ML18009A896
| ML18009A896 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/02/1991 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Eury L Carolina Power & Light Co |
| Shared Package | |
| ML18009A897 | List: |
| References | |
| NUDOCS 9105210184 | |
| Download: ML18009A896 (3) | |
See also: IR 05000400/1991006
Text
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Nr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0.
Box 1551
Raleigh,
NC 27602
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT NO.'0'-400/9tjf-06)
This refers to the inspection
conducted
by J.
Tedrow of this 'office on Narch
23
through April 19,
1991.
The inspection
included
a review of activities
authorized for your Harris facility.
At the conclusion of the inspection,
the
findings were discussed
with those
members. of your staff identified in the
enclosed
inspection report.
r
Areas
examined during the'nspection
are identified in the report.
'Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observation
of
activities in progress.
Based
on the results of this inspection, certain of your activities appeared
to
be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
We are concerned, about the violation because it involved
non-compliance with plant procedures
which could have
caused 'the contamination
of the instrument air system.
4
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790, of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980,
Pub.
L. No. 96.511.
9105210184
910502
ADOCK 05000400
G
Carolina
Power
and Light Company
MAY 08 1991
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
SAVES tX VMRELif
David N. Verrelli, Chief
Reactor
Projects
Branch
1
Division of Reactor
Projects
Enclosures:
1.
Notice of Violation-
2.
NRC Inspection
Report
cc w/encls:
R.
B. Richey, Vice President
Harris Nuclear Project
Box 165
New Hill, NC 27562
C.
S. Hinnant,
General
Manager
Harris Plant,
Box 165
New Hill, NC 27562
C.
S. Olexik, Jr.,
Manager
Regul atory Compl iance
Harris Nuclear Project
Box 165
New Hill, NC 27562,
Nr. H.
Ray Starling
Manager - Legal
Depar'tment
P.
0.
Box 1551
Raleigh,
NC 27602
Dayne
H. Brown, Chief
Division of Radiation Protection
N.
C. Department of Environment,
Health
& Natural
Resources
P. 0.
Box 27687
Raleigh,
NC 27611-7687
bcc w/encls:
(See
page
3)
Carolina
Power
and Light Company
MAY 08 1991
bcc w/encls:
Document Control
Desk
H. Christensen,
RII
R. Becker,
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
Route
1,
Box 315B
New Hill, NC
27562
RII: DRP
MGlasman
05/Wg1
RI
- DRP
H hristensen
05/~1