Forwards Insp Repts 50-315/98-08 & 50-316/98-08 on 980313- 0427 & Notice of Violation.Three Violations Noted.First Violation Involved Failure to Follow Procedure by Contract Maintenance Workers
ML17334A713
Person / Time
Site: Cook  
Issue date: 05/28/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17334A714 List:
References
50-315-98-08, 50-315-98-8, 50-316-98-08, 50-316-98-8, NUDOCS 9806020117
Download: ML17334A713 (8)


See also: IR 05000315/1998008

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM

(RZDS)

~

ACCESSION NBR:9806020117

DOC.DATE$ 98/05/28

NOTARIZED: NO

FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana

M

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana

M

AUTH,.NAME

AUTHOR AFFXLXATXON

GROBE,J.A.

Region 3'(Post

820201)

RECIP . NAME

RECIPIENT AFFILIATION

SAMPSON,J.

American Electric Power Co., Inc.

SUBJECT: Forwards insp repts

50-315/98-08

Ec 50-316/98-08

on 980313-

0427

&, notice of violation.Three violations noted. First

violation involved failure to follow procedure

by contract

maintenance

workers.

DZSTRXBUTION CODE: IE01F

COPXES RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Xnsp Rept/Notice of Violation Response

NOTES:

DOCKET

05000315

05000316

23

C

RECIPIENT

ID CODE(NAME

PD3-3

PD

XNTERNAL: AEOD/SPD/RAB

DEDRO

NRR/DRCH/HHFB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

XTERNAL: LITCO BRYCE,aT H

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

STANG,J

NRR M /PMCB

NUDOCS-ABSTRACT

OGC/HDS3

NOAC

NUDOCS FULLTEXT

COPXES

LTTR ENCL

1

1

1

1

1

1

1

'

1

1

1

1

1

1

1

1

R

D

0

"~~ggpg PPQN

@pe PgQPPY

h

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPXES

REQUIRED: LTTR

17

ENCL

17

I,ll

(4~S RE0iI

~o

, UNITED STATES

NUCLEAR REGULATORYCOMMISSION

REGION III

801 WARRENVILLEROAD

LISLE, ILLINOIS605324351

May 28,

1998

Mr. John Sampson

Site Vice President,

Nuclear Generation Group

American Electric Power Company

500 Circle Drive

Buchanan, Ml 49107-1395

SUBJECT:

D. C. COOK INSPECTION REPORT 50-'315/98008(DRP); 50-316/98008(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Sampson:

On April27, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2 reactor

facilities. The enclosed report presents the results of that inspection.

During the 6-week period

covered by this inspection report, the inspectors observed that the plant was maintained

shutdown in a safe manner and that shutdown activities were focused on safety.

Based on the results of this inspection, three violations of NRC requirements were identified by

the NRC. The violations are cited in the enclosed Notice of Violation (Notice) ~ and the

circumstances

surrounding them are described in detail in the subject inspection report. The first

violation involved a failure to follow procedure by contract maintenance workers. The violation is

of concern because of the failure of the contract workers to verify the proper bolting configuration

on the

1 CD emergency diesel generator.

The improper bolting configuration could have led, to a

failure on that engine similar to the exhaust manifold bracket failure which caused the 2 AB

emergency diesel generator to become inoperable.

The second violation involved the

inadequate root cause determination by your staff regarding the missing jam nuts.

Your staff's

assessment

determined that the root cause could not be identified, while the NRC inspectors

determined the root cause was due to poor contractor performance.

The third violation involved

the failure of the Unit 2 operators to use a procedure designated as "Continuous Use" at the job

site. The Unit 2 operators were not sure which general plant procedures, ifany, were in use

while operating in Mode 5, and this resulted in the operators failing to continuously use the

procedure as required.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response.

The NRC will use your response,

in part, to

determine whether further enforcement action is necessary

to ensure compliance with regulatory

requirements.

98060201.i7

980528

PDR

ADQCK 05000315

8

PDR

~ 'J5

ll

J. Sampson

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules 'of Practice," a copy of this letter, the

enclosures,

and your response willbe placed in the NRC Public Document Room.

Sincerely,

/s/ J.

A. Grobe

Docket Nos.: 50-315; 50-316

License Nos.: DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

cc w/encls:

1.

Notice of Violation

2.

Inspection Report 50-315/98008(DRP);

50-316/98008(DRP)

Don Hafer, Acting Chief

Nuclear Engineer

Douglas Cooper, Plant Manager

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Emergency Management

Division, Ml Department

of State Police

David A. Lochbaum, Union

of Concerned Scientists

DOCUMENT NAME: G:iCOOKiDCC98008.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy

w/attach/encl "N" = No co

OFFICE

NAME

DATE

Rill

Sch

'

zco

5/

98

Rill

Rll

Gro

5 g/8

5

/98

OFFICIALRECORD CO

Y

J. Sampson

Distribution:

Project Mgr., NRR w/encls

C. Paperiello, Rill w/encls

J. Caldwell, Rill w/encls

B. Clayton, Rill w/encls

SRI DC Cook w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rill PRR w/encls

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)