ML17276A163

From kanterella
Revision as of 08:18, 8 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/81-17 on 810831-0904.No Noncompliance Noted
ML17276A163
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/23/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17276A164 List:
References
NUDOCS 8111050599
Download: ML17276A163 (4)


See also: IR 05000397/1981017

Text

OCT 23 t98l

Docket No.,50-397

~Hj~zc0pg.

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. R.

G. Matlock

Program Director, WNP-2

Gentlemen:

-"elf II'g

~

NOVO'98/~

U.4. NVC12AE E2SIEA~

.COIMIg~y

e~mI

gg~

I

>C)

ann

QO

ncn

OVII

Qw

QI

OO

DMlQ

U%Q

Q

Subject:

NRC Inspection at Washington Nuclear Project

No.

2

This refers to the inspection

conducted

by Mr. R. T. Dodds, J. 0. Elin,

D. P, Haist,

D. F. Fox,

W. J.

Wagner

and A. J. D'Angelo of this office

on August 31 to September

4, )981 of activities authorized

by NRC Construction

Permit No. CPPR-93,

and to the discussion of their findings with yourself

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

Perceived

weaknesses

and strengths

have

been identified in the summary section of the enclosed

in'spection report.

In accordance

with 10 CFR 2.790 of the Comission's regulations,

a copy

of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this report contains

any information that

you (or your contractors)

believe to be exempt from disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone

within ten

(10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within 25 days from the

date of this letter

a written application to this office to withhold such

information. If your receipt of this letter has

been

delayed

such that

less than seven

(7) days are available for your review, please notify this

office promptly so that

a new due date

may be established.

Consistent

~ I

with section 2.790(b)(1),

any such application must be accompanied

by an

affidavit executed

by the owner of the information which identifies the

document

or part sought to be withheld,

and which contains

a full statement

of the basis

on which it is claimed that the information should

be withheld

.from public disclosure.

This section further requires the statement

to

address with specificity the considerations

listed in 10 CFR 2.790(b)(4).

OFFICE/

SURNAME)

OATEf>

RV/dot

~ ~ ~ ~ ~ ~ J'

~

~

~ ~ ~

~

~

~ ~ ~

~ ~

10/W/81

IIIST'jQ","-""

0/g5/81

FQQ

t

~ ~ ~

~

10/g/

1

~ gQ

~oo~i ~ ~ ~ ~

~ ~ ~ ~

~ ~ ~ ~

~ ~

~ ~ ~ I ~ ~ ~

10/~81

GE

~

10/Zg/81

.AU).KP ..BP,RRY

0/g%/81

NRC FORM 818110/801 NRCM 0240

OFFICIAL RECORD COPY

  • USGFO: 198~29 824

q

qq I

r

1

g* r

I

r

~

~

I

1

r

~

~

~

'r

h

'I

h

~ =

1 ~

~

I

I r

I

I

/

rq

~t-

~

~

1

~ 1

~

q

'

I

~

II

q'1

~

'

Washington Public Power Supply System

-2-

()(l7 23 )gg~.

The information sought to be withheld shall

be incorporated

as far as possible

into a separate

part of the affidavit. If we do not hear from you in this

regard within the specified periods noted

above, the report will be placed

in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad

to discuss

them with you.

Sincerely,

Enclosure;

IE Inspection Report

No. 50-397/81-17

cc w/o

enclosure.'.

B. Glasscock,

WPPSS

W, C. Bibb,

WPPSS

G. C. Sorensen,

WPPSS

bcc:

DMB/Document Control Desk

(RIDS)

Distributed by RV:

State of WA (Lewis)

RHE (w/o enc)

Resident Inspectors

(3)

B.

H. Faulkenberry,

Chief

Reactor

Construction

Prospects

Branch

(20'1'H) )l2ea

I'O ffft03 fl]99930GgNQ:gad

VR gid befUdiwfziG

(vr>,eJ) Kv'to elide

{~~e okapi)

3HR

(8) a~o~oeqanI

foahraeH