Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-338/80-22 & 50-339/80-13
ML19331D296
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 07/25/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19331D297 List:
References
NUDOCS 8008280235
Download: ML19331D296 (1)


See also: IR 05000338/1980022

Text

),,

UNITED STATES

/

8

NUCLEAR REGULATORY COMMISSION

~

'

o

'.

-

E

REGION ll

101 MARIETTA ST

N.W.. SUITE 3100

hy

  • g

8

ATLANTA, GEORGIA 30303

,

%,

,e

.....

In Reply Refer To:

'

RII:EJF

50-338/80-22

50-339/80-13

.

Virginia Electric and Power Company

ATTN:

J. H. Ferguson

Executive Vice President-Power

P. O. Box 26666

Richmond, VA 23261

Gentlemen:

Thank you for your letter of July 2,1980 informing us of ateps you have taken

to correct the item of noncompliance concerning activities under NRC License No.

NPF-4 brought to your attention in our letter of June 5, 1980. We will examine

your corrective actions and plans during subsequent inspections.

We appreciate your cooperation with us.

.

Sincerely,

e

f.c.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

cc w/ encl:

W. R. Cartwright, Station Manager

P. G. Perry, Senior Resident Engineer

.

.8008280 gg g

. - 7-

- . . _

-.

.

.

. . . _ . . . - . .

_

-

_ _ _ _

'

n,

.

,

.

. < .

.

..r.3.e n g e nt % .

.

VIRGINIA EI.scrRIC AND PowgpoMyANY ' . <

o

Rrenuoxn,VamonwzA 202s1

l

July 2,1980)3t' ') I-

0

.

Mr. James P. O'Reilly, Director

Serial No. 522

Office of Inspection and Enforcement

N0/RMT:ms

U. S. Nuclear Regulatory Commission

Docket Nos. 50-338

Region II

50-339

101 Marietta Street, Suite 3100

License Nos. NPF-4

Atlanta, Georgia

30303

NPF-7

Dear Mr. O'Reilly:

We have reviewed your letter of June 5,

1980, in reference to the inspection

conducted at North Anna Power Station on May 12 through 16, 1980, and reported

in IE Inspection Report Nos. 50-338/80-22 and 50-339/80-13.

Our response to

the specific infraction is attached.

-

We have determined that no proprietary information is contained in the

reports.

Accordingly, the Virginia Electric and Power Company has no objec-

tion to these inspection reports being made a matter of public disclosure.

Very truly yours,

4)

B. R. Sylvia

Manager - Nuclear

Operations and Maintenance

Attachment

i

l

cc:

Mr. Robert A. Clark, Chief

l

l

D VF

OFFICIAL COPY

i

gooyo702T3

j

. - .

.

. .

.__

_

.

..

_

.

___

+

Attachment

.

.

.,'

Pag 1

-

RESPONSE TO NOTICE OF VIOLATION

ITEM REPORTED IN IE INSPECTION REPORT NO.

.

50-338/80-22 AND 50-339/80-13

NRC COMMENT

,

As required by Technical Specificatins 4.0.2.a and 4.8.2.3.2.a, the

125-volt battery bank and charger shall be demonstrated operable at

least once per 7 days with a maximum allowable extension not to exceed

25% of the surveillance interval by verifying electrolyte level,

specific gravity cell voltage and overall battery voltage are within

stated specifications.

Contrary to the above, periodic test procedure 1-PT-85 (D.C. Distri-

bution Systems) was performed on April 3, 1980 and April 13, 1980. This

interval is in excess of Technical Specification requirements.

This is an infraction.

A similar item was brought to your attention in

our letter dated January 29, 1980.

'

RESPONSE

The above infraction is correct as stated.

Specifically pursuant to Section 2.201 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, the following information

is submitted.

.

1.

Corrective steps taken and results achieved:

A review of our test control program was made and it was

determined that the periodic testing programs described in the

Nuclear Power Station Quality Assurance Manual,Section II,-

paragraph 5.3 is adequate.

Since the test control program is adequate, station management

will reemphasize the requirements of periodic test scheduling.

The reemphasis will include the requirements of technical specification 4.0.2,

the allowable extension period for

surveillance requirements.

.

2.

Corrective action taken to avoid further non-compliance:

To ensure established procedures are followed correctly,

station management will distribute a letter reemphasizing the

requirements of periodic test scheduling to station supervi-

sors.

Station supervisors "ill then discuss this letter with

their personnel.

3.

'Date when full compliance will be achieved:

Full compliance

will be achieved by July 15, 1980.

-

. . - . .

.-