ML19338F928

From kanterella
Revision as of 13:12, 25 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19338F928
Person / Time
Site: Rancho Seco
Issue date: 10/02/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8010280031
Download: ML19338F928 (1)


Text

N

. p %Ct109 8

  1. o UNITED STATES 8

N NUCLEAR REGULATORY COMMISSION 5

E REGION V e[

o 1990 N. CALIFORNIA BOULEVARD l

g SUITE 202, WALNUT CREEK PLAZA 4,,,a WALNUT CREEK, CALIFORNIA 94596 October 2, 1980 Docket ilo. 50-312 SacraiaentU Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Attention: Mr. John J. flattimoe l

Assistant General Manager Gentlemen:

The enclosed Circular No. 80-22 is forwarded to you for information.

ilo l

written response is required.

Should you nave any questions related to your understanding of the recommendations on this matter, please contact this office.

i Sincerely,

/

\\

/

'/

[

,/

/ En e

h girector I

Enclosures:

1.

IE Circular !!o. 80-22 j

2.

Recently issued IE Circulars l

l cc w/ enclosures:

R. J. Rodriguez, SMUD L. G. Schwieger, SMUD 7

1 l

l 801028003I g

SSINS: 6830 Accession No.:

8006190055 IEC 80-22 UNITED STATES flUCLEAR REGULATORY COMMISSION T

3 c'

0FFICE OF INSPECTION AND ENFORCEMENT J

WASHINGTON, D.C.

20555 3

October 2, 1980 IE Circular No. 80-22:

CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through

nternal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your eniployment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we rec' nmend that you take prompt remedial action in this regard.

No written response to this Circular is required.

If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.

1 XL.

^ J_,..

~

';. " T : L L::: g

.r..,_

,,-'LC

.g.

am e

M

.y

-a p

_e ed

  • h-L -.

4

,.es 8

A

j l

IEC 80-22 October 2, 1980 l

RECEllTLY ISSUED IE CIRCULARS Circular Date of No.

Subject Issue Issued to 80-21 Regulation of refueling 9/10/80 All holders of a crews power reactor OL or CP 80-20 Changes in Safe-Slab Tank 8/21/80 All Part 50 and Part Dimensions 70 fuel facility licensees 80-19 Noncompliance with 8/26/80 All medical licensees j

License Requirements for fledical Licensees 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor Evaluations for Changes to facilities with an Radioactive Waste Treatment OL or CP Systems 80-17 Fuel Pin Damage Due to Water 7/23/80 All holders of PWR-Jct from Baffle Plate Corner Ols and PWR cps 80-16 Operational Deficiencies In 6/27/80 All power reactor Rosemount Model 510DU Trip i

Units And Model 1152 Pressure facilities with an OL or a CP Transmitters 80-15 Loss of Reactor Coolant Pump 6/20/80 All power reactor Cooling and liatural Circula-facilities with an tion Cooldown OL or CP j

80-14 Radioactive Contamination of 6/24/80 All holders of power Plant Demineralized Water and research reactor i

System and Resultant Internal licenses (operating Conta nination of Personnel and construction permits), and fuel cycle licensees 80-13 Grid Strap Damage.in 5/18/80 All holders of reactor Westinghouse Fuel Assemblies OLs and cps 80-12 Valve-Shaf t-To-Actuator Key 5/14/80

-All holders of reactor May Fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube Oil Cooler Failures reactor OL or CP

,-m--

.y y

p,-s

-nnv-

,,,.--,-n

--,a r

e.

.m n-,,w---n e---

,,--,m ye, v--