ML19208B372

From kanterella
Revision as of 23:44, 4 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/79-28 & 50-374/79-19 on 790710-11.No Noncompliance Noted
ML19208B372
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/02/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19208B373 List:
References
NUDOCS 7909200112
Download: ML19208B372 (2)


See also: IR 05000373/1979028

Text

'

  1. " " % 'o

TIC

/

UNITED STATES

8"

NUCLEAR REGULATORY COMMISSION

'

o

$

'c [E

REGION lit

.

o,

799 ROOSEVELT ROAD

% . . . +

e

GLEN ELLYN,ILLINOls 60137

AUG

2 1979

.

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. C. E. Jones of this office

on July 10-11, 1979, of activities at La Salle County Station, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-99 and No. CPPR-100

and to the discussion of our findings with Mr. L. J. Burke and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application'must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

h-(v\\

cj Li

~

7 9092 00fl 2.y, '

Q

.

Commonwealth Edison Company

-2-

AUG 2 Fl9

We will gladly discuss any questions you have concerning this

~

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-373/79-28

and No. 50-374/79-19

cc w/ enc 1:

Mr. L. J. Burke, Site Project

Superintendent

Mr. T. E. Quaka, QA

Supervisor

Mr. R. H. Holyoak, Station

Superintendent

Central Files

Reproduction Unit hTC 20b

PDR

Local PDR

NSIC

TIC

Hr. Dean Hansell, Office of

Assistant Attorney General

'd \\

.,] fi

"

.

/