ML20003E529
| ML20003E529 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 03/20/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20003E530 | List: |
| References | |
| NUDOCS 8104060047 | |
| Download: ML20003E529 (2) | |
See also: IR 05000546/1981003
Text
_
-
-
_
_.
. ..
[p uu ^%
UNITED STATES
[ ~
.# c
j
NUCLEAR REGULATORY COMMISSION
g
.r
REGION lli
g
g'
7ee ROOSEVELT ROAD
s, -
f
cLEN ELLYN, RUNot$ So137
- ...e
March 20, 1981
cpt\\l*
.
P;/
-
h/*
84([~[ p"'ht
Docket No. 50-546
(
-
Cocket No. 50-547
9
.
,
9
27
--
Public Service of Indiana
N
ATTN:
Mr. S. W. Shields
%
08/.A
is%eyre.,
Senior Vice President
c,y
ff
Nuclear Division
Post Office Box 190
4.
,4, s
New Washington, IN 47162
eg [,59
Gentlemen:
This refers to the routine inspection conducted by Mr. J. J. Harrison of
this office on February 1-28, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Messrs. Petro, Ramsett, and others of your staff at the conclusion of the
inspection.
The enclosed ccpy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, obrervations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Seccion 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows. If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty-five days of the date of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclo::ure
to the application.
'8'104gg g nq3 _
9
- -
-
-
- - -
- -
-
--
-
-- --
-
- - -- -
-
.
.
.
Public Service of Indiana
-2-
March 20,1981
'Je will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Acting Director
Division of Resident and
Project Inspection
Enclosure:
IE Inspection
Report No. 50-546/81-03
and No. 50-547/81-03
cc w/ encl:
'4.
M. Petro, Project
Director
C. Kamerer, CA
J. E. Sniezek, IE
Central Files
Reproduction L' nit NRC 20b
Local PDR
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
RIII
R
,
RIII
R
RII
g
. Harrison /jo
Schweibinz
Fio lli
Little
He
man
i
'
3/17/81
3'/[-fl
3