Forwards Insp Rept 50-400/91-04 on 910223-0322 & Notice of Violation.Nrc Concerned Because Violation Involves Inadequate Testing/Verification of Reactor Protection Sys Components Following Removal & Incomplete Troubleshooting
ML18009A869
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/02/1991
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML18009A870 List:
References
NUDOCS 9104230332
Download: ML18009A869 (3)


See also: IR 05000400/1991004

Text

Docket No. 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0.

Box 1551

Raleigh,

NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/91-04)

This refers

to the

inspection, conducted

by J.

Tedrow of this office -on

February

23 - March 22,

1991.

The inspection

included

a review of activities

author'ized for your Harris facility.

At the conclusion of the inspection,

the

findings

were

discussed

with those

members

of your staff identified in the

enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

.the inspection

consisted

of sele'ctive

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.*

Based

on the results

of this inspection,

certain of your activities

appeared

to be in violation of

NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

We are

concerned

about the violation because't

involved

inadequate

testing/verification

of reactor

protection

system

components

following removal

and

incomplete

troubleshooting

of the

problem

even

though

two opportunities

existed to do so.

You are required to respond to this letter and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent

recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with

NRC regulatory requirements;-

In accordance

with 10 CFR 2.790, of the

NRC's "Rules of Practice,"

a copy of

this letter

and its enclosures

will be

placed

in the= NRC Public

Document

Room.

Pi04230332 9f0402

PDR

ADOCK 05000400

Q

PDR

Carolina

Power

and Light Company

APR

Og ]gSl

The

responses

directed

by this letter

and

the

enclosed

Notice

are

not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork

Reduction Act of 1980,

Pub. L. No. 96.511.

Should you have

any questions

concerning this .letter,

please

con'tact us.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

R. B. Richey, Vice President

Harris Nuclear Project

Box 165

New Hill, NC

27562

C.

S. Hixnant

General

Manager

Harris Nuclear Plant

Box '165

New Hill, NC

27562

C. S. Olexik, Jr.,

Manager

Regulatory

Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

Richard

E. Jones

General

Counsel

Carolina

Power

5 Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

5 Natural

Resources

P.

0.

Box 27687

Raleigh,

NC

27611-7687

bcc w/encls:

(See

page

3)

David N. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Carolina

Power

and Light Company

APR 02

199j

bcc w/encls:

14ecument

Control

Desk

H-. Christensen,

RII

R. Becker,

NRR

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

1,

Box 315B

New Hill, NC

27562

RII'DRP

HChristensen

Of/ 2s'91

'f

8 c~.~n</

P/z/1 (