ML19351F423

From kanterella
Revision as of 17:44, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Request for Addl Info Re Guard Training & Qualification Plan.Requests Resubmittal of Revised Plan within 30 Days
ML19351F423
Person / Time
Site: Bellefonte  
Issue date: 01/08/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8101130013
Download: ML19351F423 (3)


Text

CD 5

s

/

h P'"%

,,(

f,,

UNITED STATES NUCLEAR REGULATORY COMMISSION

<>."I e

o WASHINGTON, D. C. 20555

]

h]

o

,/g tes 19 9 ]

5

's Ju 2

m rw

.e to i

Docket Nos.:

50-438 and 50-439 Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500 A Chestnut Street, Tower II Chattanooga, Tennessee 37401

Dear Mr. Parris:

Subject:

Bellefonte Guard Training and Qualification Plan As a result of our review of the Bellefonte's Guard Training and Qualification Plan changes dated October 1,1980, we find that the plan needs further revisions and additional information should be supplied. The specific information reqijired is listed in the Enclosure.

Please resubmit your revised plan within thirty (30) days after receipt of this letter.

If you desire any discussion or clarification of the information requested, please contact A. Bournia, Licensing Project Manager, (301) 492-7200.

Sincerely, n

0 p1 no Rober

.. Tede co, Assis ant Director for Licensing l

Division of Licensing

Enclosure:

Request for Additional Informatica cc: See next page l

l l

l 8 3 01180oIS 1

F

Mr. H. G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401 cc: Herbert S. Sanger, Jr., Esq.

General Counsel Tennessee Valley Authority 400 Commerce Avenue, E11833 Knoxville, Tennessee 37902 Mr. H. N. Culver Tennessee Valley Authority 400 Commerce Avenue, 249A HBB Knoxville, Tennessee 37902 Mr. D. Terrill Licensing Engineer Tennessee Valley Authority 400 Chestnut Street Tower - II Chattanooga, Tennessee 37401 Mr. R. A. Wallin Babcock & Wilcox Company P. O. Box 1260 Lynchburg, Virginia 24505 Mr. Robert B. Borsum Babcock & Wilcox Company Suite 420 7735 Old Georgetown Road Bethesda, Maryland 20014 Mr. J. F. Cox Tennessee Valley Authority 400 Commerce Avenue, W10C131C Knoxville, Tennessee 37902 Resident Inspector Bellefonte NPS c/o U. S. Nuclear Regulatory Commission P. O. Box 477 Hollywood, Alabama 35752

o ENCLOSURE C0!EENTS ON BELLEFONTE GUARD TRAINING PLAN Introductory Comment In order to find the training and qualification plan acceptable, the following information must be incorporated into the appropriate sections of the plan.

Soecific Comments 1.3 Revise this section to commit to the physical examination within the 30 day period preceding the demonstration of physical fitness.

Task 16 State the minimum passing score for qualifying with the rifle (S3!.').

General Comments Sections 3.1 thru 3.8 of NUREG-0674 identify crucial security force functions and duties. All of the information described in these functions and duties m'ust be added into the appropriate existing tasks in Chapter 6 of the plan and, where necessary, in new tasks. The current references to security procedures should be deleted.

1 l

l l

l l

i l

t l

j.

_