Monthly Operating Data for April 1975
ML18347A839
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/02/1975
From: Meincke J
Consumers Power Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18347A839 (4)


Text

  • Fiie Cy.

U.S.Nuclear Regulatory Commission Mail and Records section Washington, D.C., 20555 Gentlemen:

consumers Power company Enclosed is a copy of the monthly operating data for the Palisades Plant for the month of April, 1975*

JAM:db cc:

J.G.Keppler, NRC R.L.Haueter R.B.Sewell Sincerely, James A. Meineke

  • .I

. -. :__,~

APPp.JDIX C I. ~

(0 DOCKET NO.

50-255.

UNIT Palisades DATE 5/2/75 COMPLETED BY DBollnow AVERAGE DAILY UNIT POWER LEVEL MONTH April 1975 A VERA GE DAILY PO\\\\iER LEVEL AVERAGE DAILY POWER LEVEL.

DAY

(.MWe-net)

DAY (MWe-nct) 1 0

17*

550 2

0 18 577

/./

/

3 4*

19 231 4

117.

. 20.

268 5

162 21 216 6

131 22 560 0

c~*.. *._._;

7 261 23 121 8

350 24 501.

9 388 25 266 10 446 26 531 11 389

27.

431 12 461 28 430 13 518 29 482 14 361 30 503 t5

. 501 31 16 529 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit powe:r level in ivt\\Ve-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usi*ng maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power le\\'cl exceeds the I 00% line (or the restricted power level* line). In such cases, the

(.o av:ragc daily unit power ontput sheet should be footnoted to explainthc apparent anomaly......

  • L-.. ~.. --..,,~**~ "" ~~~-~~¥<+~-*---~,n

~

  • ,.--.o

(

  • -~:****

APPENDIX D*

UNIT _P_a_.:_1_J_

.. s_a_cl_e_s __ _

DATE lfJB.y 2, 1975 616-*764..:8913*

. COMPLETED BY D.Bollnow DOCKET N0. __ 5_0_-_2_5_5 ___ _

OPERATiNG ST A TUS I.

REPORTING PERIOD:

. 750401 THROUGH __

7.J...,,5"-'0::...4..:....~""-'0::___ ______ _

HOURS IN REPORTl'.'\\G PERIOD: ___ 7'-l__,9'-----------.,--------------,7'7"1""r--

2.

CURRENTLY AUTHORIZED POWER.LEVEL ('.\\1Wth) 220Q_ MAX. DEPENDABLE CAPACITY (MWe-NET) _O_t3_l_!* __

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALLY RESTRICTED (IF ANY) (M\\Ve-NET):_--06:...3=0'-

1 ---~---

4.

REASONS FOR RESTRICTION (IF ANY):

Power Restricted to 2100.MWT due to low Pr:i.mary Coolant Flow caused by Steam Generator Plugging THIS CUMULATIVE R_E_P_ORTING PE_R....:10:...:D'-----=-Y..:..R'-'T:...:O:....D=-A:..:c. TE.o.;.,;...' ____

T...:O._D_A_T_E_

5.

HOURS REACTOR WAS CRITICAL.............

6.

REACTOR RESERVE SHUTDOWN HOURS.......

7.

HOURS GENERATOR ON LINE.*...........**.

8.

lTNJT RESER VE Sil UTDOWN HOURS........***

9.

. GROSS THER'.\\1AL ENERGY GENERATED ('.\\1WH).*.*..*****.*********

IO..

GROSS ELECTRICAL ENERGY

11.
12.
13.
14.

-GENERATED ('.\\l\\VH).....................

NET ELECTRICAL ENERGY GENERATED (MWH)..*.*...***..*..*.*.***.**.*.

RL\\CTOR AVAILABILITY FACTOR (l).... -....

UNIT A \\'AILABILITY FACTOR (2)..**..*..*.*

l 1NIT CAPACITY FACTOR (3)............*..

UNIT FORCED OllTAGE RATE (4)......**.***

709.5

,. 0 657.8 0

967;.872 291,04o 266,769 98.7%

91.5%

54.2%

8.6°/o 739.8 0

657.8 0

. 967,872 291,04o 266,769

25. 7%

22.8%

13.5%

77.'?}

lG,976.7 0

9.978.9 0

15,081,432 4,795,290 4,520,474 37.. 6%*.

34.2~.*

'26.2% -

63.2°/o IS.

16.

S!ll1TDOWNS SCHEDULED TO BEGIN IN.NEXT 6 MONTHS (STATE TYPE, DATE, AND DURATION OF EACH):

17.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ___________

IS.

UNJTS IN TEST ST:\\ TVS (PRIOR TO CO'.\\i:l!ERCIAL OPERATION) REPORT THE FOLLOWING:

(I)

REACTOR A\\'AILABILITY FACTOR t:NIT AVAILABILITY FACTOR (3)

UNIT CAPACITY FACTOR INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION HOURS REACTOR WAS CRITICAL HOURS IN REPORTING PERIOD x 100 HOURS GENERA TOR ON LINE


~x100 HOURS IN REPORTING PERIOD NET ELECTRICAL PO\\\\'FR GENERATED DATE LAST FORECAST DATE ACHIEVED MAX. DEPENDABLE CAPACITY (MWc*NET) X HOURS IN RU'ORTIN<.; l'E!UOD

. l f~~ (4) t:NIT FORCEDOL'TAGE RATE

(~\\.~.>3.

FORCED Ol:TAGE HOURS

-~-~---------XlOO HOURS GENERATOR ON LINE+ FORCED OUTAGE HOURS

.., ~~ L

).16*D*l

_.:~-*=-~~~7~*~-~~~-=~-~~~-~-

~.---

I t.,,.\\

e :.

.J~*

J.

0 '-k'"~"""""-"'"'""""

... ;"'"'";,,~............,,..., ___.,................. _,....,

~..............,.,~....,........,,...... *A*P(l-'pi~*-*----*---... ---.... *-> =-*"""*,_....., *.* _..._. -** -~-0-C-.K~E

.... ~

N-m-. --~~5~0~~*2=0*5:;...::5'-*-** _-_~

....... <.->'\\~*I

~

~

f j

UNIT SHUTDOWNS UNIT NAME Palisades l

  • 1.*

I

  • DATE 5-2-75 l

COMPLETED BY

  • n.Bollnow t

REPORT MONTH April 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVg ACTIONS/COMMENTS 3

. 741104 F

3662.1 B

1 Completion of Steam Gen. Repair/Inspection 1

7504o6 F

2.6 A

1 Off-Line to Repair Leaking F.W.Heater Valve 2

750422 F

14.l A

3 Trip due to E.H. oil Line failure on Turbine control system (1) REASON (2) METHOD A*-EQUIPMENT FAILURE:(EXPLAIN) 1-MANUAL

  • B-MAlNT. OR TEST 2-MANUAL C-REFUELING SCRAM D-REGULATORY RESTRICTION 3-AUTOMATIC*

E-Ol'ERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR

{EXPLAIN)

H-OTHER (EXPLAIN)

SUMMARY

Turbine balancing was performed on 1st and 2nd; then unit went up in power in accordance with a

$team Generator flushing.program. Plant.is running at 80% power with F.W. Heaters #1 and 2 out of service which is restrictive* on power..