ML19316A413

From kanterella
Jump to navigation Jump to search
Forwards RO-269/78-01
Date released: 11/26/2019 Download: ML19316A413


LER 78-029/03L-0:on 780105,Unit 2 Failed to Start on Initiation.Caused by Failure of Breaker DB-26 to Close. Breaker Verified Operable by Subsequent Operation.Insp & Servicing Resulted in No Further Corrective Action
ML19316A420
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/03/1978
From: Ken Wilson
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A420 (1)
RO 269/78-01:on 780203,field Flashing Breaker Failed to Close.Controls Checked & Found in Proper Condition.Breaker Checked & Cleaned.Cause of Failure Not Determined
ML19316A417
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/03/1978
From:
DUKE POWER CO.
To:
References
Download: ML19316A417 (1)
Forwards RO-269/78-01
ML19316A412
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 02/03/1978
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19316A412 (2)