ML19326B862

From kanterella
Revision as of 08:50, 31 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Provisional CP & Notice of Issuance
ML19326B862
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/06/1968
From: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326B863 List:
References
NUDOCS 8004180598
Download: ML19326B862 (1)


Text

.

DIST 'TUTION:

"g!.

AEC w J Formal 1

Suppl.

DR Reading DRL Reading RPB-3 Reading Orig:

FWKaras (2)

R. S. Boyd EC 6M Docket Nos. 50-313 T. P. Engelhardt, OGC L. Kornblith (2)

N. Dube (2) bec: d. $k6dIB M r, DML J. R. Buchanan, ORNL E. E. Hall, RDT Arkansas Power & Light Cougany J. A. Harris, PI Sixth and Fine Streets E. B. Tremmel, IP Pine Bluff, Arkansas 71601 R. Leith, OC J. Verme, NIH Attention:

Mr. J. D. Phillips Vice President and Chief Engineer. A. Wells, ASLB A

Centlenes:

Provisional Coestruction Permit No. CFF1-57 is enclosed, together with a copy of a' related notica which has been forwarded to the office of the Federal Bagister for filing and publication.

The construction permit authorizes the Arkansas Power & Light Company to construct a pressurized water nuclear reactor designated as the Russellville Nuclear Unit on the Company's site in Pope County, Arkansas.

The construction permit has been issued pursuant to the Initial Decision of the Atomic Safety and Licensing Board. A copy of the decision has already been cent to you.

Sincerely yours, Original Signed by veter A. Morris Peter A. Morris, Director Division of Reactor Licensing

Enclosures:

As stated above Dist. Cont.

D. Skovholt 8 M4180.[ff q

PRB /DRL

_RP2-3/DRL OGC RP:DRL DRL

\\

omer>

//W, Ik k,,_

(

we, FWKaras peg __

Long RSBoyd PAMorr s I

b /68 12/

/68

/2VM /68

,I/[g/68

,_t1/

,,m, 11/27/68

,j

.ats (an. m

,,,,,,,,,,,,,,,,cy,,,,_,.m,

-