TXX-3131, Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501

From kanterella
(Redirected from TXX-3131)
Jump to navigation Jump to search
Supplements 800321 Rept Re Welded Connections of Control Boards.Anticipates That Rework Will Be Completed by 800701, Instead of 800501
ML19309H450
Person / Time
Site: Comanche Peak  
Issue date: 05/02/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
TXX-3131, NUDOCS 8005130296
Download: ML19309H450 (1)


Text

8005130,216 TEXAS UTILITIES GENERATING COMPANY 2tM)I DHY %N TOWER = DALLA!L TEXAS 76203 May 2, 1980 a can,

"."l'!:.!!,';;"32' TXX-3131 Mr. W. C. Seidle, Chief Reactor Construction & Enginccring I

Support Branch U. S. Nuclear Regulatory Cce'ission Office of Inspection & Enforcement 611 Ryan Plaza Dr., Suite 100 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK ST5Af1 ELECTRIC STATION 1981-83 2300 MW INSTALLATION CONTROL BOARD WELDED CONNECTIONS FILE N0:

10110

Dear Mr. Seidle:

This letter supplements our report (TXX-311d) dated March 21, 1980, concerning welded connections of the control boards.

We stated in the report that rework would be completed by May 1, 1980.

It is anticipated, however, that this work will be completed July 1, 1980.

1 Very truly yours, R. J. Gary RJG:df

{

cc: NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 1

t

__