcLHFt REGULA 'O'RY CO

.! 'i'...'

W'HI!i'QTO'l,D. C. 2.'-5 FLORIDA P04'ER E

LIGHT CO.".PANY DOCVET tt0. 50-335 ST:

LUCIE PLANT, UNIT NO.

1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 49 License t<o.

DPR-67 1.

The A.

B.

C.

E.

Nuclear Regulatory Commission (the Commission) has found that:

The applications for amendment by Florida Power and Light Company (the licensee) dated February 9,

1979 (as supplemented January 19,

. 1981) and February 21, 1979 comply with the standards and requirements of the Atomic Energy Act 'of 1954, as. amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii') that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comni.ssion's regulations and all applicable requirements have been satisfied.

8204220511" 820412 PDR ADOCK 05000335 PDR

r

~

+f 2.

Accordingly, Facility Operating License No.

DPR-67 is amended by changes to the Technical Specifications as indicated in the Attach-ment to this license amendment, and:

A.

Revise'paragraph 2.C(2) to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 49

, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

B.

Delete in its entirety Condition g of Enclosure 1 appended to the license.

3.

The license amendment is effective as of the date of its issuance.

FOR 'THE U; S..NUCLEAR REGULATORY COMMISSION Attachement:

'hanges to the Technical

. Specifications Date of Issuance; April 12, 1982 Robert A. Clark, Chief Operating Reactors Branch P3 Division of Licensing

~

~

D'

~

~

a ATTACHMENT TO LICENSE AMENDMENT NO.

49 FACILITY OPERATING LICENSE NO.

DPR-67 DOCKET NO. 50-335 Replace the following pages of the Appendix'A" Technical Specifications with the enclosed pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

.The corresponding overleaf pages are also provided to maintain document completeness.

I

~Pa es 3/4 3-16 3/4 3-17 3/4 6-16b

TABLE 3.3'-4 Continued ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUHENTATION TRIP VALUES FUNCTIONAL UNIT 6.

LOSS OF POWER 4.16 kv Emergency Bus Undervoltage (Undervoltage relays) 7, AUXILIARY FEEDWATER TRIP VALUE

> 3307 volts

> 30K level ALLOWABLE VALUES

> 3307'olts

> 30$

1 evel

TABLE 3.3'-5

'ENGINEERED SAFETY FEATURES

RESPONSE

TINES

, INITIATINGSIGNAL AND FUNCTION 1.

Manual a.

SIAS'afety Injection

{ECCS}

Containment Fan Coolers Feedwater Isolation Containment Isolation b.

CSAS Containment Spray c.

CIS

~Containment Isolation Shield Building Yentilation System d.

RAS Containment Sump Recirculation e.

MSIS Main Steam Isolation Feedwater Isolation-2.

Pressurizer Pressure-Low a.

Safety Injection (ECCS) b.

Containment Isolation'**

c.

Containment Fan Coolers d.

Feedwater Isolation RESPONSE TINE IN SECONDS Not. Applicabl e Not Applicable Not Appiicable Not Applicable Not Applicable Not Appl'icable Not Applicable Not Applicable Not Applicable Not Applicable

< 30.0*/19.5~

< 30 5*/20 5**

30 0*/1 7 0**

< 60.0 ST..LUCIE - UNIT 1

3/4 3-16 I

I Amendment No. 77, P7, 49

CONTAINMENT SYSTEMS SPRAY ADDITIVE SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.2 The spray additive system shall be OPERABLE with:

a.

A spray additive tank containing a volume of between 4010 and 5000 gallons of between 30 and 32K by weight NaOH solution, and b.

Two spray additive eductors each capable of adding: NaOH solution from the chemical additive tank to a containment spray system pump flow.

APPLICABILITY:

MODES 1, 2 and 3.*

ACTION:

With the spray additive system inoperable, restore the system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or'e in at least HOT STANDBY within the next 6

hours; restore the spray additive system to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.6.2.2 The spray additive system shall be demonstrated OPERABLE:

a ~

b.

c ~

At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or.otherwise secured in position, is in its correct position.

At least once per 6 months by:

l.

Verifying the contained solution volume in the tank, and 2.

Verifying the concentration of the NaOH solution by chemical analysis.

'At least once per 18 months, during shutdown, by verifying that each automatic valve in the flow path actuates to its correct position on a

CSAS test signal.

  • pp ica e when pressurizer pressure is

> 1750 psia.

ST.

LUCIE - UNIT 1

.3/4 6-16a Amendment No. 26

CONTAINMENT SYSTEMS SPRAY ADDITIVE SYSTEM SURVEILLANCE RE UIREMENTS Continued d.

At least once per five years by verifying a sodium hydroxide (NaOH) flow rate of

+

gpm from the spray additive tank to a drain connection immediately downstream of the tank outlet valve, and a

demineralized water flow rate of

+

gpm from that same drain connection to each containment spray pump.

(Flow rates and tolerances for each of these two sources will be provided within six months following restart from the 1983 refueling outage.)

ST LUGIE - UNIT 1

3/4 6-16b l

Amendment No.

49

TABLE.3. 3-5 Continued ENGINEERED SAFETY FEATURES RESPONSE. TIMES INITIATINGSIGNAL AND FUNCTION 3.

Containment Pressure-Hi h

a.

Safety Injecti on (ECCS) b.

Containment Isolation***

c.

Shield Building Ventilation System d.

Containment Fan Coolers e;

Feedwater Isolation 4.

Containment.Pressure--Hi h-Hi h

a.

Containment Spray

RESPONSE

TIME IN SECONDS

< 30.0*/19.5**

< 30.5*/20.5~

3P P*/14 P**"

3P P*/17 P**

< 60.0

< 30.0*/18.5**

5.

Containment Radiation-Hi h

a.

Containment Isol ation ***

b.

Shield Building Ventilation System 6.

Steam Generator Pressure-Low a.

Main Steam Isolation b.

Feedwater Isolation 7.

Refuelin Water Stora e Tank-Low a'.

Containment Sump Recircul ation

< 30.5*/20.5**

< 30.0*/14.0**.

< 6.9

< 60.0

< 91.5

~

~

8.

Steam Generator 'Level a.

Auxiliary feedwater

> 180,

< 600 TABLE NOTATION

  • Diesel generator starting and sequence loading delays included.
    • Diesel generator starting and sequence loading delays not included.

Offsite power available.

      • Notapplicable to containment isolation valve I-MV-18-1.

II ST

. LUCIE -'NIT 1

3/4 3-12 Amendment No.

$g; p/

49

TABLE 4.3-2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION.SURVEILLANCE RE UIREMENTS FUNCTIONAL UNIT CHANNEL CHANNEL CHECK CALIBRATION CHANNEL FUNCTIONAL TEST MODES IN WHICH SURVEILL'ANCE RE UIRED

~

1.

SAFETY INJECTION. (SIAS) a.

Manual (Trip Buttons) b.

Containment Pressure

- High c.

Pressurizer Pressure

- Low d.

Automatic Actuation Logic 2.

CONTAINMENT SPRAY'CSAS) a.

Manual (Trip Buttons) b.

Containment Pressure High - High c,

Automatic Actuation Logic 3.

CONTAINMENT ISOLATION (CIS) a.

Manual.(Trip Buttons}

b.

Containment Pressure - High c.

Containment Radiation - High d.

Automatic Actuation Logic e.

SIAS N.A.

S

.S N.A.

N.A.

S N.A.

N.A.

S S

N.A.

N.A.

N.A.

R R

N.A.

N;A.

R N.A.

N.A.

R R

N.A.

N.A.

R M(1)

M M(1)

R M

M M(1)

R N.A.

1, 2, 3

1, 2, 3

1, 2, 3

N.A.

1, 2, 3

1, 2, 3

N.A.

1;2,3 l,g,3,4 1, 2, 3

N.A.

4....MAIN STEAM LINE ISOLATION (MSIS) a.

Manual. (Trip Buttons}

N.A.

b.

Steam Generator Pressure

- Low S

c.

Automatic Actuation Logic N.A.

N.A.

R N.A:

R M

M(1)

N.A.

1, 2, 3

1, 2, 3

5.

CONTAINMENT SUMP RECIRCULATION RAS) a.

. Manual RAS Trip Buttons) b.

RefUeling Mater Storage Tank - Low c.

Automatic Actuation Logic N.A.

S N.A.

N.A.

R N.A.

M.

M(1)

N.A.

1, 2, 3

1, 2; 3