05000318/LER-1980-019-02, /02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed

From kanterella
Revision as of 03:52, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed
ML19309A822
Person / Time
Site: Calvert Cliffs 
Issue date: 03/25/1980
From: Bauer E
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19309A816 List:
References
LER-80-019-02L, LER-80-19-2L, NUDOCS 8004010383
Download: ML19309A822 (1)


LER-1980-019, /02L-0:on 800312,while Performing QC Insp,Cable A2Y0929P Was Found Incorrectly Routed,Which Violated Cable Separation Criteria.Caused by Personnel Not Following Designed Routing of Cable.Temporary Cable Installed
Event date:
Report date:
3181980019R02 - NRC Website

text

(1-71l LICENSEE EVENT REPORT CONTROL BLOCK: [l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

10111 lM l0 lC lC lti 12 l@l 0l Ol -l 010l 01 Ol 01 -101 Ol@l 4 l 1l l l 1! 1l@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE Jo 57 CAT 68 I o I 1 l g"7,y l L l@l0 15 10 l 0 10 13 Il 18 l@l0 13 11 12 18 10 l@l 013l 2l 51810 l@

CON'T w,

7 8

60 61 DOCK ET NUM8ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT oESCRIPTION AND PROBABLE CONSEQUENCES h 10121 lWhile performing a Ouality Control Inspection in the Unit 2 cable spreadina i

I O ia i I room, it was found that Cable #A2y0929P was incorrectly routed from 2R01 A to l

1 O 14 i Icable tray #ZB2AG13 and then back to its proper cable tray #ZA2AH03, thus l

1015 I lviolatina the cable seoaration criteria by crossing from a ZB to ZA facility.

I I his is not a repetitive occurrence.

I T

1O is l io i7I I l

l 0 l8 l l l

80 7

8 9 DE CODE SU8C E COMPONENT CODE SUSCODE SU E

10191 I Z l2 l@ J@ W@ [ Z l Zl Z l Z l Z l Z l@ lZ l@ lZ l@

a SEQUENTIAL OCCURRENCE REPORT R EVISION LE R/RO EVE 4T YEAR REPORT NO, CODE TYPE NO.

@,RE l 8101 l-l l 0lll 9l l0 l2 l lL l

[-j l0 l

_ 21 22 23 24

6 27 28 29 30 31 32 T

N AC ON ON PL NT MET HOURS S 8 i O

FOR 8.

SUPP LIE R MANUFACTURER IX l@lZ_J@

l Zl@

(_Zj@

l01010l0l [JJ_j@

[Ji_l@

[ Zj@

lZl9l9l9l@

33 34 36 M

37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS li l o i [ Construction personnel did not follow the designed routing of cable #A2YO929P.

I li li i IThe interin carrective action was to install a temporary cable from 2R01 A to I

ii12i 12Y09 and deeneraize the incorrectly installad cable.

The temnorary cable will 1

4 ii13i l be replaced by a cemanent cable in the correct routino in the immediate future.

I l i 141 1 I

ST S

% POW E R OTHER STATUS DISCO A DISCOVERY DESCRIPTION 32 IiI5I [E_j @ l0 l9 16 l @ l flA l

l C l@l 0.C. Inspection of Work on FCR 79-1034 l ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE Ii l6 I W @ ~W@l flA l

l tlA l

7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE

DESCRIPTION

l i l 71 10 l 0 l o l@LZ_J@l f1A l

,ERSON~E L,N3UJiES oESCR,PTiO~@

~UM8 E R Lthj l 010 l 0 l@l flA l

7 8 9 it 12 80 TYPE DESCR PT ON lil91LLl@l tt^

l 7

8 9 10 80 L2_LO_J tjl [@ DESCRIPTION ISSUE 7

a 9 _

l flA l

lIlIIIlIiili15 10 68 69 80 %

E. R. Bauer pgoye.I w s

  • A722 NAME OF PREPARER 80040103 83