TXX-3131, Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501
| ML19309H450 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/02/1980 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| TXX-3131, NUDOCS 8005130296 | |
| Download: ML19309H450 (1) | |
Text
8005130,216 TEXAS UTILITIES GENERATING COMPANY 2tM)I DHY %N TOWER = DALLA!L TEXAS 76203 May 2, 1980 a can,
"."l'!:.!!,';;"32' TXX-3131 Mr. W. C. Seidle, Chief Reactor Construction & Enginccring I
Support Branch U. S. Nuclear Regulatory Cce'ission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 100 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK ST5Af1 ELECTRIC STATION 1981-83 2300 MW INSTALLATION CONTROL BOARD WELDED CONNECTIONS FILE N0:
10110
Dear Mr. Seidle:
This letter supplements our report (TXX-311d) dated March 21, 1980, concerning welded connections of the control boards.
We stated in the report that rework would be completed by May 1, 1980.
It is anticipated, however, that this work will be completed July 1, 1980.
1 Very truly yours, R. J. Gary RJG:df
{
cc: NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 1
t
__