YLECTRIC ES OdswayPrare Deeember 7, 1989 I
I Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i
ULNRC-2122 Dear Sirt DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1989 The enclosed Monthly (cperating Report for November,1989 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
. D. Blosser i
Manager, Callaway Plant
/
Dif h $>' On JDE/DET/RDA/ TAM /RJM/ crc Enclosure cc Distribution attached
.8912200349 891130
--PDR -ADOCK 05000493 R-PDC i
Mahng A#ess' P.O Box 62Q Flitort MO 652S1
1h (h '.' ':
~
, g; 1
n,
~*
i I
cc distribution for ULNRC-2122' I
t i
f
.with enclosures i
- Mr. Robert DeFayette, Chief
.}
Project Section:1A-
[
U._S. Nuclear Regulatory Commission y
Region 1111 7-799 Roosevelt Road
[
Glen Ellyn IL 60137 F
l
[
Mr. Thomas Alexion (2 copies)
.I U. S. Nuclear Regulatory Commission
' Office of Nuclear Reactor Regulation
.)
' Mail Stop P-316
-j 7920 Norfolk Avenue i
ff
- Bethesda, MD' 20014 i
3
+
r.
e l
NRC Resident Inspector iO Manager, Electric Department Missouri Public Service Commission i
P.-O. Box 360 l
D Jefferson City MO 65102 I
I i
- i I
~
r
(
I f
i.;
r 1
s i
t I
I 4
l k
'y
g j.,
1 F
..l ' -
u
. i'!?
/,9
o-
. 4 r,
~ DOCKET NO.
50-483
.lmIt'NAME CALLAWAY IMIT 1 ll-DAfE.
'12 07 89
.o COMPLETED BY R. J. McCann TELEPHONE 314/676 8243, s
fJ N
e PART A-OhERATIONS SIM4ARY
,V..
the plant operated at approximately 100% power with the following exception.
i.
, >^
i f i:
' 1.
On11/3/89loadwasreducEdtoapproximately20%inottertorepairanairlinefiltergasketfor
. normal RCS letdown flow control valves BC-14V-0459 and 0450. Tull power operation resumed early the next day.
l.,
'PART B.
PORY AND SAFETY VALVE SIMtARY
'None 3,
s h
1'
- l..y, t,
1 l;
- p Page 1 of 4
- 'o 4
4$ "
- t-
- { d;'
o
'i$,
. y.
Part C AVERACE DAILY UNIT POWEL LEVEL p,,
b-DOCKET NO.
50-483 UNIT NAME~
CALLAWAY UNIT 1
'DATE 12-07-89 COMPLE1ID BY R. J. McCann TELEPHONE 314/676 8243 4.,-
MONTH:
HOVEM8ER 1989 l
s'p AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL M
(MWe Net)
.g (MWe Net) 1 1188-17 1188-2 1192 18 1191 3
869 19 1183 4-1032-20 1180-5 1175 21
-1190'
.6 1184 22 1192~
7
-1185 23.
1191
.j
'8' 1186 24 1186-
~
9' 1184 25' 1185 s
-10 1185 26 1186 11 1177' 27 1180 12 1179 28 1194 m
13 1167 29 1191 i
14 1171 30 1190 l -
15 1188 16 1191 Page 2 of 4
9,
.s N
'f-Part D OPERATING DATA REPORT j
e IXX'KET NO.
50 483 UNIT NAME CALLAWAY UNIT 1 DATE 12 07 89 COMPLETED BY R. J. McCann t:
TELEP110NE.
-314/676-8243 I
OPERATING STAITS e
(YTD CUN )
1.
REPORTINC PERIOD: NOVEMBER 1989 CROSS Il0URS IN REPORTING PERIOD:
720 8,016 43,357.$
l 2 CURRENTLY AUTil0RIZED POWER IIVEL (MWt):
3565 MAX. DEPEND. CAPACITY (MWe Net):- 1118 DESIGN ELECTRICAL RATINC (MWe Net):
1171 i
3.-
POWER LEVEL TO WIIICH RESTRICTED (IF ANY) (MWe Net):
t '
i; 4
REASONS FOR RESTRICTION (IF ANY):
{
THfS MONTil Ylt TO DATF
_CU_MULATIVE i
5.
NUMBER OF HOURS REACTOR WAS CRITICAL...............
720 6,737.6 37,236.4
.j i
6.
REACIVR RESERVE SHUTDOWN 110URS.....................
0 0
0 i'
- 7.. Il0URS CENERATOR ON LINE............................
MO -
6,625.9 36,210.4
-i 8.
UNIT PISERVE SIIUTDOWN ll0URS........................
0 0
0 9
CROSS TilERMAL ENERCY GENERATED (MWil)...............
2,529,924 22,903,373 138,789,984
- 10. CROSS ELECTRICAL ENERCY CENERATED (MWil)............
881,030 7,838,443 40,271,993 i
- 11. ' NET ELECTRICAL ENERCY CENERATED (MWH)..............
841,885 7,466,112 38,210,313 s
12.-. REACTOR SERVICE FACTOR.............................
100 84.1 85.9 i
- 13. REACTOR AVAILABILITY FACTOR........................
100 84.1 85.9
- 14 UNIT SERVICE FACTOR................................
100 82.7 83.5 i
i
- 15. UNIT AVAILABILITY FACTOR...........................
100 82.7-83.5.
i 16 UNIT CAPACITY FACTOR (Using MDC)...................
104.6 83.3 78.8
+.
- 17. - UNIT CAPACITY FACTOR (Us ing Des ign HWe)............
99.9 79.5 75.3
+
- 18. UNIT FORCED OUTAGE RATE............................
0 1.2 3.5 h
. 19. - SHUTDOWNS SCllEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACil):
20.-
IF Sl!UT DOWN AT END OF PIPORTING PERIOD, ESTIMATED DATE Of STARTUP:
i Page 3 of 4 i
I.-
.n.
g~
. ~c
.mm
= - - - -
a, -
4 26,.i a
Part E-
- E**^
UNIT SHUTDOWNS AND POWER REDCCTIONS D00EI NO.
L50-483 ENIT NAPE "
CM.IAMT UNIT 1 DATE 12-07-89 COPFLETED BT l R. J.~McConn TELEPHONE 314/676-8243-REPORI MONIN: NOVEMBER 1989 4
MEIHOD OF TYPE SHUITING DOWN F: FORCED DURATION THE REACIUR OR
(^fj g
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CURRECTTYE ACT10NS/ COP 9ENTS 13 11/3/89 F-0 A
1 On 11/3/89, load was reduced to approximately 20% in order to repair an air line filter gasket for normel RCS letdown flow control valves BC-LC7-0459 and 0%0. Full power operation resweed early the next day.
4 SU!91 ART:
REASON PETHO3 A EQUIPMENT FAIIIRE (EXPIAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORT RESTRICTION 4! OTHER (EXPIAIN)
E: OPERATOR TRAINING AND LICENSE EKAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OINEF (EXPLAIN)
Page 4 of 4-
.... ~..
~ ~.
..