05000346/LER-1978-087-03, /03L-0:on 780801,regulating Rod Position Verification Not Completed at 4-h Intervals.Caused by Personnel Failure to Verify Insertion Limits.Required Control Rod Position Verification Completed

From kanterella
Revision as of 16:48, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 780801,regulating Rod Position Verification Not Completed at 4-h Intervals.Caused by Personnel Failure to Verify Insertion Limits.Required Control Rod Position Verification Completed
ML19326A336
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/28/1978
From: Hay J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19326A310 List:
References
LER-78-087-03L, LER-78-87-3L, NUDOCS 8002030154
Download: ML19326A336 (2)


LER-1978-087, /03L-0:on 780801,regulating Rod Position Verification Not Completed at 4-h Intervals.Caused by Personnel Failure to Verify Insertion Limits.Required Control Rod Position Verification Completed
Event date:
Report date:
3461978087R03 - NRC Website

text

................. _..

67 771 e

9 LICENSEE EVENT REPORT NTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 l H l D l B l S l 1 l@l 0 10 l-l0 lo lN lp lr l - l 0 l 3 [@l 4 l 1 l i l1 l 1 l@l l

l@

!o I 7

8 9 UChN.EE Coot le 15 UCEN3ENUM84R 26 26 uCENSE TYPE JO Si CAT $8 Ioi1i Eua$lLl@l0l516l-1013I4 l6 @l0l8l0I1l7lR @l 0 l 8'l 2 l 8 l 7 l8 l CON'T 60 61 coCKETNUMSER 63 69 EVENT oATE 14 IS REPCRT o ATE 40

?

8 EVENT DESCRIPTION ANO PRC8ABLE CONSEQUENCES h the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> surveillance re-l ITTTI J On 8/1/78 at 0850 hours0.00984 days <br />0.236 hours <br />0.00141 weeks <br />3.23425e-4 months <br />, station personnel discovered that

[

g 77l l quirements trere not met as per T.S. 3/4.1.3.6a, when the regulating rod insertion The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> verification should have begun when the unit entered i gT7] l alarm is inopet.able.

RTTI I Mode 2 on 7/23/78. There was no danger to the health and safety of the publi or to

[

RTa 1 I unit personnel. verification of insertion limits was comoleted once per shift since I

5099.01.

(NP-33-78-103) l g o l 7 l l startup as per Surveillance Test ST I

lotalI so OS oE su C E COMPONENT Coot Suscoot su E

l Rl Bl@ W@ l A l@ l Il Nl Sl Tl Rl U l@ lZ l@ lZ [@

g IJ 18 19 20 82.EQufMTIAu OCCURRENCE REPCRT Revision 7

8 9

to 18 LE R/Ro EVENT YEAR REPORT No.

Coof TYPE No.

' @,a,<p,g 1718 l g

la l817 l l/l 10l3l lL l g

10 l

_2 22 22 24 2s 27

s 2s so n

22 TAK N ACT of C P T

M TN MouRs 22 58 s foR S.

suPrut MA UFAC RER

% IZl@

lZl@

l Z l@

l0 10 10 17 l l Yl@

INl@

lZl@

l Z I Z lZ IZ l@

22 24 as se v

4o 4

42 42 44 47 CAUSE CESCRIPTION ANO CCRRECTIVE ACTIONS The control room coera-l li p o l l Personnel error is attributed as the cause of this occurrence.

for the insertion _J.1;aig. At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />.

m I tors did not oerform the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ver4 84c-mm l on 8/1/78, the Control Room completed the required control rod eosition verification.

[

from violation of Surveillance Require =ent 4.3.1.6a.

Thist

,,, y l This action removed the unit future recurrence.

I ii p i l report will be distributed to responsible persons to orevent so hPOWER oTHER STATUS at Y

otscoVERY oESCRiPTioN l I s ] l E l@ l0 l 3 l 8 l@l NA l

lC {@l NA l

STA toeAnoN or aEuAst @

l

  • !nviTY Co'# TENT AucuuroP Acuv.TY @ l A

l l

.EuAsEo on.EuAsE l NA liistIZi @ W @ lNA i

' nRicN~Et Ex,ossEs oEscaiProN @

I

~uM.Em Tvn L' LU l a l o i o l@l Z l@l NA

' n son ~Eu'iNu',Es oEsCai,Tio~@

l

~uM.

1010101@l NA [T~

3

o,Aciu Tv @ -

8002030\\6

'V 'as.s e, C. o CE l

Tv E oEsCairnCN lZI@l NA

~

~J 2

ao 7

1 9 to

~

NRC USE CNLY pusu

.Q

@l NA

~

l lIIIfIIIIfIIIi g,,,, g 68 69 30.3 419-259-5000 Ext. 267 ;

7 3 3 to DVR 78-135' James P. Hay

,,Oy E.,

2 m o

- m

O T

TOLEDO EDISON COMPANY d

DAVIS-BESSE UNIT ONE NUCLEAR POWER STATION SUPPLEMENTAL INFORMATION FOR LER NP-33-78-103 DATE OF EVENT: August 1,1978 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: The verification of the position of each regulating rod was not completed at the four (4) hour intervals.

.a Conditions Prior to Occurrence: The unit was in Mode 1, with Power OiWT) = 1050, and Load (EWE) = 330 Description of Occurrence: On August 1, 1978, at 0850 hours0.00984 days <br />0.236 hours <br />0.00141 weeks <br />3.23425e-4 months <br />, station personnel discovered that surveillance requirements were not met as per Technical Specifica-tion 3/4.1.3.6a.

This Technical Specification requires that the position of each regulating group shall be determined to be within the insertion, sequence, and overlap limits at least once every twleve (12) hours except when the regulating rod insertion alars is inoperable; then verify the groups to be within the inser-tion limits at least once per four (4) hours. The four hour verification should

,s j have begun when the. unit entered Mode 2 on July 23, 1978.

Designation of Apparent Cause of Occurrence:

Personnel error is attributed as the cause of this occurrence. The control room operators should Tiave been aware of the four hour verifications for the insertion limits. On July 23, 1978, at 1916 hours0.0222 days <br />0.532 hours <br />0.00317 weeks <br />7.29038e-4 months <br />, the reactor was critical. Since at this time the regulating rod insertion limit.

alarm was inoperable and the required four hour verification did not commence until August 1,1978 at 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br />, the unit was in violation of Technical Speci-fication 4.3.1.6a.

Analysis of Occurrence: There was no danger to the health and safety of the public or to unit personnel. Verification of insertion limits was completed once per shif t since startup as per Surveillance Test ST 5099.01.

Corrective Action

At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on August 1,1978, the Control Room completed the required control rod position verification. This action re=oved the unit from vio-lation of Surveillance Requirement 4.3.1.6a.

Also, copies of this report will be f

distributed to responsible persons to prevent future recurrence.

Failure Data: This is not a repetitive occurrence.

LER #78-087 m