Approved FSAR Revision Notices Incorporated Since May 2018 Update -Effective May 31, 2019
ML19255F650
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/31/2019
From:
South Carolina Electric & Gas Co, Dominion Energy Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19255F498 List:
References
19-263
Download: ML19255F650 (6)


Text

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 1 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 1

11-024 2019-03 Figure 2.4-6 Figure 9.3-15 Engineering Change Request (ECR) 50809 and ECR 50809F - Site Drainage Piping Improvements This change revised FSAR Figure 2.4-6 and 9.3-15 to show the modification of drain lines and relocated drainage outlets to comply with 10CFR73.55 and 10CFR73.58.

2 14-041 2019-02 Figure 7.4-1 Figure 7.4-2 Figure 8.3-2aa Figure 8.3-2ab Figure 8.3-4 ECR 50810 - Hazards Protection for NFPA 805 Transition This FSAR change revised plant drawings to achieve compliance with NFPA 805 requirements. Specifically, FSAR figures 7.4.1 and 7.4.2 were revised to include the addition of the new transfer switches for the EFW valves and charging vale to allow isolation of the control building circuits for control room evacuation panel operations in case of a fire. FSAR Figures 8.3-2aa, 8.3-2aB, and 8.3-4 were revised to show the addition of the new fuses in the shunt circuit for Control Room Battery Charger remote ammeter circuits.

3 15-010 2019-02 Figure 1.2-1 Figure 2.4-6 ECR 50888 - Combined Maintenance Shop Utility Tie-Ins and Site Preparation This change revised FSAR Figure 1.2-1 and 2.4 to show the new utility tie-ins for a Combined Maintenance Shop in the yard area.

4 16-008 2019-05 Figure 5.2-8A ECR 72141-Revision to Figure 5.2-8A This change revised FSAR section 5.2 to include the as-built configuration of the Nitrogen System.

5 16-010 2019-03 Section 8.1 Section 8.2 Figure 8.2-1 Figure 8.2-2 Figure 8.2-2a Figure 8.2-2b Figure 8.2-2c ECR 50855 - Replacement of Fairfield Breakers 8942 and 8912 This changed revised FSAR Figures in Section 8.2 to incorporate the replacement of Fairfield Breakers 8942 and 8912. The previous oil circuit breakers 8942 and 8912 were replaced with SF6 circuit breakers, new coupling capacitors, voltage transformers, and new foundations for each line.

6 17-008 2019-03 Figure 9.5-1, SH2 Figure 1.2-1 ECR 50913 - South Protected Area Blast & Ballistic Rates Enclosures (BBRE) Installation This changed revised FSAR Figures 1.2-1 and 9.5-1 to reflect the removal of the C Warehouse south overhang sprinkler system and addition of three new security BBREs.

7 17-012 2018-08 Figure 9.3-14 ECR 50910 - Turbine Building Sump Radiation Monitor RM-L8 Sample Line Suction Strainer This change added a Wye strainer, strainer blow-off isolation valve, and strainer isolation valve to drawing D-302-352. The strainer and associated valves were installed to intercept and remove debris upstream of the Turbine Building Sump Liquid Radiation Monitor (RML0008).

8 17-022 2018-12 Section 3.10 Section 8.3 Figure 8.3-1 ECR 50883 - Safety Related Inverter Replacement This change revised FSAR Sections 3.10 and 8.3 to include the increased efficiency of the replacement inverters XIT5901, XIT5902, XIT5903, and XIT5904 on the automatic and manual loading and unloading of the Diesel Generator.

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 2 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 9

17-028 2018-08 Section 6.2 Figure 6.2-1-6.2-3 Figure 6.2-7 ECR 72296 - TS 6.8.4.g Containment Leak Rate Testing Program - LAR-14-01541 The change revises the peak loss of cooling accident containment pressure to a value which reflects an updated mass an energy (M&E) analysis. The peak pressure is also used as a criterion for containment leak rate testing.

The updated M&E analysis address Westinghouse Nuclear Safety Advisory Letters NSAL-06-06, 11-2, and 14-1.

10 17-029 2019-01 Section 3.2 Section 3.9 Section 6.2 Figure 6.2-52 Figure 7.5-1, SH5 Figure 9.2-9A Section 9.4 Figure 9.4-32 ECR 50917 - Control Rod Drive Mechanism Cooling System Demolition This change revised the FSAR description of the CRDM Cooling Water System to denote equipment removed during RF-24 and its status of being abandoned in place to ECR 50917. These changes were incorporated to FSAR Sections 3.2, 3.9, 6.2, 7.5, 9.2, and 9.4.

11 18-003 2018-07 Section 18.3.2 ECR 72340 - Environmentally Assisted Fatigue Methodology This change revised FSAR Section 18.3.2.1 to include the use of NUREG/CR-6909 as an acceptable NRC approved methodology for computing fatigue cumulative usage factors, which account for the effects of environmentally assisted fatigue for the period of extended operation.

12 18-004 2019-02 Section 8.3 Figure 8.3-4b ECR 50615 - Elimination of XIT5905 for Digital Control Systems (DCS) Cabinets XPN6035 thru XPN6038 This change revised FSAR Figure 8.3-4b to reflect the configuration changes of adding a redundant power supply to the DCS Cabinets. FSAR Section 8.3.2.1.1 and 8.3.2.1.5.5 were also revised to include the Independent Spent Fuel Storage Installation Electrical Building as an uninterruptible power supply to the secondary plant digital control system.

13 18-007 2018-08 Figure 9.5-1, SH1 Figure 9.2-4 Figure 9.2-6 ECR 72366 - Correction to FSAR Figure 302 Drawings This change corrected component symbols in FSAR Section 9.2 and 9.5 302 Drawings.

14 18-011 2018-08 Figure 5.2-8 Figure 9.2-2, SH4 Figure 9.3-4 Figure 10.4-6 Figure 10.4-7A ECR 72367 - Corrections to Drawing Errors Generated During CADD Process This change revises FSAR Drawings - Section 5 Figure 5.2-8, Drawing 302-812, Revision 21; Section 9 Figure 9.3-4, Drawing 302-771, Revision 40 and Figure 9.2-2, Drawing 302-222, Sheet 4, Revision 4; Section 10 Figure 10.4-6, Drawing 302-204, Revision 4, and Figure 10.4-7A, Drawing 302-165, Revision 29.

15 18-012 2018-08 Figure 9.5-7 ECR 72375 - FSAR Figure Enhancement This change enhanced FSAR Figure 9.5-7 to make the equipment identifications (IDs) associated with 1MS 005-3 legible.

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 3 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 16 18-014 2018-06 Section 2.5.4 CR-12-00400 - Added the use of Controlled Low-Strength Material This FSAR change adds the use of Controlled Low-Strength Material flowable cementitious backfill as an acceptable safety related backfill to FSAR section 2.5.4.5.2.

17 18-015 2018-07 Figure 9.3-16, SH 3 ECR 72379 - Revision to FSAR Section 9.3, and Figure 9.3-16 Sheet 3.

This change revised FSAR Figure 9.3-16 Sheet 3, Drawing E-302-675, Revision 37 to add a missing B match mark flag that was inadvertently removed under ECR 51007.

18 18-017 2018-12 Figure 1.2-11 Figure 12.1-4 Figure 12.1-13 Figure 12A.4-8 ECR 50920 - Emergency Feedwater Mezzanine Walk Platform This change revised FSAR Figures 1.2-11, 12.1-4, 12.1-13, and 12A.4-8 to include the addition of an emergency feedwater mezzanine walk platform.

19 18-018 2018-10 Figure 4.2-6 ECR 50923 - Cycle 25 Core Reload Design This change revised FSAR Section 4.2 Figure 4.2-6 to be consistent with the fuel built for VCSNS Unit 1 Cycle

25. Specifically, this change incorporated the Westinghouse design change of the Fuel Top Grid bulge tool.

20 18-021 2018-08 Figure 9.2-2, SH 2 Figure 9.2-2, SH 4 ECR 71580 - Revision to Drawing D-302-222, S2 and S4 This change corrected FSAR Section 9.2 Drawing 302-222 Sheet 2 and 4 to reflect as-built conditions for their respective systems.

21 18-022 2018-06 Section 6.2 CR-18-01009 - Correction to FSAR Table 6.2-54a This change makes a correction to FSAR Table 6.2-54a. This correction adds a spare electrical penetration, Penetration 807 to the table.

22 18-023 2018-07 Figure 9.2-5 Equal To or Better Than (ETBT)-458 - Replacement Check Valves for XVC09591A/B/C-CC This change removed the Bill of Materials number ROI-5 and replaced it with ETBT-458 on FSAR Figure 9.2-5 (Drawing D-302-612, R28) to reflect the replacement of Check Valves XVC09591A/B/C-CC.

23 18-024 2018-09 Figure 9.3-3 ECR 72186 - Correction to FSAR Section 9 Figure 9.3-3 This change corrected piping configuration upstream of the Reactor Building (RB) Instrument Air (IA)

Compressors to reflect the as-built configuration of plant. Equipment IDs IPI08364 and IPI08374 High Root Valves were corrected. The electrical connection to the A RB IA Compressor Motor will be drawn to show it cross over the 6-inch header to the A Compressor.

24 18-025 2018-06 Figure 9.3-7 ECR 71289 - Correction to FSAR Section 9 Figure 9.3-7 This change corrected two labels (J-6 and J-9) at location F-11 and added a label to location H-12 for FD-23 on E-911-103.

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 4 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 25 18-026 2018-10 Figure 9.2-1, SH1 Figure 9.2-9A Figure 10.4-7A Figure 11.3-4, SH3 ECR 72395 - Corrections to FSAR Figure 302 Drawings This change revised FSAR Section 9 Figure 9.2-1, Drawing 302-221 Sheet 1, Revision 32 and Figure 9.2-9A, Drawing 302-162, Revision 14; Section 10 Figure 10.4-7A, Drawing 302-165, Revision 29 and Section 11, Figure 11.3-4, Sheet 3, and Drawing E-302-742, Revision 17. These changes were completed to ensure that the drawings reflected the as-built configuration of the systems.

26 18-028 2019-01 Figure 5.2-8a ECR 72404 - Low Pressure Nitrogen Missing Needle Valves Document & Database Changes This change revised FSAR Figure 5.2-SA to include two missing needle valves (XVN06300-NN and XVN06301-NN) in the Low Pressure Nitrogen System.

27 18-029 2018-07 Section 3A CR-17-00717 - Correction to FSAR Section 3A This change revised the VCSNS regulatory position on quality requirements associated with Reg. Guide 1.189.

28 18-030 2019-01 Figure 9.2-9 ECR 72406 - Addition of XVG15522-DW to FSAR Figure 9.2-9 This change revised FSAR Figure 9.2-9, Demineralizer Water System Flow Diagram to include XVG15522-DW.

29 18-033 2018-12 Figure 9.3-2 ECR 72429 - Misaligned Instrument Air Valve This change revised FSAR Section 9.3 Drawing D-302-271 to correct the valve XVA76670-IA to XVA72670-IA.

30 18-034 2018-10 Figure 6.2-59 ECR 72431 - Correction to FSAR Section 6.2, Figure 6.2-59 This change corrected Equipment IDs for valves associated with IFI07304, IFI07305, and IFI07313 on the Reactor Containment Leak Rate Test Panel.

31 18-036 2018-12 Section 6.2 ECR 72425 - Reactor Building Spray Operation Basis Reconciliation This change to the FSAR clarifies the operating time of the Reactor Building Spray System following a design basis Loss of Coolant Accident from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

32 18-039 2019-04 Figure 9.4-25, SH2 ECR 50874AD - Reactor Building Cooling Upgrade Major Revision This change revised FSAR Figure 9.4-25 to include the installation of oil coolers to XHX0010B and XHX0010C.

33 18-040 2019-05 Figure 9.2-4 ECR 72444 - Corrections to FSAR Figure 9.2-4 This change revised FSAR Figure 9.2-4 to reflect the as-built configuration of the plant. The location of the plugged recirculation line, valve symbol used for XVA09614-CC, added IFX7081, and flanges on either side of the CC Chem Inj Pump Oil Trap were added to the figure.

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 5 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 34 18-042 2018-10 Section 6.2 Section 10.4 CR-14-01490 - Revise Reactor Building Spray System and Feedwater System Design Information This change revised FSAR Sections 6.2 and 10.4 to include a description of relief valves installed to prevent pressure locking of the Reactor Building Spray System and Feedwater System Valves.

35 18-043 2018-10 Section 13.2 ACAD 17-001 Training Program This change revised FSAR Section 13.2.1, Item 9 to remove the reference to Mechanical Maintenance Supervisor Training Program as an INPO Accredited Training Program.

36 18-044 2019-01 Figure 10.4-17 ECR 72207 NC/CR-11-03747 Accept-As-Is/ Current Penstocks Operation Acceptable This change revised FSAR Figure 10.4-17 to permanently accept the current condition/operation of the Liquid Waste System at the Penstocks, with section of piping removed & valve XVG06904A-LW out of service.

37 18-045 2019-01 Figure 9.2-2, SH1 Figure 9.2-2, SH3 ECR 50933 - Repair Service Water (SW) Pipe Leaks Using PM Caps This change revised FSAR Figure 9.2-2 to move the design flags from the outlet of the XVB03121A(B)-SW to the outlet of the orifice XPS0245A(B). These changes were a result of cavitation damage at the outlet of XVB03121A(B)SW, EDG Cooler A and B Service Water Return Valves, the material downstream is changed to stainless and an orifice is installed to lessen the throttling duty of the valves.

38 18-046 2019-05 Figure 10.4-7A ECR 71630 - Correction to FSAR Section 10 Figure 10.4-7A, Drawing D-302-165, Revision 30 This change revised FSAR Figure 10.4-7A to include Pressure indicator (IPI16631) and the associated HR valve (IPI16631-HR-WI). These changes were made to reflect the as-built configuration of the plant.

39 18-047 2019-03 Figure 5.2-8A ECR 50931, Incore Detector System Ten Path Vent Removal This change revised FSAR Section 5.2, Figure 5.2-8A to incorporate the incore detector system ten path vent removal. This revision consisted of removing portion of the CO2 Purge System tubing and installing an overflow drain line to ILS50402.

40 18-048 2019-01 Figure 9.2-7 ECR 72474 - Piping and Valve Corrections to FSAR Figure 9.27 This change revised FSAR Section 9., Figure 9.27 to reconnect ITI07003B to the Charging/SI Pump cooling water return line and redraw valve symbols for XVT09530A/B/CCC and XVT09686A/B/CCC.

41 18-050 2019-05 Figures 9.5-1 SH 1, 3, 4 & 5 ECR 50628 - Fire Protection Program Transition to NFPA 805 This change revised FSAR Section 9.5.1 Figure 9.5-1, S1, S3, S4, and S5 to correct errors identified during ECR 50628 implementation. Figure 9.5-1 S1 was revised to add a reducer downstream of XVT06017-FS and to Shift border for AFSPH back to proper location. Figure 9.5-1 S3 & S4 was revised to remove safety classification flags to show fire hose stations that are listed in SAP-131A and Figure 9.5-1 S3 & S4. Since these Hose stations are Quality Related (QR) Note 3 was which states Valve is QR, Hose Station is Non-Safety Related. Figure 9.5-1 S5 was revised to remove the safety classification flag upstream of XVM041 05-FS.

APPROVED FSAR REVISION NOTICES INCORPORATED SINCE MAY 2018 UPDATE - EFFECTIVE May 31, 2019 VC Summer Nuclear Station Page 6 of 6 RN #

DATE APPROVED SECTIONS BRIEF DESCRIPTION 42 18-052 2019-01 Section 11.3 SH 1 ECR 72478 - Piping Correction to FSAR Figure 11.3-4 This change revised FSAR Section 11.3, Figure 11.3-4 to remove a cross-connection at a coordinate (F-8) that does not exist.

43 18-053 2019-03 Figure 9.2-9 Figure 9.3-2 ECR 72479 - Airflow/Flow Path Corrections to FSAR Figure 9.2-9 and FSAR Figure 9.3-2 This change revised FSAR Figure 9.2-9 and 9.3-2 to correctly show the instrument air flow requirements for the DW Demineralizers. These changes were made to reflect the approved, as-built configuration of the plant.

44 18-054 2019-01 Section 3A FSAR Appendix 3A Division 1 NRC Regulatory Guides applicable to the VCSNS. (CR-16-01194)

This change revised the specific revisions listed for Regulatory Guides 1.84 and 1.192 in FSAR Appendix 3A.

FSAR Appendix 3A was also revised to show that Regulatory Guide 1.85 was withdrawn and eliminated.

45 19-001 2019-05 Figure 9.3-2 ECR 72491 - Renaming XVA72670 to XVN72670 This change revised FSAR Figure 9.3-2 to correct the valve symbol to show a needle valve for VN72670.