05000269/LER-1978-029-03, /03L-0:on 780105,Unit 2 Failed to Start on Initiation.Caused by Failure of Breaker DB-26 to Close. Breaker Verified Operable by Subsequent Operation.Insp & Servicing Resulted in No Further Corrective Action

From kanterella
Revision as of 00:30, 2 January 2025 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 780105,Unit 2 Failed to Start on Initiation.Caused by Failure of Breaker DB-26 to Close. Breaker Verified Operable by Subsequent Operation.Insp & Servicing Resulted in No Further Corrective Action
ML19316A420
Person / Time
Site: Oconee 
Issue date: 02/03/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19316A413 List:
References
LER-78-029-03L, LER-78-29-3L, NUDOCS 7912110676
Download: ML19316A420 (1)


LER-1978-029, /03L-0:on 780105,Unit 2 Failed to Start on Initiation.Caused by Failure of Breaker DB-26 to Close. Breaker Verified Operable by Subsequent Operation.Insp & Servicing Resulted in No Further Corrective Action
Event date:
Report date:
2691978029R03 - NRC Website

text

_

gac Pomu ass u.s.nuettAn necut4 Tony couusssioN LICENSEE EVENT REPORT EXHIBIT A CONTROL BLocat: l l

l l

l l.h l

(PLEASE PRINT OR rYPE ALL AtousmED INFORMATIoNI i

[c TTl is i c i ni tir 111@ul0 (0 !-l Oi 010 ! 01 of-10101@lt.11111 lil l@l I

l o car @

e e uce=su Coos i.

ucansa =v-na a

a ucmaTves a co.cr I,

  • I ',1 Ev*"e ll_.)@l 01510l 01012l 6f 9 l@l of 110 i Sl718 l@l Ol 2l 013 17 l8 l@

8G St DocKETmwMesm eB 88 E w TNT OATE 34 73 mEnoMTDArt se aveur osseniptioN,uo,mos Asts coNstoucNees @dro Unit Lo_L2J l Durine normal operation Keowee Hy 2 failed to start on initiation ITTTII from Oconee control room.

Since Keowee 2 is a source of auxiliary power g

(TT71 I for the Oconee station (Units 1,2. and 3) this is reportable under lo !si i T.S. 6.6.2.1.b.(2).

The unit started normally on second and subsequent to is l l

'I t t emp t s.

L2.LU l l

t o is t l l

1 SYSTEM

CAUSE

CAust COM*.

VALyt CCOE CODE SueCCDE CDM*oN8NTCDDE sugCC0f Sua:CDE M.

l E l B l@ (E_j@ l X l@ l C l R l Kl BI R l l@ egg g@

io i,

is u

ENTYEAm a

m og 8,,"tr a rm0 l7 18 l

[-_j l 0 f 219 l l/l 10 I 3l lL I b,,

l0 l u',," r 2i n

n 1

2.

=

2.

u EN ON M

~oURS sue sTT po M s.

[

MA= s agm LLJ8(1J@

IzI@

(z l@

,i,0 10! 01 OJ

,tB @

i lt l@

lwIli2i0lg f i@

cause ossen Prion ANoCoRRECnVE ACnoNS @B-26) on the generator failed to close o The Field Flashing Breaker (D li e o # l l

EI first attempt.

The breaker was verified as operable by subsequent mI oneration and visual examination.

Inspection and servicing g

t i,31 I resulted in no further corrective action.

m.i I

T inPowtm OTHERSTATUS.

DISCov R DiSCOvtmv etSCMi* TION Iiis1 [Lj @ l 1IO-l0l@l NA l

lA l@l Operator Observation l

s4 g

u u

so d @ @1...esau AMou=TonAenviry @ l toCAnon en attaAss @

antAsso on art Ase l

l NA t s l

NA l

,m o~~.

anc..me= @

uun, rv,.

LL11J l of 01 d@L_zj@l NA l

' ' esaso==/t i=Jits ossCaimo=@

=uMu n l 0i 010 l@l NA i e l

2 o

f

'4* " "J'".'E" *'"" @

791211.0 v n

Q [Zj@l NA l

y g@{OtSCRePTIOps issut NA l

((;;pII;ll1ll i.

es se so NAus os enePanen K. R. Wilson (704) 373-8197 PHome:

W D