ML18086B061

From kanterella
Revision as of 04:58, 6 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-272/81-25 & 50-311/81-25 on 810915-1019 & Notice of Violation
ML18086B061
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/05/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
Shared Package
ML18086B062 List:
References
NUDOCS 8111250547
Download: ML18086B061 (2)


See also: IR 05000272/1981025

Text

NOV 5 1981

Docket Nos.

'~0-212

50-311

Public Service Electric and Gas Company

ATTN:. Mr. F. W. Schneider .

Vice.President - Production

80 Park Plaza ... 15A

Newark, New Jersey

07101

Gentlemen:

This. refers to the routine safety inspection conducted_. by Mr. L. ** Norrholm: 'of

this *office* on September*15 - October 19, 1981 at Salem Nuclear Generating

Station; *units 1 and 2 of activities. author1zed by NRC License Nos. DPR-70 *

  • and DPR:-'75 and to the discussions .of .our findings held by Mr. L. Norrholm .

with Mr .. H. Midura *Of your. staff periodi.cal ly duri_ng. *the fo~pect.ion.* * .* * *

  • Areas* examfoed du~ing* this inspection are described in the .*office of>Inspec-

tion and Enforc;ement Inspection Report which is enclosed with this Tetter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records:, interviews with personnel, and obser- .

vations by_ the inspector.

  • *
  • s*a:*sed on the results of this inspectfon9 it appears that one of your activftie*s ,

was not conducted in*full compliancewith*NRC requirements, as set forth in .

. the Notice of Violation, enclosed herewith as Appendix A.* ThiS item of non- * _ .*

compliance has been categorized into the levels descri_bed in the Federal Register

Notice (45 FR 66754) dated October 7, 1980.

You are required to respond to thiS

letter and in preparing your response, you should follow the instructions in

Appendix A..

  • *.

In a.ccordance with* 10 CFR 2.790 of .the Coiirnission Is regulations, a copy of' this

  • 1etter and the enclosu.res will be placed in* the NRC's Public Document Room.

If this report contains any information that yoti (or your contractors) believe

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you ..

  • (a) notify this office by telephone within te.n (lo) days from the date of this

. letter of your intention to file a request for withholding; and {b) submit

within 25 days from the date of this letter a written applkation to this office

.to withhold such infonnation .. Consi.stent with secti9n 2.790(b)(l), any such

.

application must be accompanied by an affidavit executed by the owner of the

. information which identifies the document or part sought to be withheld, a.nd

which contains a full statement of the reasons on the basis which it i's claimed

.

.

that the infonnation should be withheld from public disclosure .

-..--,--.-,--

...,...._*.

RI:DRPI

. {~1Hill

~.

.

RI:DRPI

.* Nd~rholm

  • ~?

1.\\ij

RI:DRPI

_ G~;tnma~lgJ

(_?;op)/'

/-.---'

'

,

. ) t'ti:)

8111250547 8111075 2

'-.

PDR ADOCK osooo~DR

G

OFFICIAL RECORD COPV

i

!

I

"ti

..,. ' ,. , .

..

Public Service Electric.and Gas Company

NOV 5 *1981

2

This section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b}(4). The information sought to be

withheld shall be incorporated as far.(ls possible into a separate part of the

affidavit. If we do not hear from you in this regard within the specified

. periods noted above~ the report will be placed in the Public Document Room.

The telephone notification of your intent to request withholding, or any

request for an extension of the 10 day period whicli you believe necessary,

  • should be made tp the Supervisor, Files, Mail and Records, USNRC Region I,

at (215) 337-5223.

.*

. .

. . .

  • .*

.

.

.

Should you have any questions concerning this* inspection_, we wil 1 be pleased*

. to discuss. them with you~.

Sincerely,

z~SUod

B~,,~ ~.J'., .... ,_-r

R. R. -Keiring,

1ef, *

Projects Brandi No. 2, Division. of

. * Re.sident ancl. Project Inspection.

Enclosures:

.

1. *Appendix A~ Notic~of Violation

.2.

Combin~d Office of Inspection and Enforcement Inspection Rep()rt Numbers

. <

50-272/81-25 and 50-311/81-2S

cc w/encl:* *

J. T. Boettger, General Manager, Corporate Quality Assurance

. *R. l. Mittl, General Manager ... L ic:ensing and Environment

1-1. J. Midura!t Manager ":" Sa1em Generat_ing Station *

. R~ A~ Uderitz, General Manager'- Nuclear Production**

.* *Public Document Room (PDR) - * * .* * *

  • * *

. .

.

  • Local Public Docl!TTlent Room (LPDR)

.

Nuclear -Safety Infonna:tion Center (NSIC} .*

NRC Resident Inspector

State of New Jersey

bee' w/encl:

.

Regjon I Docket Room (with concurrence~)

Chief, Operational Support Section-(w/o encls):

OFFICIAL .RECORD COPY