ML17276A163
| ML17276A163 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/23/1981 |
| From: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Matlock R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17276A164 | List: |
| References | |
| NUDOCS 8111050599 | |
| Download: ML17276A163 (4) | |
See also: IR 05000397/1981017
Text
OCT 23 t98l
Docket No.,50-397
~Hj~zc0pg.
Washington Public Power Supply System
P. 0.
Box 968
Richland,
99352
Attention:
Mr. R.
G. Matlock
Program Director, WNP-2
Gentlemen:
-"elf II'g
~
NOVO'98/~
U.4. NVC12AE E2SIEA~
.COIMIg~y
e~mI
gg~
I
>C)
ann
QO
ncn
OVII
Qw
QI
OO
DMlQ
U%Q
Q
Subject:
NRC Inspection at Washington Nuclear Project
No.
2
This refers to the inspection
conducted
by Mr. R. T. Dodds, J. 0. Elin,
D. P, Haist,
D. F. Fox,
W. J.
Wagner
and A. J. D'Angelo of this office
on August 31 to September
4, )981 of activities authorized
by NRC Construction
Permit No. CPPR-93,
and to the discussion of their findings with yourself
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No items of noncompliance with NRC requirements
were identified within
the scope of this inspection.
Perceived
weaknesses
and strengths
have
been identified in the summary section of the enclosed
in'spection report.
In accordance
with 10 CFR 2.790 of the Comission's regulations,
a copy
of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this report contains
any information that
you (or your contractors)
believe to be exempt from disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you (a) notify this office by telephone
within ten
(10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within 25 days from the
date of this letter
a written application to this office to withhold such
information. If your receipt of this letter has
been
delayed
such that
less than seven
(7) days are available for your review, please notify this
office promptly so that
a new due date
may be established.
Consistent
~ I
with section 2.790(b)(1),
any such application must be accompanied
by an
affidavit executed
by the owner of the information which identifies the
document
or part sought to be withheld,
and which contains
a full statement
of the basis
on which it is claimed that the information should
be withheld
.from public disclosure.
This section further requires the statement
to
address with specificity the considerations
listed in 10 CFR 2.790(b)(4).
OFFICE/
SURNAME)
OATEf>
RV/dot
~ ~ ~ ~ ~ ~ J'
~
~
~ ~ ~
~
~
~ ~ ~
~ ~
10/W/81
IIIST'jQ","-""
0/g5/81
FQQ
t
~ ~ ~
~
10/g/
1
~ gQ
~oo~i ~ ~ ~ ~
~ ~ ~ ~
~ ~ ~ ~
~ ~
~ ~ ~ I ~ ~ ~
10/~81
~
10/Zg/81
.AU).KP ..BP,RRY
0/g%/81
NRC FORM 818110/801 NRCM 0240
OFFICIAL RECORD COPY
- USGFO: 198~29 824
q
qq I
r
1
g* r
I
r
~
~
I
1
r
~
~
~
'r
h
'I
h
~ =
1 ~
~
I
I r
I
I
/
rq
~t-
~
~
1
~ 1
~
q
'
I
~
II
q'1
~
'
Washington Public Power Supply System
-2-
()(l7 23 )gg~.
The information sought to be withheld shall
be incorporated
as far as possible
into a separate
part of the affidavit. If we do not hear from you in this
regard within the specified periods noted
above, the report will be placed
in the Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad
to discuss
them with you.
Sincerely,
Enclosure;
IE Inspection Report
No. 50-397/81-17
cc w/o
enclosure.'.
B. Glasscock,
W, C. Bibb,
G. C. Sorensen,
bcc:
DMB/Document Control Desk
(RIDS)
Distributed by RV:
State of WA (Lewis)
RHE (w/o enc)
Resident Inspectors
(3)
B.
H. Faulkenberry,
Chief
Reactor
Construction
Prospects
Branch
(20'1'H) )l2ea
I'O ffft03 fl]99930GgNQ:gad
- VR gid befUdiwfziG
(vr>,eJ) Kv'to elide
{~~e okapi)
3HR
(8) a~o~oeqanI
foahraeH