ML20003C756

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 810107-09
ML20003C756
Person / Time
Site: Midland
Issue date: 01/28/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20003C751 List:
References
50-329-81-01, 50-329-81-1, 50-330-81-01, 50-330-81-1, NUDOCS 8103180208
Download: ML20003C756 (1)


Text

F U

Appendix B NOTICE OF DEVIATION Consumers Power Company Docket No. 50-329 Docket No. 50-330 As a result of the inspection conducted on January 7-9, 1981, the foIIowing was cited as a deviation.

10 CFR 50, Section 50.54(f) response from CPCo to Question 23, Subsection 3.7 states in part, "One full time and one part time onsite geotechnical engineer have been assigned. These engineers provide technical direction and monitoring of the process."

Contrary to the above it was determined that the assigned engineering technician does not satisfy the commitment made in 10 CFR 50.54(f) submitted to provide an onsite geotechnical engineer and to implement the duties and responsibilities of FIC 1.100, Appendix A, " Duties & Responsibilities of the Onsite Geotechnical Engineer".

W S108180 2 O 3 -

- -.-.-. -