ML17334A713
| ML17334A713 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/28/1998 |
| From: | Grobe J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sampson J AMERICAN ELECTRIC POWER CO., INC. |
| Shared Package | |
| ML17334A714 | List: |
| References | |
| 50-315-98-08, 50-315-98-8, 50-316-98-08, 50-316-98-8, NUDOCS 9806020117 | |
| Download: ML17334A713 (8) | |
See also: IR 05000315/1998008
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RZDS)
~
ACCESSION NBR:9806020117
DOC.DATE$ 98/05/28
NOTARIZED: NO
FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana
M
50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana
M
AUTH,.NAME
AUTHOR AFFXLXATXON
GROBE,J.A.
Region 3'(Post
820201)
RECIP . NAME
RECIPIENT AFFILIATION
SAMPSON,J.
American Electric Power Co., Inc.
SUBJECT: Forwards insp repts
50-315/98-08
Ec 50-316/98-08
on 980313-
0427
&, notice of violation.Three violations noted. First
violation involved failure to follow procedure
by contract
maintenance
workers.
DZSTRXBUTION CODE: IE01F
COPXES RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Xnsp Rept/Notice of Violation Response
NOTES:
DOCKET
05000315
05000316
23
C
RECIPIENT
ID CODE(NAME
PD3-3
XNTERNAL: AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN3
FILE
01
XTERNAL: LITCO BRYCE,aT H
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
STANG,J
NRR M /PMCB
NUDOCS-ABSTRACT
OGC/HDS3
NOAC
NUDOCS FULLTEXT
COPXES
LTTR ENCL
1
1
1
1
1
1
1
'
1
1
1
1
1
1
1
1
R
D
0
"~~ggpg PPQN
@pe PgQPPY
h
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPXES
REQUIRED: LTTR
17
ENCL
17
I,ll
(4~S RE0iI
~o
, UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION III
801 WARRENVILLEROAD
LISLE, ILLINOIS605324351
May 28,
1998
Mr. John Sampson
Site Vice President,
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan, Ml 49107-1395
SUBJECT:
D. C. COOK INSPECTION REPORT 50-'315/98008(DRP); 50-316/98008(DRP)
Dear Mr. Sampson:
On April27, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2 reactor
facilities. The enclosed report presents the results of that inspection.
During the 6-week period
covered by this inspection report, the inspectors observed that the plant was maintained
shutdown in a safe manner and that shutdown activities were focused on safety.
Based on the results of this inspection, three violations of NRC requirements were identified by
the NRC. The violations are cited in the enclosed Notice of Violation (Notice) ~ and the
circumstances
surrounding them are described in detail in the subject inspection report. The first
violation involved a failure to follow procedure by contract maintenance workers. The violation is
of concern because of the failure of the contract workers to verify the proper bolting configuration
on the
1 CD emergency diesel generator.
The improper bolting configuration could have led, to a
failure on that engine similar to the exhaust manifold bracket failure which caused the 2 AB
emergency diesel generator to become inoperable.
The second violation involved the
inadequate root cause determination by your staff regarding the missing jam nuts.
Your staff's
assessment
determined that the root cause could not be identified, while the NRC inspectors
determined the root cause was due to poor contractor performance.
The third violation involved
the failure of the Unit 2 operators to use a procedure designated as "Continuous Use" at the job
site. The Unit 2 operators were not sure which general plant procedures, ifany, were in use
while operating in Mode 5, and this resulted in the operators failing to continuously use the
procedure as required.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response.
The NRC will use your response,
in part, to
determine whether further enforcement action is necessary
to ensure compliance with regulatory
requirements.
98060201.i7
980528
ADQCK 05000315
8
~ 'J5
ll
J. Sampson
-2-
In accordance with 10 CFR 2.790 of the NRC's "Rules 'of Practice," a copy of this letter, the
enclosures,
and your response willbe placed in the NRC Public Document Room.
Sincerely,
/s/ J.
A. Grobe
Docket Nos.: 50-315; 50-316
John A. Grobe, Director
Division of Reactor Safety
Enclosures:
cc w/encls:
1.
2.
Inspection Report 50-315/98008(DRP);
50-316/98008(DRP)
Don Hafer, Acting Chief
Nuclear Engineer
Douglas Cooper, Plant Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
Emergency Management
Division, Ml Department
of State Police
David A. Lochbaum, Union
of Concerned Scientists
DOCUMENT NAME: G:iCOOKiDCC98008.DRP
To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy
w/attach/encl "N" = No co
OFFICE
NAME
DATE
Rill
Sch
'
zco
5/
98
Rill
Rll
Gro
5 g/8
5
/98
OFFICIALRECORD CO
Y
J. Sampson
Distribution:
Project Mgr., NRR w/encls
C. Paperiello, Rill w/encls
J. Caldwell, Rill w/encls
B. Clayton, Rill w/encls
DRP w/encls
TSS w/encls
DRS (2) w/encls
Rill PRR w/encls
PUBLIC IE-01 w/encls
Docket File w/encls
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)