Text
,
,
/g&* Utuq'o
fj,G
.
'
UNITE D STATES
8 '
3,
NUCLEAR REGULATORY COMMISSION
cI
REGION 111
$
- " ' -
g
b[
799 ROOSEVELT ROAD
'.g
.
o
GLEN ELLYN, ILLINOIS Go137
FED
21:2
<_
s,-
N'h.;y///,,p ',
- ~ ,
9'
Docket No. 50-329
, f(-. , ,
- i
f
d',.
Docket No. 50-330
A/
dC
.__; + 4 .4,
' s>
-
Mm
0 .s
!
Consumers Power Company
'pq
q.
cg.
1
ATTN:
Mr. James W. Cook
D
N/g
A Qr
. /
Vice President, Midland Project
-x
0
- @!
1945 West Parnall Road
Q'.
Jackson, MI 49201
@
Gentlemen:
This refers to the routine inspection conducted by Messrs. E. J. Gallagher,
R. B. Landsman, and R. Sutphin of this office on January 7-9, 1981 of activities
at the Midland Nuclear Power Plast, Units 1 and 2 authorized by NRC Construction
Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings with
Mr. W. R. Bird at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. - Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observation.s, and
interviews with personnel.
During this inspection,'certain of your activities appeared to be in noa-
compliance with NRC requirements, as described in the enclosed Appendix A,
and a writt en response is required.
Certain other activities, set forth in AppendiE B to this letter, appear to
be a deviation from commitments which you have made in previous correspondence
with the Commission. Please advise us in writing within twenty-five days of
the date of this letter of the corrective action you have taken or plan to
take, showing the estimated date of completion with regard to this deviation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office,'within twenty-five days of the date of this letter, to withhold
8108160
.
.
Consumers Power Company
-
2_-
such information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
James G. Keppler
Director
Enclosures:
1.
Appendix A, Notice of
Vic1ation
2.
Appendix B, Notice of
Deviation
3.
IE Inspection Reports
No. 50-329/81-01 and
No. 50-330/81-01
cc w/encls: