05000346/LER-1978-049-03, /03L-0:on 780509,generator Load Not Constant & Diesel Generator Air Intake Low Pressure Alarm Received During Surveillance Test.Maint Insp Conducted But Cause Undetermined.Surveillance Test Completed 780514

From kanterella
Revision as of 16:48, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
/03L-0:on 780509,generator Load Not Constant & Diesel Generator Air Intake Low Pressure Alarm Received During Surveillance Test.Maint Insp Conducted But Cause Undetermined.Surveillance Test Completed 780514
ML19326A338
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/01/1978
From: Beeler T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19326A303 List:
References
LER-78-049-03L, LER-78-49-3L, NUDOCS 8002030156
Download: ML19326A338 (2)


LER-1978-049, /03L-0:on 780509,generator Load Not Constant & Diesel Generator Air Intake Low Pressure Alarm Received During Surveillance Test.Maint Insp Conducted But Cause Undetermined.Surveillance Test Completed 780514
Event date:
Report date:
3461978049R03 - NRC Website

text

L t

cCNTROL SLCCx: l l

I l

{$ l l

(PtEASE PRINT OR TYPY$6L REQU; RED It1 FORMATION) v i

! 01 al ul 31 si ll@l e l 01-10101 xl=ltI lol31@l4lilllilll@i i

l@

I 9

LICENSEE C;3g 14

5 LIC1*.11 %.?/51R 25 26 LICE?.it TYPE JQ 51 C^T 58

,j[0*T l Ll@l 0l 510l -l 01314'l 6 @l G l 5 l G I 9 l 7 l 8 l@l 0 i 6 I O I 117 I 8 l@

3 3

60 El 03:< ET %*.*3 R

6.3 63 EVENT QATE 74 75 REPCRT DATE 80 EVENT DESCRIPTION ;?40 PRC5 AELE CCNSECUENCES h 10121 1 At 1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> on "av 9, 1978. While nerfortine the Diesel Gener2Mr Refuelim Su M 1 l [o;s,l lance Test, the generator load would not stay constant and the diesel generator air I

'I o l a ; i intake low pressure alar = vas received.

The test was susuended at this coint, and thel l o l s t ; diesel generator declared inoperable.

There was no danger to the health and safety ofi I o 16 j l the public or Unit personnel.

The diesel Eenerator was not reouired for etE.rtencv l

l o { 7 l l Power during the period of time it was inocerable.

Diesel Generator 1-2 was ooerable l l c !e i I had e=ergency power been reCuired.

(X?-33-78-58)

I SJ 7

8 9 SYSTE*.?

CA*.II

CAUSE

C o?.t P.

VALVE CoCE CO:t SV3COct CcYPoNENT CODE SUBCODE SU8CCDE loisi I El 31@ l x l@ l x l@ IE IN ic II lx II l@ lxi@ lxi@

7 8

9 10 in 1:

12 18 la 23 SEoCENTial OCCURRENCE, REPORT REVIStoN LER mo EVENT YEAR R EPC AT NC.

CCOE TYPE No.

@ aE>:aT 17 18 l l_l lc i419 l l-]

I01 31 lLl l_I 10 l 21 22 24

6 27 23
9 30 31 32 07 AT*ACMYENT N P R O.4 PRl*.'E CO?.tp.

CO?.t PoN EN T 5%F0.a co."4 ACTION. 8UTU8 E E88ECT YET HOURS 22 susu TTED F OR'.! WS.

SUP PLI E R MANUFACTURER TAKEN ACT:C.N oN FLA*.T t

') I X l@Lz l@

lz'@

II l@

101010!

I lYl@

l N lg lJAl@

l Wl 219 l 0l@

33 34_

35 26 37 to 41 42 4

44 47

\\

/

CAUSE DESCRIPTION AND CCRRECT!VE AC lCNS @

l i l o ; l The cause of this occurrence is not known.

Extensive =aintenance investications were l li ii l l conducteld but the exact cause was not discovered. At 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br /> on Mav 14 1978.

,,,,,jSurveillance Test ST 5081.01, " Diesel Generator Menthlv Test" was co=cleted.

and the l l,,3, i diosel generator was declared coerable.

l 1

lt i 4-l l 80 7

8 9

'YA

%*CwER oTHER STATUS 15 ERY DISCOVERY o!$CRIPTioM l t is l l c l@ l0 (0 l0 l@ KA l

13 l@lsurveillanceTestsT 5081.02 l

'2 n

u 4

4

,0

'JTiviTY Cc'ETENT AucuNT oP ACwiTv @ i teC2TioNo,REtEAsE@

REu Asto

,RE u AsE i NA I

li is t i 21@ l Zl@l NA 7

8 9 10 11 44 45 60 PERSONNEL EXPOSURES NUYEER TYPE C ES CRI'TICN l1l 7 } l 010 l 0 l lZ

[ 5A l

PERSCNN E L INJ RIES NUYEEe ot$CRl8 TION l

!II8!

30 7

8 9 11 12 LCSS o8 CR oAY AGE TO FACILITY O, 8 0 0 2 0 3 0l5%

/~~N Tv E,l '"= r 8' m

/

i L J l ":

l lo 30 7

8 9 10 PLaitCITY NRC USE CNLY is!.qEc O!scaiPTicN l

l!lIl lll IlIllf l210l [h! NA 63 69 30 ;

g g 10 253 E-b19~2

~-

lI PHONE:

N A!.* E C F P D E P AR E R

=

TOLEDO EDISON' COMPANY DAVIS-3 ESSE UNIT ONE NUCLEAR PO*4ER STATION

,' _D SUPPLDEUAL INFORMATION FOR LER NP-33-78-38

(

)

e DATE OF EVENT: May 9, 19 78 FACILITY: Davis-Besse Unit 1 IDENTIFICATION OF OCCURRENCE: Diesel Generator 1-1 declared inoperable on May 9, 1978.

Conditions Prior to Occurrence: The unit was in Mode 6, with Power (}%T) = 0, and Load (Mh'E) = 0.

Descriution of occurrence: At 1745 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.639725e-4 months <br /> on May 9,1978, while perfor=ing Surveil-lance Test ST 5081.02, " Diesel Generator Refueling Surveillance Test", the genera-tor load would not stay constant and the diesel generator air intake low pressure alarm was received. The test was suspended at this point, and the diesel generator declared inoperable.

This occurrence did not place the unit in the Action Statenent of the Technical Specification 3.8.1.2 because the plant Was in Mode 6 which requires only one diesel generator to be operable while in Modes 5 and 6.

I h

\\

' Designation of Accarent Cause of Occurrence:

The cause of this occurrence is not known.

Analysis of Occurrence:

There was no danger to the health and safety of the public or to unit personnel.

The diesel generator was not required for energency power during the period of ti=e it was inoperable.

Diesel Generator 1-2 yas operable had e=ergency power been required.

Corrective Action

Under Maintenance Work Order IC-322-78, Diesel Generator 1-1 Air Intake Lov Pressure Switch was checked for calibration and operation.

It was found satis %ctory.

Under Maintenance Work Orders 78-1184 and 78-1192 unit per-sonnel worken with Woodvard field service engineers to assure proper governor operation. Maintenance Work Order 78-1209 was issued to check Diesel Generator 1-1 intake air pressure, all inlet pipe joints for leakage, oil bath filter for blockage and found none.

At 0415 hours0.0048 days <br />0.115 hours <br />6.861772e-4 weeks <br />1.579075e-4 months <br /> on 167 14, 1978, Surveillance Test ST 5081.01, " Diesel Generator Monthly Test" was cc=pleted, and the diesel generator was declared operable.

vailure Data:

There have been no previous failures of the Diesel Generators used by load fluctuations.

LER #78-049