Responds to NRC Re Violations Noted in IE Insp Rept 50-302/78-08.Corrective Acions:Personnel Reinstructed, Instruction Given to Update Storage Vault Door Drawings & Previous safety-related Plant Mods Being Reviewed
ML19317G240
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1978
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19317G235 List:
References
CS-78-131, NUDOCS 8002280871
Download: ML19317G240 (2)


Text

~

f

  1. h*(ch' ( ' C
  • ee j

f C

\\c' u

6;(

6see Florida 31 May 1978 Po.oa.,er w

3-0-3-a-2 co

.o =

CS-78-131 Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref:

RII-WHB 230 Peachtree St. N.W., Suite 818 50-302/78-08 Atlanta, GA 30303

Dear Mr. O'Reilly:

O We offer the following supplemental information to the Items of Non-compliance noted in the referenced Inspection Report.

In regard to the Item of Noncompliance "A", we committed to modify three (3) doors involved in the permanent and temporary record storage vaults to comply with the four (4) hour rating requirement of ANSI N45.2.9-1974.

We now wish to withdraw this commitment as the ANSI Committee has not reached a final decision as to the requirement of four (4) hour fire doors. However, the referenced storage vault doors will be modified to a three (3) hour rating by 30 September 1978.

In regard to the Item of Noncompliance "B", our original response is amplified:

1-By letter of 9 May 1978 from the Technical Services Superintendent, all concerned personnel have been instructed to ensure that safety evaluations have been performed on all safety-related plant modi-fications. The modifications listed in the referenced Inspection Report have had safety analyses performed as of iis date.

2-By letter of 8 May 1978 from the Technical Services Superintendent to the Technical Support Engineer, instruction was given to update the referenced drawings and full compliance has been achieved this date.

b 80 02 280 $,)/

s J. P. O'Reilly Ref:

RII-WHB Page 2 All previous safety-related plant modifications are being reviewed 3-to ensure safety evaluations have been performed.

If there are further questions, please contact us.

Very truly yours, O. B. W /Ro c

~

W. P. Stewart Director, Power Production JC/rc Nucle'ar Plant Manager i